Project 2009-01 Disturbance and Sabotage Reporting (Event Reporting) Project Webinar July 30, 2012.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
PER
PER Update & Compliance Lessons Learned
FRCC Fall Compliance Workshop October , 2013
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
Project Cyber Security Order 706 January 10, 2012 Most of the material presented has been compiled from NERC webinars and drafting team meetings.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
WECC and NERC Protection Criteria and Standards
Reliability Standards Update
Cyber Security Standard Workshop Status of Draft Cyber Security Standards Larry Bugh ECAR Standard Drafting Team Chair January 2005.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
Update in NERC CIP Activities June 5, Update on CIP Update on Revisions to CIP Version 5 –BES Cyber Asset Survey –Implementation Plan Questions.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Lisa Wood, CISA, CBRM, CBRA Compliance Auditor, Cyber Security
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Project Cyber Security Order 706 Version 5 CIP Standards Potential to Adversely Impact ERCOT Black Start Capability.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
EOP Project Emergency Operations Regional Outreach WECC ISAS Meeting August 20, 21, 2014.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Project Standard Drafting Team (IRO SDT) Stephen Solis, IRO-SDT NSRS Meeting June 1, 2015.
WECC – NERC Standards Update
WECC Regional Standards Update
Western Electricity Coordinating Council
NERC Cyber Security Standards Pre-Ballot Review
NERC AWARENESS TRAINING
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Project Disturbance and Sabotage Reporting (Event Reporting) Project Webinar July 30, 2012.
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Steve Rueckert – Director of Standards
NERC AWARENESS TRAINING
WECC – NERC Standards Update
Peak Reliability IRO Webinar
Presentation transcript:

Project Disturbance and Sabotage Reporting (Event Reporting) Project Webinar July 30, 2012

2RELIABILITY | ACCOUNTABILITY Project Event Reporting On the webinar: Evans-Mongeon, DePoorter, Draxton, Hartmann, Canada, Crutchfield Project Failed in last ballot with 46% support SDT met in June to review comments and prepare for the next round. Informal outreach during July

3RELIABILITY | ACCOUNTABILITY Project Event Reporting Standard has been revised based upon industry comments:  3 Requirements – Have a Plan, Report, Validate  Updated Attachments 1 and 2  Modified Applicability  Return CIP-008 R1.3 back …

4RELIABILITY | ACCOUNTABILITY Project Event Reporting Prior to the last comment period, the EOP SDT received comments about the need to address the potential for double jeopardy with CIP R1.3 and the term “reportable Cyber Security Incident”. Working with Steve Noess, we addressed both and offered the industry our thoughts on how best to incorporate the CIP reporting requirements into Project  We were leaving the determination of a rCSI with CIP-008; however, reporting under R1.3 would eliminated in V3 and V4 upon FERC acceptance.  Under V3 and V4, the term would remain “reportable Cyber Security Incident”; but upon the enforcement of V5, the term would be updated to “Reportable Cyber Security Incident” consistent with that new definition.

5RELIABILITY | ACCOUNTABILITY Project Event Reporting Project had previously determined that a FERC Order Directive needed to be addressed. Paragraph 407 of FERC Order 706 directed the CIP Reliability Standards be updated to reflect a one-hour reporting threshold for reportable Cyber Security Incidents. Project SDT decided to include the one-hour threshold for reporting to be consistent with the FERC directive.

6RELIABILITY | ACCOUNTABILITY Project Event Reporting During the Comment Period that followed, there were many comments, very few supportive of the SDT’s proposals:  Given the number of rounds of comments that we have had, the incorporation of CIP-008 R1.3 has consistently noted in the negative votes.  A couple of commenters pointed out a potential conflict with R1.6 which could pose a second double jeopardy scenario.  Some still pointed out and believed there would be double jeopardy under R1.3.

7RELIABILITY | ACCOUNTABILITY Project Event Reporting  Some found that leaving the recognition in CIP-008 and reporting in EOP-004 would create confusion for the industry.  Some felt that the unresolved nature of the overall Cyber Security requirements would impact the EOP standard and would require future changes to the EOP standard as the CIP standards evolve.  Due to future CIP Applicability changes that remove certain types of Registered Entities, EOP would have to be modified to remove those entities as well.  There was a concern that EOP-004 reporting would be required for incidences at a nuclear generating facility when they are not required under CIP-008.

8RELIABILITY | ACCOUNTABILITY Project Event Reporting As a result of these comments, the Project SDT is proposing that CIP-008 R1.3 be left in the original form under CIP-008 and that all provisions that were previously incorporated be removed. While we believe that the industry would like to see a single reporting clearinghouse structure, we feel that it’s best to keep things as currently structured.

9RELIABILITY | ACCOUNTABILITY Project Event Reporting New Proposed R1: Each Responsible Entity shall have an event reporting Operating Plan that includes communication protocol(s) for applicable events listed in, and within the timeframes specified in EOP-004 Attachment 1 to the Electric Reliability Organization and other organizations based on the event type (e.g. the Regional Entity, company personnel, the Responsible Entity’s Reliability Coordinator, law enforcement, governmental or provincial agencies).

