Shift Move to ACR Shifts are taken solo since Aug. 1, 2010 – The shifter stays alone without anyone nearby from the late night though the.

Slides:



Advertisements
Similar presentations
Touchscreen Checkin, Usage and Setup. Checkin Demonstrate everything you can do with checkin at a kiosk Show how to set up Organizations for self-checkin.
Advertisements

Supporting The Mobile Client: Expanding Our Borders John Guidone Manager, Desktop Technologies and Dawn E. Colonese Manager, Help Desk & Client Access.
* Acas guidance on shared parental leave Susan Raftery
Enlighten V2.2 Manual – Admin Level Access Healthcare Training Section 1 Jayex Technology Limited Enlighten - Admin V2.2 Aug 2010 v1.0.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
U.S. Department of Agriculture eGovernment Program February 2004 eAuthentication Integration Status eGovernment Program.
Substitute FAQs SubFinder Overview. FAQs Do I have to have touch-tone service to use SubFinder? No, but you do need a telephone that can be switched from.
Informatics 43 – April 16, Homework 1 What is the purpose and goal of each section in the document? Two audiences: non-technical users and technical.
Make Life in Technology Easier! Presenter: Jacob Quade Ties Conference December 16, 2013.
1 RUP Workshop By George Merguerian Senior Partner Business Management Consultants
Technical Brief v1.0. Communication tools that broadcast visual content directly onto the screens of computers, using multiple channels and formats Easy.
1 Proctor Caching and TestNav Configuration. Role-Based Key 2 Role-Based Codes LEA Test Coordinator – School Test Coordinator – Test Administrator/Proctor.
1 Infrastructure Trial Running a Dress Rehearsal.
PubMed Search Options (Basic Course: Module 6). Table of Contents  History  Advanced Search  Accessing full text articles from HINARI/PubMed  Failure.
STEP-BY-STEP – THE PROGRAM PROCESS 1st Step: Sign up for a free information session by contacting our office at (503) or via the website at
Release & Deployment ITIL Version 3
Hardware Upgrade Project George Palios. Contents Outlines the activities undertaken to upgrade the hardware for the Revenues, Benefits and NNDR Systems.
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Clarity Educational Community Get the Results You Need When You Need Them Transitioning to CA PPM On Demand Presented by: Joshua.
Agenda Teams Responsibilities Timeline Homework and next steps.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Information Technology at Emory Information Technology Division Technical Services IT Briefing Agenda 3/18/04 March Action Items Kronos Update eVac Demonstration.
TEAM Basic TotalElectrostatic ManagementAwareness&
Step By Step Windows Server 2003 Installation Guide Step By Step Windows Server 2003 Installation Guide.
PC Maintenance: Preparing for A+ Certification Chapter 22: Setting Up a Windows Network.
Training. work smarter not harder 1 Getting Started 2 Helpful Hints 3Questions.
Existing Solution 1 Proactive – SLR 6 hour schedule activities for managed services Stop light report is posted and reviews any open tickets for.
Nagios Demonstration Tom Wlodek SLAC Tier2 workshop
1 Responsibilities & Planning DCS WS L.Jirdén.
Communications and Networking Testing Schedule Tim Krout.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
Our Company What your are Getting If your workstation or laptop has been giving you problems, we can fix it and restore your productivity without adding.
1 AARP Tax-Aide Prospective Volunteer Recruitment System Leadership Reports and VMIS Functionality 11/4/09.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
MG, YWB and CS 1 Alice Shift model for 2009 Shift model for the global subsytems (HLT,DCS,ECS,CTP,Offline) Shift model for the detector subsytems : MTR+MCH.
Status of the new NA60 “cluster” Objectives, implementation and utilization NA60 weekly meetings Pedro Martins 03/03/2005.
Project management Topic 8 Quality Review. Overview of processes Prepare for Quality Review Questions list Meeting Agenda Review Meeting Sign-off Product.
IBM Maintenance and Technical Support © Copyright IBM Corporation 2007Phil Giddings Feb-09 MAPS Tool ( Maintenance At Product Sale) Education Presentation.
IOAP Setup and Maintenance of Assessment Laptop. Introduction In order to have smooth functioning of laptops during ion assessments, a few setup activities.
Wyoming Technology Readiness February Agenda Wyoming Training - Feb Technology Readiness  Schedule of events  Components and System Requirements.
SMOOTHWALL FIREWALL By Nitheish Kumarr. INTRODUCTION  Smooth wall Express is a Linux based firewall produced by the Smooth wall Open Source Project Team.
Standard Demo 1 © Hacking Team All Rights Reserved.
Many of us feel that once we bought a vps hosting service from a reputed company then everything is completed and we are ready to go live with our website,
Software and Systems Integration
Web-based MAP Help-Desk Training From the Technical Consulting Group
Online Software Status
Texas Instruments Supplier Portal- Web Invoice Overview
Technical expert studying and writing helpful articles on antivirus and other security products.
Step by Step Guide for QuickBooks Enterprise Installation QuickBooks Enterprise is a robust accounting software which makes handling business easier for.
OMNIXX to OPENFOX CONVERSION LESSONS LEARNED
Maryland’s Online IFSP Database
Informatics 43 – April 14, 2016.
UK Link Technology Refresh
Shared Salaries Department Tools for a Successful Budget Experience
Orange ASP Training Module
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Preparing for Campus Testing
Preparing for Campus Testing
[DISCLAIMER] This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation.
EST102: 25/10/11: Project Services Website rationalised.
Faculty Center for Roster Contacts
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Faculty Center for Roster Contacts
Implementation and Migrating to iModules
Chapter 2: Building a System
Building a “System” Moving from writing a program to building a system. What’s the difference?! Complexity, size, complexity, size complexity Breadth.
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

