Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.

Slides:



Advertisements
Similar presentations
1 Electricity Markets and Policy Group Energy Analysis Department Exploration of Resource and Transmission Expansion Decisions in the Western Renewable.
Advertisements

July 18, 2008, Atlas Copco Group Q2 Results July 18, 2008.
Amendment 3/5 Workshop.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Resource Adequacy in PJM
IAS-1 Illustrative Example-Critical Accounting Estimates and Judgements Estimates and judgements are continually evaluated and are based on historical.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Greenhouse Gas Emissions Reductions from Wind Energy : Location, Location, Location? Duncan Callaway SNRE & Department of Mechanical Engineering
Capital Budgeting n Process of identifying, evaluating, and selecting capital projects n Capital projects involve the purchase of a long-term (fixed) asset.
Depreciation of Non-Current Assets Chapter 11 Part One.
ACCOUNTING CONCEPTS. BASIC CASH FLOW MODEL  REVENUES = PRICE * VOLUME = R  SALVAGE = VALUE OF CAPITAL AT THE END OF THE PROJECT LIFE = S  PROFIT =
Receivables Management.
Wind Power – Various Levels Small (10 kW) Homes Farms Remote Application Intermediate ( kW) Village Power Hybrid Systems Distributed Power Large.
Small Farm Profitability: Is Wind Energy the Answer? 1
Bruce Sharp, P. Eng. Director, Electricity Aegent Energy Advisors Inc May 15, 2014.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
CAPITAL BUDGETING (REVIEW)
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
2014 Budget Department Presentations Infrastructure Funding Options.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Transmission and the Growth of Wind Energy November 2011.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
KEC Electricity Committee, March 12, 2008 Benefit Cost Study of the Governor’s 2015 Wind Challenge: 1,000 MW by 2015 Bob Glass KCC Utilities Division,
Network Customer Meeting Access Metric Update November 16, 2006.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
CFC: Created and Owned by America’s Electric Cooperative Network Electric Rate Concepts In an Era of Change Oregon Statewide Directors Workshop Rod Crile.
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Energy Northwest Executive Board Meeting February 27, 2003.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Regulatory Reform to Support New Infrastructure Steve Kidwell MARC 2010 June 7, 2010.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
October 6, 2005 Edward Cebron, FCS GROUP Including Interest Costs in Impact Fees: Economics, Equity and Methods NATIONAL IMPACT FEE ROUNDTABLE th.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Southwest Power Pool ITP-20 Generating Resources May 25, 2010.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
FMPA Strawman Proposal: Order 1000, Regional Planning and Cost Allocation Stakeholder Meeting May 2,
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Nassau-Amelia Utilities FY 2008 Utility Rate Study Presented by: Andrew J. Burnham July 9, 2007 Nassau-Amelia Utilities.
Photovoltaic Systems – Residential Scale Part 1 March 17, 2014.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Engineering, Policy, Finance
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
Rate Design Proposal for SPP: Integrated Transmission Plan and Priority Projects Mike Proctor CAWG May 27, 2009.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1. Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee 11/30/2010 DRAFT.
DG Projections in the Western Interconnection March 15, 2016 Zach Ming, Consultant Nick Schlag, Managing Consultant Arne Olson, Partner.
Distributed Generation Chau Nguyen, Pricing & Sales Support
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Contents Introduction Focus area Wind scenarios
Capital Financing Strategy
FY Proposed Budget and Rates
ENGINEERING ECONOMIC DECISION CHAPTER 1
Idyllwild Water District
HUDSON HOUSING CAPITAL EFFECT OF TAX REFORM ON PRICING
Presentation transcript:

Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009

Benefits Beyond Adjusted Production Cost Already Discussed –Line loss benefits –Additional reliability benefits –Reductions in capacity margin and reserves –Increased options for different futures What we haven’t discussed is a way to use the wind resources we are attempting to reach to help solve cost problems

What are the cost problems? Many benefits go to tier one entities that do not have to fund the investment –SPP and others have attempted to minimize this by not evaluating benefits and costs of “export legs” of the EHV buildout –“rebalancing these costs leads to large rate impacts for some entities soley based upon location in a zone and past construction decisions. Is there a way to justify access to the wind resources and fund investment for this access?

NREL Wind Maps SPP Maps for all states except Louisiana Western regions of SPP have superior wind resources (class 4 or better) Eastern regions of SPP have lesser wind resources (class 3 at best)

What does this show? Wind Resources are significantly located in the Western regions of SPP Very limited wind resources in Missouri, Arkansas, and eastern SPP portions of Texas, Kansas, Oklahoma –Eastern Nebraska and Kansas have some class 4 wind resources

What difference does wind class make?

Capacity Factor vs Wind Class

Production of Same Wind Equipment at Different Wind Classes

Basic Equations C c = installed capital costs of wind generation in $/kw C r = Charge Rate (carrying charge - %) –Pretax ROR + Depreciation O m = O&M costs in $/MWH T c = Production Tax Credit in $/MWH H = O m – T c C F = Capacity Factor - % A C = Annual Costs in $/KW of installed capacity

Basic Equations (cont) A C = C c C r + HC F ( 8760 ) 1000 Then A C = C c C r HC F

What Is Location Worth? Assume 2 wind units, same installed costs, variable O&M, PTC, and carrying costs –The only difference is average wind speed or capacity factor Then, A C1 = C c C r HC F1 A C2 = C c C r HC F2 –Therefore A C1 - A C2 = 8.76 H(C F1 - C F2 )

Example Used in Analysis of Wind Generation Costs C c C r - Overall annual fixed costs of $ per KW installed nameplate capacity –12% pretax ROR –5% depreciation (twenty years) –Results in 17% carrying charge –$1920/KW of installed nameplate capacity May 2008 DOE EERE publication O m - $9/MWH average O&M costs T c - $20/MWH PTC then H = -$11/MWH, therefore, A C1 - A C2 = 8.76 H(C F1 - C F2 ), goes to A C1 - A C2 = (C F1 - C F2 )

Annual Cost per MWH of New Wind Generation Based on Wind Class Average

How much is the increase worth?

How much transmission investment is justified to access better wind resources?

How much transmission investment is justified to access better wind resources? (cont)

Base Case Assumption Moving from East to West Increases Capacity Factor by Around 50%

Things to consider for EHV system Is there a method of using an access fee for better wind resources to justify portions of the EHV buildout? –This may allow consideration of the export legs of EHV plan –Export legs of EHV plan may bring additional benefits to Eastern SPP transmission zones But typically many benefits to tier 1 These benefits could be captured with some type of access charge for funding the EHV buildout –Nebraska should be included in EHV proposals

Wind Access Fee Is there a way to charge a wind access fee that would be equitable for both regional customers and customers outside SPP? –For example could the wind access fee be a credit to zones already paying an SPP regional EHV rate? –Could the export revenue be used to lower costs and justify expansion? –Could “reservations” be used to justify EHV expansion (such as an export capacity auction?)