General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.

Slides:



Advertisements
Similar presentations
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Advertisements

RockOn! Canister Integration RockOn! 2009.
Honda 450 Installation Manual.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Handrail Assembly and Steel Stairs. Handrail Terminology u Guardrail –top most rail on balcony –higher than handrail u Vertical Rail –members between.
Engineering Overview Presenter’s Name
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Components for the low- maintenance switch Components for the low maintenance track Schwihag RBH system.
All ground where the feet of the N-Rack are to go must be levelled and concreted. This must be done in advance to allow the concrete to set. There are.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
TP4-ENERSOL-TD/PV double function
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
A conversion kit to use a dugout or simple boat as a training scull.
Plans for Pan-type Bed Shapers
Release 01/10/051 ASSEMBLY INSTRUCTIONS DUCOSUN F MULTIFIT.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
An Introduction to Pandrol’s PANGUARD System
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
Wood Construction CTC-375.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Structural Drafting Connection Details and Gages.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
Fundamentals of Structural Detailing
Moeller GmbH GB Leistungsschalter Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner July.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Sign Structures Updates: Helpful Tips for Inspectors
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
YOUR BEST CONNECTIONS All parties concerns and interests combined
30’ Wireless Mast – Self Install
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
IRFTS SHADOW SOLAR Garden
Bilge Pump Service Project Model Service Kit
CreaZen® Decorative Railing System
Escalator Installation
LCD Splicing Screens Wall-mounted Guide
Module 6 Antenna Assembly and Look up Angles
Wood structures Topic 3 Floor Framing
Assembly instructions for M-K all bolt together hoppercone kit.
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Mounting a BalanceBox®650 to a brick wall
BASEPLATES SLIDE SHOW.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Additional Upstream Coil Shielding
Civil engineering drawing
STANDING WATER FOOTBRIDGE
Replace Timing Belt 300 Hours.
Presentation transcript:

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base 20in. ~ 120in. (10’) · Structure Height (Back): 82in. + base 20in. ~ 102in. (8’-6”) · Structure is scalable and customizable to any project size Structures: 2 cars/unit – Single Car also available module sizes: 65in.x40in.x2in. or 65in.x40in.x2in. Module quantity/unit: 18pcs (6 lines x 3 rows) or 21pcs (7 lines x 3 rows) Structure material and finishing treatment: Steel / Hot Galvanized Package View 40’H container

Components Concrete Base Base Plate Main Support Bracket (ms) Main Support Beam Cross Beam (cb) Rail Beam (rb) Solar Panels Hardware M10 x 160mm with Nut and Washers – Cross Beam Assembly M20 x 140mm with Nut and Washers – Rail Beam Assembly M20 x 220mm with Nut and Washers – Main Support Assembly Concrete Anchors for Baseplate Assembly – If Applicable M8 x 20mm with Nut and Washers – Solar Panel Installation

Installation Steps (for Reference Only) Step 1 Set up Concrete Base According to Engineering Data (Footing Design Force & Reaction ID), Base Plate dimension, and site soil condition to make the Concrete Base. the Base Plate dimension: (45in.) x (15in.) x (0.73in.) the Concrete Base (min) is needed to be (52in.) x (22in.) with fc’ (force) = 4,500 PSI min the Concrete Base height is needed to be ≥20in. from the ground. there are 19 x.87in. holes Pre-fabricated on Base Plate, M20 anchor bolts embedded into Concrete Base are needed. There are two ways to make the concrete base. A. Precast base B. Pouring the foundation, anchor bolts embedded Make your choice to build the concrete base. Notes: Center distance between the two concrete bases is 204in., as shown below. · Adjust the horizontal width 204in. distance. · Must ensure that all bolts embedded in concrete bases are on the same horizontal straight line.

Step 2 After concrete base thoroughly solidified, to fix Carport Main Support (CMS) onto the concrete base. Install Carport Main Support (MS) Make sure all bolts embedded in concrete bases are on the same horizontal straight line, which will enable CMS on concrete bases are on the same horizontal straight line. Step 3 Connect Carport Main Support Beam (MSB) with Carport Main Support. Use Bolt (M20x220) to connect MSB and MS, but no need to tighten until MSB is adjusted well, and then tighten the fixing. Install Carport Main Support Beams Illustration of Bolt with Washers and Nut

Step 4 Connect Crossbeam with Carport Main Support Beam (MSB). Use Bolt 3 (M20x140) to fix. Notes: When putting Crossbeams, please pay attention to place direction. Adjust the Crossbeam to ensure that each vertical mounting holes in the same straight line. After adjustment, tighten all bolts. Install Cross Beams

Step 5 Before fixing 6 Rail Beams with 4 Crossbeams, make “Pre-mounted solar module units” (Solar modules to mount with Rail Beams) first. As shown below: a) Turn Solar modules onto the reverse side, three for one group Install Rail Beams (For Solar Modules) Bottom side UP Solar Side DOWN b) Place the Rail Beam, align the mounting holes (Rail Beam holes and Solar module mount holes)

Step 5 - continued c) Use Bolt (M8x20) with Lock Washer, Washers and Nuts, Qty of 4 sets to mount 1 Solar Module Assembled View

Step 6 Connect 6 Rail Beams (Pre-mounted solar module units) with 4 Crossbeams Use Bolt (M10x180) to Mount

Installation is now complete