M:+44 (0) 7717 696053 E:cb@chrisblythe.co.uk UPGRADING SAGE LINE 500/1000 CHRIS BLYTHE FCA M:+44 (0) 7717 696053 E:cb@chrisblythe.co.uk.

Slides:



Advertisements
Similar presentations
Resolving Common halFILE Issues. Effective July 11, 2006, Windows 98, Windows 98 Second Edition, and Windows Me (and their related components) will transition.
Advertisements

1 of 27 DA1241 Archive Companies Last updated: March-2004 DA1241 Archive Companies.
GP2013 (R2) New features in GP2013 (R2). New Ribbon for windows Edit List is the Print button on the right without the paper background Action pane can.
1 of : Multi-Currency Payments / DA0813 Last updated: Project Walkthrough: Multi-Currency Payments Multi-Currency Payments.
1 of 39 DA1245 Enhanced Transaction Tracking Last updated: March-2009 DA1245 Enhanced Transaction Tracking.
 This presentation is designed to provide you information about Journal Entries  You can advance to the next screen at any time by hitting the forward.
Microsoft Dynamics AX Technical Conference 2013
Cms 2 YE Closing+ tm Preparation & Closing Job Cost.
1 of 22 Consolidated Requisitions / DA0682-w1 Last updated: Consolidated Requisitions.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
Denise Luther Senior IT Consultant Practical Technology Enablement with Enterprise Integrator.
DBMaintPlus August 23, DBMaintPlus SQL Database Maintenance Utility for RB-ERP Version V9.3 and above Disclaimer The DBMaintPlus Utility is designed.
….financial management software for New York State municipal governments and non- profit organizations…. Click mouse to advance to next slide Enhanced.
What to do for a Financial year end And When to do it.
I-Suite An Automated Incident Business Information and Support Tool WILDLAND FIRE HURRICANES ALL RISK ASSIGNMENTS Full Versions of these Training Materials.
Installation Overview Lab#2 1Hanin Abdulrahman. Installing Ubuntu Linux is the process of copying operating system files from a CD, DVD, or USB flash.
Discovering Computers Fundamentals Fifth Edition Chapter 9 Database Management.
 Most current version 1.3  Will review some basic and advanced portions of the software  Only have 50 minutes including questions  Please write down.
KNOW YOUR BUSINESS CHRIS BLYTHE FCA. IF YOU HAVE ONE OF THESE PLEASE TURN IT OFF!
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Customer Review.
Slide#: 1© GPS Financial Services Revised 01/24/2009 Cougar Mountain Software Professional Version Cms 2 YE Closing+ tm Preparation & Closing.
Introduction to Softpay CP 105 Tier 1 Training Education and Support Technical Series : Tier 1 Core Software Technical Developer: Christopher Wallis –
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
1 The System life cycle 16 The system life cycle is a series of stages that are worked through during the development of a new information system. A lot.
Sequential Processing to Update a File Please use speaker notes for additional information!
Log Shipping, Mirroring, Replication and Clustering Which should I use? That depends on a few questions we must ask the user. We will go over these questions.
Chapter 1 Page ref. Chapter 1 Company File Setup and Maintenance 1.
Amy Walsh Senior Consultant November 11, 2014 Year End Close.
Company File Setup and Maintenance Chapter 6. PAGE REF #CHAPTER 6: Company File Setup and Maintenance SLIDE # 2 2 Objectives Use the EasyStep Interview.
NextGen Trustee GL/Accounting This class will cover NextGen Financial Management for Trustee Offices. We will look at GL accounts, Transactions, Bank Reconciliation,
Company File Setup and Maintenance Chapter 6. PAGE REF #CHAPTER 6: Company Setup SLIDE # 2 2 Objectives Use the EasyStep Interview to setup your company.
Local Government Corporation Resource 2016 NextGen Trustee Year End.
Procurement of Batch-Managed Stock Materials. ©2016 SAP SE or an SAP affiliate company. All rights reserved.2 Process Flow Diagram Procurement of Batch-Managed.
Dynamics GP – You Own It … Why Not Use It? Financial November 8, 2016
How to convert a Demo to Multi-user
BA Yearend Procedure.
Introduction of Week 3 Assignment Discussion
NextGen Trustee General Ledger Accounting
Purge-it! USP's, pre-sales process & helping the customer to decide
C/S Windows Overview Nigel Pilsbury.
Product Training Customer Review
Troubleshooting GP and MoversSuite
Closing the Month in SAGE 300 CRE
Presentation transcript:

