Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Configuration Management
Checking & Corrective Action
Keshav Sarin Manager, Compliance Risk Analysis
CIP Cyber Security – Security Management Controls
PER
PER Update & Compliance Lessons Learned
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
COM Operating Personnel Communications Protocols
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Compliance Application Notice Process Update and Discussion with NERC MRC.
ESOS COMPLIANCE PROCESS 26 FEBRUARY REGULATORY APPROACH.
1 Communications Protocols Issues Update System Operator Conference May 1-3, 2012 Columbia, SC Herb Schrayshuen, VP Standards and Training, NERC.
EMS Auditing Definitions
ISO 9001 Interpretation : Exclusions
Notice of Compliance Audit
Purpose of the Standards
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
FPSC Safety, LLC ISO AUDIT.
5.2 Personnel Use competent staff Supervise as necessary
Codex Guidelines for the Application of HACCP
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
CIP 43 ReliabilityFirst Audit Observations ReliabilityFirst CIP Webinar Thursday, September 30, 2010 Tony Purgar, Sr. Consultant - Compliance.
Basics of OHSAS Occupational Health & Safety Management System
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
INTRODUCTION TO AUDITING
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Assessing Compliance. 2 NERC Compliance Workshop 11/02/07 Documentation of Compliance with NERC Reliability Standards Jeff Whitmer.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Evaluation of Internal Control System
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
By: Texas RE Enforcement April 25, 2013 Guidance on Requirements for PRC-005 Mitigation Plans Talk with Texas RE April 25, 2013.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Standards Review Subcommittee Update August 17, 2010.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
ISO Registration Common Areas of Nonconformances.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
1 Auditing Your Fusion Center Privacy Policy. 22 Recommendations to the program resulting in improvements Updates to privacy documentation Informal discussions.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
Updated ERO Enterprise Guide for Internal Controls
COM Operating Personnel Communications Protocols
PRC Implementation Plan and Summary of Devices
Background (history, process to date) Status of CANs
Mandatory Reliability Standards
How to conduct Effective Stage-1 Audit
Presentation transcript:

Key Reliability Standard Spot Check Frank Vick Compliance Team Lead

2 KRSSC Program ●Key Reliability Standard Spot Check (KRSSC) was designed to improve consistency of compliance auditing. ●Eight Regional Entities involved. ●Captures a snapshot of the procedures and processes. ●Reliability Standards that have the potential for having a major impact on the Bulk Electric System (BES).  2010 = PRC  2011 = EOP Talk with Texas RE March 28, 2013

3 KRSSC SCOPE & Objectives ●NERC selected an audit from each region that included PRC-005.  Time span from October 2009 through May  Similar sized registered entities. ●This snapshot provided insight into the issues facing compliance auditors in auditing PRC  Identified issues regional audit teams experience when evaluating compliance with the selected Reliability Standard.  Identified areas in Regional Entity audit evaluations in which additional guidance may be needed to improve evaluation processes or to promote consistency in evaluations. Talk with Texas RE March 28, 2013

4 Methodology ●NERC selected an audit recently performed by each Regional Entity. ●Audit reports, Reliability Standards Audit Worksheet (RSAWs), and evidence files supplied by the Registered Entities were provided to NERC.  With the same information, could NERC come to the same conclusion as the audit team? ●Follow-up questions were asked and answered. ●Teleconferences were held with each Region. ●A report was generated.  Addressed areas needing improvement as the ERO and individually.  Enhanced consistency across all Regions. Talk with Texas RE March 28, 2013

5 KRSSC Program Results ●The outcome identified six main areas of inconsistencies in the compliance audit application across the Eight Regional Entities.  Evidence of testing when test dates prior to 6/18/2007 are required to be provided. Compliance Application Notice (CAN-008-PRC-005-1).  Selecting or expanding sample sets to include all device types.  Evidence of continuous monitoring of protection system elements. Could be a substitute if stated in the registered entity’s program. Require evidence of alarming and continuous monitoring by an operator that can initiate corrective actions. Talk with Texas RE March 28, 2013

6 KRSSC Program Results Cont’d  Accepting computerized summary files of test dates as evidence of testing. The audit sample is verified against actual test records to determine compliance.  When historical experience (good utility practice) is used as a basis for testing and maintenance intervals, entity must provide some historical records to support the basis.  Testing and maintenance plans with some flexibility for interval. The basis for any flexibility must be separately stated and evidence provided for the basis, or the flexibility has to be included in the basis presented for the maintenance and testing intervals. Talk with Texas RE March 28, 2013

