P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
Carbon Injector for FFAG
ESS DTL beam commissioning
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
ADAM meeting Geneve, SCDTL study for ERHA C. Ronsivalle, L. Picardi.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
RF source, volume and caesiated extraction simulations (e-dump)
Developments of the FETS Ion Source Scott Lawrie.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
On behalf of the whole MedAustron Therapy Accelerator Division
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Career Overview P. A. Posocco, CERN BE / ABP – HSL.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS Front End diagnostic
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Linac4 status and perspectives
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
A. Martynov on behalf of accelerator division.
Linac4 Beam Characteristics
Progress in the Multi-Ion Injector Linac Design
Injector Cyclotron for a Medical FFAG
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Physics design on Injector-1 RFQ
LINAC 4 source & LEBT measurement results
Beam dynamics of RAON accelerator system
1- Short pulse neutron source
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
LINAC4 commissioning plans etc.
Capture and Transmission of polarized positrons from a Compton Scheme
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
commissioning and measurements
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
MEBT1&2 design study for C-ADS
Physics Design on Injector I
(Beam) Commissioning Plan
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On behalf of the CNAO-GSI-INFN collaboration

P. A. Posocco – TH10 2 Welcome to CNAO (Centro Nazionale Adroterapia Oncologica) The CNAO has been conceived to perform treatment of deep seated tumours with light ion beams (proton, Carbon ions and others) and to clinical and radiobiological

P. A. Posocco – TH10 3 CNAO from outside Technical building Main building: 2° floor: auditorium & library 1° floor: offices and laboratories Ground floor: Reception and med. preparation Basement: 3 treatment rooms Accelerator vault

P. A. Posocco – TH10 4 The CNAO facility - 2 w. horizontal beam - 1 w. hor. + vert. beam - scanning mag. (20x20 cm) - ~3000 patients/year - 80% C, 20% protons - Compact design - 25 m diameter ring - Multi turn injection - Final energy: Carbon: 2400 MeV Protons: 250 MeV The acceleratorThe 3 treatment rooms

P. A. Posocco – TH10 55 CNAO Injector: Sources Specifications Extraction Voltage24 kV Current H 3 + > 700 μA Current C 4+ > 150 μA Transv. norm emitt. (95%)0.5 mm mrad LINAC Specifications Operating frequency MHz Final beam energy7 MeV/u Beam pulse length≤ 300 μs Beam rep. rate≤ 5 Hz Transv. norm emitt. (95%)0.8 mm mrad Exit energy spread± 0.3% Total injector length~ 19 m Sources C 4+ and H MeV/u 400 keV/u 8 keV/u IH - DTL RFQ Stripping foil Solenoid Spectrometer Switching magnet ChopperIon source supervised by INFN LNS Low energy beam transport by CNAO Linac by GSI (second version of HICAT) supervised by INFN LNL

P. A. Posocco – TH10 6 The Injector as it was in January 2009 Source I Source II RFQ 75° dipole Spectrometer Switching magnet Chopper Solenoid

P. A. Posocco – TH10 77 Injector commissioning milestones fromto SectionDescription May 08July 08Source Beam and LEBT Inst. September 08December 08 LEBT TB0 Beam January 09February 09 RFQ TB2 Install. 25 th Feb th Mar. 09RF Cond. 13 th Mar. 093 rd April 09Beam April 09May 09 IH DTL TB3 Install. June 09nowRF Cond. IH DTL RFQ LEBT Sources

P. A. Posocco – TH10 8 Ion Sources Performances Improvements (in 2007) the gas injection system has been modified in order to improve the stability extraction gap distance modified to improve beam emittance and stability a lead shield 10 mm thick all around the source instead of a 5 mm one for improving radiation safety the noise of electronics has been reduced Performances 250 μA for C 4+ (25% > nominal) 1100 μA for H 3 + (50% > nominal)  plasma electrode hole diameter reduced to 6 mm allowing to have better emittance New extraction column

P. A. Posocco – TH10 99 LEBT Commissioning TB0 HorizontalVertical C 4+ Emitt. RMS: ~35 mm mrad

P. A. Posocco – TH10 10 Commissioning of LEBT TB0 (GSI & CNAO) CNAO Faraday cup Farady Cup ACT (in front of solenoid) Slit-scanner Emittance chamber (length = 390 mm!) GSI End Cup

P. A. Posocco – TH10 11 Emittance in TB0 TB0: AC/DC current AC/DC profiles DC emittance exactly at the RFQ matching point!!! H3+H3+ C 4+ > 90% inside 180 mm mrad (yellow ellipse)

P. A. Posocco – TH10 12 Sol-002 The 3 solenoids build by SigmaPhi: magnetic field along the axis measurements at INFN Frascati 12 Matching solenoid Example of beam steering at TB0 grid as function of the solenoid strength Results: Very accurate centroid displacement correction (~1 mm over 3 cm wide beam!!!) Linear response Nominal value S. Vitulli & G. Bazzano (CNAO)

P. A. Posocco – TH10 13 LEBT Commissioning summary TB0 Comparison current measurements (GSI/CNAO & DC/AC) –Consistency Comparison of profiles (grid/scanner) –Consistency Beam position as function of solenoid field –Steering at RFQ entrance Profiles for long and short macro pulses at –Neutralisation, Space Different times within pulse (H 3 + /C 4+ ) –Charge, verification of DC emittances Transmission, Twiss-Parameter and emittances –Matching RFQ –Definition of LEBT operating parameters –Pre-condition for RFQ commissioning Mandatory for RFQ good performances!!!

