Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.

Slides:



Advertisements
Similar presentations
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Advertisements

KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Linac 4 SPL tunnel Material access and services shaft Personnel and material access shaft Klystron gallery Emergency exit shaft Transfert line to PS2 Personnel.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review
LINAC4 ADVISORY COMMITTEE
BA6 – crab cavity activities in EYETS
Installation of an Instrument on a CERN machine
Injector De-cabling Project
Buffer Zones - Status Report
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
EN-HE SPS works during EYETS
Integration issues at IHEP
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
WPs concerned by L4 connection:
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Coldex disinstallation
HIE-ISOLDE contribution packages
SLHC-PP kick-off meeting, CERN 9 April 2008
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Modified at -
ABP/RTL Main RTL Activities for 2007/8:-
LINAC 3 Meeting ICL machines Injectors
HL-LHC - WP15 modifications Coffrets Prise C4L8
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14

L4 PSB injection modification as currently planned Removal L2 equipment (and modify). Removal obsolete cabling. Installation L4 equipment. Installation L4 cabling. Minimum intervention time -> 3 Months.

De-commission L2 equipment. (radioactive) Storage of L2 equipment. If possible leave L2 cabling in place. Removal obsolete cabling. Installation L4 equipment. Installation L4 cabling. Additional intervention time -> 2 Months. L4 to L2 Conversion time -> 5 Months. Keeping Linac2 as a backup by de-commissioning

Additional installation space for L4 equipment. De-commission L2 equipment in tunnel. If possible leave L2 cabling in place. Removal obsolete cabling. Installation L4 equipment. Installation L4 cabling. Additional intervention time -> 1 Months. L4 to L2 Conversion time -> 4 Months. Keeping Linac2 as a backup & leave L2 equipment in place (BA361)

Space management, Integration (BA361). Campaign to remove already obsolete cabling, equipment in coming shutdown. Additional budget required for vacuum chambers (current plan is to modify existing pipes for L4). Investigate if KSW position for L4 is compatible with L2 operation. General Issues