10RELIABILITY | ACCOUNTABILITY Project Event Reporting Expected intent by the SDT: Similar to today’s CIP-001, Registered Entities will have a plan, procedure, or process including contact list(s) for the notification associated with the types of events identified in Attachment 1 for the type of functional registrant they are. Entities, at their choosing, can have one list for all types or can have separate lists for the different types of events. The ERO must be on all contact lists. The organization knows to whom it has obligations to for reporting to the rest of the parties to be notified.

11RELIABILITY | ACCOUNTABILITY Project Event Reporting New Proposed R2: Each Responsible Entity shall implement its event reporting Operating Plan for applicable events listed in, and within the timeframes specified in, EOP-004 Attachment 1.

12RELIABILITY | ACCOUNTABILITY Project Event Reporting New Proposed R3: Each Responsible Entity shall validate all contact information contained in the Operating Plan per Requirement R1 each calendar year. Expected intent by the SDT: This requirement results from the FERC Directive in Order 693. The SDT has removed the language on drills, tests, and or exercises.

13RELIABILITY | ACCOUNTABILITY Project Event Reporting Event Type Entity with Reporting Responsibility Threshold for Reporting Damage or destruction of a Facility RC, BA, TOP Damage or destruction of a Facility within its Reliability Coordinator Area, Balancing Authority Area or Transmission Operator Area that results in the need for actions to avoid a BES Emergency. Damage or destruction of a Facility BA, TO, TOP, GO, GOP, DP Damage or destruction of its Facility that results from actual or suspected intentional human action. Physical threats to a Facility BA, TO, TOP, GO, GOP, DP Physical threat to its Facility excluding weather related threat, which has the potential to degrade the normal operation of the Facility. OR Suspicious device or activity at a Facility. Do not report copper theft unless it degrades normal operation of a Facility. Physical threats to a control center RC, BA, TOPPhysical threat to its control center, excluding weather related threat, which has the potential to degrade the normal operation of the control center. OR Suspicious device or activity at a control center.

14RELIABILITY | ACCOUNTABILITY Project Event Reporting Event Type Entity with Reporting Responsibility Threshold for Reporting BES Emergency requiring public appeal for load reduction Initiating entity is responsible for reporting Public appeal for load reduction event BES Emergency requiring system- wide voltage reduction Initiating entity is responsible for reporting System wide voltage reduction of 3% or more BES Emergency requiring manual firm load shedding Initiating entity is responsible for reporting Manual firm load shedding ≥ 100 MW BES Emergency resulting in automatic firm load shedding DP, TOP Automatic firm load shedding ≥ 100 MW (via automatic undervoltage or underfrequency load shedding schemes, or SPS/RAS) Voltage deviation on a Facility TOPObserved voltage deviation of ± 10% of nominal voltage sustained for ≥ 15 continuous minutes

15RELIABILITY | ACCOUNTABILITY Project Event Reporting Event Type Entity with Reporting Responsibility Threshold for Reporting IROL Violation (all Interconnections) or SOL Violation for Major WECC Transfer Paths (WECC only) RC Operate outside the IROL for time greater than IROL Tv (all Interconnections) or Operate outside the SOL for more than 30 minutes for Major WECC Transfer Paths (WECC only). Loss of firm loadBA, TOP, DP Loss of firm load for ≥ 15 Minutes: ≥ 300 MW for entities with previous year’s demand ≥ 3,000 MW OR ≥ 200 MW for all other entities System separation (islanding) RC, BA, TOPEach separation resulting in an island ≥ 100 MW Generation lossBA, GOPTotal generation loss, within one minute, of ≥ 2,000 MW for entities in the Eastern or Western Interconnection OR ≥ 1,000 MW for entities in the ERCOT or Quebec Interconnection

16RELIABILITY | ACCOUNTABILITY Event Type Entity with Reporting Responsibility Threshold for Reporting Complete loss of off- site power to a nuclear generating plant (grid supply) TO, TOP Complete loss of off-site power affecting a nuclear generating station per the Nuclear Plant Interface Requirement Transmission lossTOP Unexpected loss, contrary to design, of three or more BES Elements caused by a common disturbance (excluding successful automatic reclosing) Unplanned control center evacuation RC, BA, TOP Unplanned evacuation from BES control center facility for 30 continuous minutes or more. Complete loss of voice communication capability RC, BA, TOP Complete loss of voice communication capability affecting a BES control center for 30 continuous minutes or more Complete loss of monitoring capability RC, BA, TOPComplete loss of monitoring capability affecting a BES control center for 30 continuous minutes or more such that analysis capability (State Estimator, Contingency Analysis) is rendered inoperable. Project Event Reporting

17RELIABILITY | ACCOUNTABILITY Project Event Reporting Listed below are the proposed changes to Attachment 2: Reorganized the event lists to match order listed in Attachment 1. Removed “Other” Updated ERO contact information Other Changes: Removed timestamp language Adjusted VSL for R2 to change to days from hours Moved background to Guidance pages

18RELIABILITY | ACCOUNTABILITY Project Event Reporting Notes: SDT looking to finalize proposal on July 31 and Aug 1 Post 30-day comment and ballot in mid-August With approval, looking to go to BOT in November

19RELIABILITY | ACCOUNTABILITY Questions? Questions Thank You! From: Brian, Joe, Michell e, Jimmy, Steve, and Bob.