City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Metro Muncipal Agreement Program
Stewardship Oversight Committee Project Delivery Design & Construction Performance Measures May 2012.
1 23 CFR Supervising agency (c) When a project is located on a street or highway over which the STD does not have legal jurisdiction, or when special.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
District 4 Local Assistance
District Agreement Process Temi Latinwo Federal Aid Agreement Technician.
Phases of Plan Development – Leading to High Quality Plans ACEC/ODOT Conference April 15, 2008 Steve Cooley, PE, PLS ODOT Region 2 Technical Center Manager.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Marcy Mealy Procurement Specialist CDBG Program
National Bridge Inspection Standards (NBIS)
David C. Larson CTEP Project Engineer Engineering Conference Missoula.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
Overview of the Federal Aid Process for Transportation Projects.
Consultant Services Flexibilities. Consultant Services Initiative: Highlight existing flexibilities for contracting and using consultants to: Assist STAs.
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
Right of Way Section Dee Jones State Right of Way Manager Richard Dunlap Operations Manager Joe Gray Region 5 Right of Way Manager
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
AASHTO Subcommittee on Construction Burlington, Vermont Tuesday, August 17 th, 2010 Tom Ravn.
MURK Presented By Awni Alsous, MURK Engineer 2010.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
ODOT’s Local Agency Certification Program The Basics Beth Vargas Duncan Certification Program Manager May 2006.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
1 ARKANSAS RECREATIONAL TRAILS PROGRAM August 10, 2012.
The Lifecycle of Grants: Grant Agreement and Fair Housing November 7, 2012.
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Complaints Information Santina Thibedeau March 5, 2009.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Certification Program UPDATE & LAG MANUAL Overview July 27, 2007.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Phil Pratt, PE Highway Engineer FHWA, Wyoming Division
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Lisa Fresquez Civil Rights Program Manager WYDOT.
City of Chicago Department of Procurement Services Welcome to the City of Chicago Department of Procurement Services Bid & Bond Room Rahm Emanuel, Mayor.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Certification Program Overview Beth Vargas Duncan Beth Vargas Duncan Certification Program Manager Certification Program Manager June 6, 2007.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
General Aviation Airports
Construction Oversight
FHWA Funding, Monitoring & Reporting
Compliance Surveys July 2016.
Understanding a Federal Audit
State Aid Construction
Civil Rights & Labor SiteManager
Designers’ Manual Overview and Chapter Contents
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Metro Muncipal Agreement Program
Quality Assurance for Emulsified Asphalt Surface Treatments
Environmental Commitments
State Aid Construction
Right of Way Certification
Presentation transcript:

City of Eugene Certification Project Case Study

Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control –Doesn’t have to be the “ODOT Way” –Could use City’s policies, procedures and processes after ODOT reviewed for compliance with ODOT/FHWA scheme.

Eugene Conditional Certification Design Consultant Selection Advertise, Bid & Award Construction Administration

Current Test Projects Roosevelt Blvd Pavement Preservation

Current Test Projects North Game Farm Rd

Current Test Projects Chad Drive Extension

Current Test Projects West Bank Trail

Getting Started

Design (PE) Phase Receive written authorization from ODOT to proceed with design. Continue environmental documentation outlined in the Part 3 of the Prospectus ODOT Reviews & Approvals of Design Final PS&E

ODOT Reviews Design Approval (60%) –LAG Manual Section C, Chapter 10 –Prospectus/Design Report Advanced PS&E (95%) –Verify environmental clearance –Right of Way Certification –Obtain civil rights requirements –Verify design exceptions & public interest findings

Design Standards Master Certification Agreement outlines the standards to be used. –Public Improvement Design Standards (PIDS) Manual –AASHTO –Oregon-APWA Specifications & Amendments –LAG Manual, Section C, Chapters 9, 10, 11

Design Exceptions Any deviations from City, AASHTO or other required standards must be documented and approved City Approval by City Engineer for City standard only or City funded only City & ODOT Approval for AASHTO standard on federally-funded project

Design Roosevelt Blvd Pavement Preservation

ADA Ramps

Consultant Selection Procedures: Use City’s Public Contracting Regulations LAG Manual Section C, Chapter 12 with Appendices

Consultant Selection From the LAG Manual, need to include: Civil Rights (Title VI) information about filing complaints regarding discrimination Lobbying Prohibition

Consultant Selection Example: Roosevelt Blvd Archeological Services (PA Memo)

Advertise, Bid & Award Non-Certified Agency projects are advertised by ODOT (or another local agency certified in advertising, bid and award). –LAG Manual Section B, Chapter 15 –ODOT’s Office of Project Letting –ODOT’s Project Delivery Guidebook

Advertise, Bid & Award Certified Agency projects are advertised by the local agency. –Use City procedures for advertising, bidding and contract award. (3 week minimum advertisement period) –Use ODOT Civil Rights Office to provide for DBE, EEO and OJT requirements. –Allow 6 weeks for authorization from FHWA to proceed with advertisement.

Pre-Advertisement Timelines Environmental Clearance (min. 3-4 weeks prior to advertisement) ODOT/FHWA Construction Authorization (allow 4-6 weeks prior to advertisement) ODOT PS&E Completeness Checklist

Advertise Bid & Award Roosevelt Blvd Pavement Preservation Received authorization July 24, Project began advertisement August 5, opened bids August 29. Issued one addendum to clarify a materials specification and a payment specification, and revise some bid quantities. The bid opening was postponed in order to issue the addendum.

Construction Non-Certified Agencies –LAG Manual Section B, Chapter 16 –ODOT holds the construction contract Local agency staff can assign a project manager to work under ODOT oversight Local agency may hire a consultant to be the project manager with ODOT oversight

Construction Certified Agencies –LAG Manual Section C, Chapter 16 –City holds the construction contract and is responsible for all aspects of contract administration and construction engineering.

Construction Eugene Certified Construction Contract Administration –Eugene Project Manager’s Manual –Eugene Inspection Manual –Eugene Field Tested Materials Acceptance Guide –Oregon Standard Specifications for Construction (with Eugene Amendments)

Changes ODOT approval is needed for changes affecting: Environmental mitigation, classification or commitments Scope of work State facilities DBE goals, requirements and/or aspirational targets Traffic mobility on the state system AASHTO requirements, such that the change is below the minimum AASHTO standards

Construction N Game Farm Road Jurisdictions of multiple agencies overlapping. Overlapping projects (ODOT & City of Eugene)

Construction N Game Farm Road Simplified documentation using City process. Daily Inspection Reports documenting daily quantities and quality of work.

Construction N Game Farm Road Reimbursed for contractor progress payments within 10 days. At least one documentation review by Region RAS during the work.

Certification “Pros and Cons” Have not found there to be any “cons” in certification. Immediate and significant benefits –Design –Consultant selection –Advertise, bid and award Realized benefits in all areas due to simplified documentation