7 Miscellaneous Issues ●Test records, whether performed by registered entity personnel or contractors are not uniform and are often difficult to interpret.  Provide a sample annotated test record for each type of test record provided, with an explanation of what the test indicated and a definition of each relevant heading. ●Verifying whether DC control circuitry and/or associated communications are being tested as a part of functional testing of relays continues to be an area that requires the registered entities to provide additional information.  Provide detailed relay diagrams, functional test procedures, etc. ●PRC R1.2 requires a “Summary of maintenance and testing procedures,”  Include a short, concise statement covering the important aspects of the maintenance and testing procedures, such as the system protection elements tested, elements continuously monitored, functional test performed, testing intervals and basis. Talk with Texas RE March 28, 2013

8 Conclusion ●Results were provided to each Regional Entity individually. ●Results were reviewed with Regional Entity at the ERO Auditor Workshop and reinforced NERC’s expectation in auditing practices going forward. ●KRSSC is a tool for assessing and identifying consistency issues in the application of standards across the Regional Entities. ●Allows NERC to provide guidance to the Regional Entities and registered entities to improve the compliance monitoring process. ●Allows NERC to further its goal of being a learning organization and maintaining transparency. Talk with Texas RE March 28, 2013

9 PRC R1 Expectations – Texas RE ●Provide a “Program” document (or documents) that fully describes what the Registered Entity does to ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested. ●The Program must include maintenance and testing intervals for each device/equipment type.  Protective relays.  Associated communication systems.  Voltage and current sensing devices.  Station batteries and battery chargers.  DC control circuitry. Talk with Texas RE March 28, 2013

10 PRC R1 Expectations – Texas RE Cont’d ●The Program must include/identify a basis for the maintenance and testing intervals for each device/equipment type.  Protective relays.  Associated communication systems.  Voltage and current sensing devices.  Station batteries and battery chargers.  DC control circuitry. ●NERC’s “Protection System Maintenance (A Technical Reference)” document, prepared by the System Protection and Controls Task Force (Sept. 13, 2007), could be used to provide a basis. Talk with Texas RE March 28, 2013

11 PRC R1 Expectations – Texas RE Cont’d ●The Program must include a summary of the maintenance and testing procedures by device/equipment type.  Protective relays.  Associated communication systems.  Voltage and current sensing devices.  Station batteries and battery chargers.  DC control circuitry. ●Include a detailed narrative describing the entity’s program and how the program is implemented with clear references to the Program document(s). Talk with Texas RE March 28, 2013

12 PRC R2 Expectations – Texas RE ●Include a detailed narrative describing how the entity implemented its Program with clear references to the Program document(s) and associated records. ●Provide a complete listing of all the equipment in the Entity’s Protection System by type (Excel). ●Equipment name, type, location, interval, last 2 test dates, next test date. ●Include all the equipment types (not just the relays).  Protective relays.  Associated communication systems.  Voltage and current sensing devices.  Station batteries and battery chargers.  DC control circuitry. Talk with Texas RE March 28, 2013

13 PRC R2 Expectations – Texas RE Cont’d ●Provide the actual maintenance and test records.  For smaller entities initial submission could include all the records.  For larger entities provide sample records of each type of inspection, maintenance or test record (for last 2 dates). ●For each type of test record, provide narrative describing what is being done with references in the record identified. ●If all records are not provided in the initial submission, Texas RE will provide a sampling list by equipment type that the Entity will be expected to provide detailed evidence in the form of inspection, maintenance and test records. Talk with Texas RE March 28, 2013

14 PRC R2 Expectations – Texas RE Cont’d ●The Entity will provide the inspection, maintenance and test records requested in the sampling list. ●Additional records may be requested during the audit. ●Note:  Relays may have different maintenance and test intervals based upon relay type and monitoring.  Batteries may have different intervals for: Inspection Test Maintenance Talk with Texas RE March 28, 2013

15 PRC Update ●This standard merges previous standards PRC-005-1, PRC-008-0, PRC-011-0, and PRC ●NERC has provided a companion document to PRC-005-2, PRC Protection — System Maintenance Supplementary Reference. ●PRC was adopted by the BOT on November 7, ●PRC has been filed with FERC. Talk with Texas RE March 28, 2013

Contact Information (512)