M:+44 (0) 7717 696053 E:cb@chrisblythe.co.uk UPGRADING SAGE LINE 500/1000 CHRIS BLYTHE FCA M:+44 (0) 7717 696053 E:cb@chrisblythe.co.uk

IF YOU HAVE ONE OF THESE PLEASE TURN IT OFF!

Copyright & Disclaimer © Copyright 2010 Chris Blythe Limited. All product and service names mentioned are recognized as the trademarks of their respective companies. These materials are provided by Chris Blythe Limited for informational purposes only, without representation or warranty of any kind, and Chris Blythe Limited shall not be liable for errors or omissions with respect to these materials.

UPGRADING v MIGRATING

UPGRADE = ON THE SAME SERVER MIGRATE = ON A DIFFERENT SERVER (BUT YOU COULD GO VIA AN INTERMEDIATE SERVER BACK TO THE ORIGINAL BOX)

MOST PEOPLE ARE ON A VM NOWADAYS SERVER CAPACITY IS NO LONGER A DECISION MAKER

UPGRADE ORDER 1. OPERATING SYSTEM 2. DATABASE PLATFORM 3. APPLICATION

UPGRADE POSSIBILITIES

SAGE 1000 V 3.0 UPGRADE YOUR SAGE APPLICATION LINE 500 VERSION 7.1 ENT 2.1 L500 V5.0 L2/500 V5.5 L500 V6.0 ANYTHING OLDER UPGRADE YOUR DATABASE PLATFORM SQL SERVER 2005 SQL SERVER 2008 SQL SERVER 2000/7.0 UPGRADE YOUR OPERATING SYSTEM WINDOWS 2003 WINDOWS 2008 WINDOWS SERVER 2000

THE OLDER YOUR PRODUCT, THE MORE EFFORT IS LIKELY TO BE REQUIRED

PRACTICALITIES – UPGRADE FROM 5.5/6.0 Bespoke C-BASE programs TESTING Archive Tables Payroll – MUST be on current version Database Triggers & non C-BASE bespoke BEWARE POSSIBLE CHANGES TO INCIDENCE OF LOCKING

PRACTICALITIES – ADDITIONAL FOR UPGRADE FROM 5.0 Disaster Recovery plans Users/passwords cleanup? Printers/Papers cleanup? Security Groups replace multiple menu systems TESTING XML licence Manual re-entering of stocktake card header data

SECURITY GROUPS Required for DA0355 “User Access Permission views” – Sarbox requirement Created when moving from 5.0/2.1 or older Standard migration does one per user (!), DA0355 report goes off into orbit Reorganise into logical user groups after migration and delete excess groups

PRACTICALITIES – ADDITIONAL FOR UPGRADE FROM PRE 5.0 TESTING Processing cycles Report writer reports RWL (aka RSL) (Report Writer Language) reports Forms – Print Menus Messages Screen forms Working Directory/Database Naming RW Transfer files - Data dictionary RW Transfer files – Data “Union” (WIP/routing) files migration to database

PRINT FORMS Manual migration One module/formset at a time Consider re-editing instead of migration?

MENUS/MESSAGES Manual migration One module/formset at a time Consider re-editing instead of migration, bearing in mind effect of security groups?

SCREEN FORMS Manual migration One module/formset at a time Consider re-editing instead of migration? Why? – Because old forms may not support new functionality Old screen edits may have outlived their time!