P. A. Posocco – TH10 14 Commissioning of RFQ TB2 (GSI) Faraday Cup Profile grid (from right) End Cup MobEmi Slits and profile grid Phase probes ACT Beam

P. A. Posocco – TH10 15 Intertank section with MEBT partly integrated in the RFQ: compact but reduced flexibility IH-DTL RFQ Quadrupole magnets Steerer magnets Phase probe 205 mm Buncher gaps Beam

P. A. Posocco – TH10 16 Commissioning RFQ – Results H 3 + at 8 keV/u transmission, steering and energy Transmission ~57 % at working point 5.1 Volt (195 kW) Moderate steering in both planes with smooth behaviour Steerer LN-002-ITM off QD1= m -1 / QD2= 8.6 m -1 Step 1: Optimisation Step 2: Perform standard measurements

P. A. Posocco – TH10 17 Commissioning RFQ – Results H 3 + at 8 keV/u Emittances in TB2 4 rms [mm mrad]

P. A. Posocco – TH10 18 Commissioning RFQ – Results C 4+ Transmission, energy und steering Step 1: Optimization Step 2: Perform standard measurements Transmission ~62 % at working point 5.1 Volt (195 kW) Moderate steering in both planes with smooth behaviour

P. A. Posocco – TH10 19 Commissioning RFQ – Results C 4+ Emittances in TB2 4 rms [mm mrad]

P. A. Posocco – TH10 20 Probe beam (H 3 + ) Slits combined to reduce up to 10% of the full emittance!!! HorizontalVertical profile in L2 (~10 mm width) H3+H3+ Emit. RMS: ~5 π mm mrad M. Pullia (CNAO)

P. A. Posocco – TH10 21 Transmission ~70 % at working point 5.1 Volt (195 kW) Moderate steering in both planes with smooth behaviour Steerer LN-002-ITM aus QD1= / QD2= 8.6 RFQ: Results H 3 + “probe beam” at 8 keV/u Steering, energy and transmission

P. A. Posocco – TH10 22 RFQ commissioning results IonH3+H3+ C 4+ Energy (keV/u) Working point (V) Max. transm. full beam 4.6%58%59%62% Max. transm. probe beam 3.4%71%69%- x rms emit. (4 rms [mm mrad]) y rms emit. (4 rms [mm mrad])

P. A. Posocco – TH10 23 Effect of the bend electrodes on RFQ acc. (total) Full beam cm HIT CNAO By S. Yaramyshev Probe beam Measured at CNAO ~15%

P. A. Posocco – TH10 24 x c = -1.4 mm x’ c = 3 mrad y c = -0.1 mm y’ c = -10 mrad ± 15 mrad!! By S. Yaramyshev Probe beam displaced in position and angle with L2 steerers Exp. RFQ acceptance at 8 keV/u M. Pullia (CNAO) et al.

P. A. Posocco – TH10 25 Commissioning RFQ Summary results Working point: –Energy of 400 keV/u reached at 195 kW power Steering RFQ and quadrupole doublet: –Size acceptable and smooth behavior –during operation only small correction with steerers –very small beam losses in inter-tank section! Currents: –~500 µA (H 3 + ) –~75 µA (C 4+ ) –transmissions up to 60 % Transverse emittances: –H 3 + : Hor - Ver(90%) = 19 / 14 π mm mrad –C 4+ : Hor - Ver(90%) = 18 / 12 π mm mrad –within acceptance of IH-DTL (~50 mm mrad) RFQ operating parameters: –Established for H 3 + and C 4+ beams

P. A. Posocco – TH10 26 Commissioning RFQ Summary of further measurements Variation of LEBT energy: Measurements with 7.5, 8.0 and 8.5 keV/u –At 7.5 keV/u no useful results –At 8.5 keV/u results are similar to 8.0 keV/u case but at higher RFQ power level Stability of energy over 1.5 h: –variation in 2 keV/u region Measurement (Hor. and Vert.) of RFQ acceptance at 8.0 and 8.5 keV/u: –both measurements consistent Optimization of LEBT settings with respect to centers of measured acceptance –higher transmission –reduced steering and emittance after RFQ WHY ONLY 70% TRASMISSION AT MAX, with pencil beam ? –Probably longitudinal losses, the RFQ is not able to capture and accelerate more than 70% of particles even for on axis particles!

P. A. Posocco – TH10 27 Now: IH – DTL! TB3 (GSI)

P. A. Posocco – TH10 28 Thanks to all the authors A. Pisent, P. A. Posocco, C. Roncolato, INFN/LNL, Legnaro (PD), Italy C. Biscari, INFN/LNF, Frascati (RM), Italy G. Ciavola, S. Gammino, INFN/LNS, Catania, Italy G. Clemente, K. M. Kleffner, M. Maier, A. Reiter, B. Schlitt, H. Vormann, GSI, Germany G. Balbinot, E. Bressi, M. Caldara, A. Parravicini, M. Pullia, C. Sanelli, E. Vacchieri, S. Vitulli, CNAO Foundation, Pavia, Italy