Shift Move to ACR Shifts are taken solo since Aug. 1, 2010 – The shifter stays alone without anyone nearby from the late night though the early morning (night shifts fully alone!!) – Safety of the shifters become concerns, let alone boredom Computing management and the run coordination reached to an agreement to move all shifts to ACR – Excellent timing since shifts were shutdown through Jan. 31, 2011 – Leaves plenty of time to prepare for the shifts Had discussions with run coordinators and the ACR sysadmins to learn issues and options

Shift Move to ACR – The Basics Shift desk: – Each of ACR shift desks currently have four 17” monitors – The run coordinators will make a decision on which desk to be used for shifts in early Jan. Access to ACR: – All shifters, AMODs and Computing management personnel need to be trained to obtain access clearance to ACR – Olga tells us Level 4A training is needed We will confirm this after the shutdown and notify all personnel

Shift Move to ACR – Shift Computer Macs are not allowed as ACR All ACR machines are rack mounted PC with SL5 Need to verify that all shift apps work on SL5 Monitors will also be the standard 17” ones  Some technical issues to be resolved with the optimal T0 Conzole display

Shift Move to ACR - Network Two possible solutions – Custom: The SL5 PCs for will be directly on CERN network outside P1 firewall Unpreferred solution by the sysadmin and run coordinators – Makes the hot spare switch-over difficult Setup and access to all current and future shift URLs much easier  We control the list of URLs via simple bookmarks – Standard ACR inside the P1 firewall We need to provide all URL’s down to the glory details for sysadmins to add into the proxy database First list of URLs and the name of the shift machine provided to Sergio – Ale will continue technical discussions further early Jan. to finalize this issue

Shift Move to ACR - Schedule Once the desk is finalized and the network issue is agreed upon We will setup the SL5 machine for shift in Jan. Notify all shifters, AMODs and other computing personnel for training requirements shifters will check out the configurations for two weeks starting on Feb. 1, 2011, in ACR Complete the migration into ACR by Feb. 14