BESPOKE C-BASE WORK – UNDERLYING SYSTEMS CODE Changed from Btrieve to Btrieve-removed systems And again in Line 500 V5.0 And again in Line 500 V5.5 And again in Line 500 V6.0 Not in Line 500 V7.0, but Application code will require recompilation anyway!!!! Recompilation under new source code is the minimum required, so check the cost/timescales with your reseller/developer BEFORE upgrading!

Processing cycles All batches should be posted All modules should be at period end THIS IS TO REDUCE THE AMOUNT OF TESTING REQUIRED AND THEREFORE KEEP THE COST DOWN This is not mandatory for V5.0+ upgrades but is very sensible!

FUNCTIONALITY CHANGES MOSTLY SWITCHED ON BY ENABLING A “PROJECT” BUT SOME (USUALLY MINOR) CHANGES ARE INTRODUCED ANYWAY N.B. REDUNDANCY OF SOME SWITCHABLE PROJECTS IN LATER RELEASES E.G. DA0219 “100% BACKWARD COMPATABILITY” POLICY (USUALLY!)

TESTING - ADVICE How much is your reseller ACTUALLY going to do? Demand to see DOCUMENTED test programme BEFORE agreeing deal! Work out which gaps YOU are going to have to test Demand to see SIGNED UP & DOCUMENTED RESULTS after migration GET INVOLVED YOURSELF OR USE AN INDEPENDENT CONSULTANT!

TESTING - ADVICE Check Archives have been migrated properly (or at all!) Check spool queue items have been migrated

TESTING – EXAMPLES Row counts of major tables (order lines, gl transactions etc) Reprint invoices, statements etc and check layout Run major reports (Trial Balance, Aged Debtors, FA YTD additions audit trail etc) before and after, check totals/transaction numbers agree Check every menu option launches without error message/popup Data item processing (“Destructive testing”) on copy system

OTHER ISSUES Changed projects/system key settings – do this AFTER testing where possible Copying old data to “spare” companies BACKING UP!!!!! Do a Trial migration – particularly if you have any bespoke/externally connected systems/triggers etc MAKE SURE IT IS PATCHED UP TO DATE! (get list of program versions)

WHO SHOULD PERFORM THE UPGRADE? RESELLER Wants your money INDEPENDENT CONSULTANT See above! END USER Wants to keep the money A COMBINATION OF THE ABOVE MAY BE THE BEST SOLUTION!

RESELLER UPGRADES NORMALLY DONE BY A “TECCHIE”, NOT A “CONSULTANT” FUNCTIONALITY CHANGES NORMALLY DONE BY CONSULTANT SHOULD WORK WITH AN INDEPENDENT CONSULTANT MAY MAKE THAT ROUTE “DIFFICULT” HAS A VESTED INTEREST IN DOING IT AS FAST AS POSSIBLE

INDEPENDENT CONSULTANT WILL BE A SAGE CONSULTANT BY CHOICE WILL HAVE IN DEPTH SAGE KNOWLEDGE, ALTHOUGH NOT NECESSARILY BREADTH LIKELY TO HAVE BEEN THROUGH UPGRADES BEFORE HAS THE “BIG PICTURE” SHOULD WORK WITH THE RESELLER

INDEPENDENT CONSULTANT MAY HAVE A MUCH BETTER UNDERSTANDING OF YOUR SYSTEM THAN THE RESELLER HAS A VESTED INTEREST IN MAKING IT GO SMOOTHLY AND WORK FIRST TIME WOULD BE IDEALLY SUITED AS YOUR PROJECT MANAGER

END USER May be capable of some or all of the work May not have the time or inclination to do it! SHOULD get involved with testing!

ADVICE PLAN WELL IN ADVANCE Ask your reseller for a breakdown of the time quoted Check they are doing adequate testing Check the backup/DR arrangements are adequate ALLOW ENOUGH OF YOUR OWN TIME FOR TESTING Plan for changes to user visibility e.g. Paper/printers/menus/screens DOCUMENT CHANGES AND TRAIN USERS! Consider completing Upgrade and running for a period before introducing new functionality

UPGRADING SAGE LINE 500/1000 CHRIS BLYTHE FCA