CIC Scope of Services Frances Paterson & Tony Broomhead.

Slides:



Advertisements
Similar presentations
University of Glasgow Major Capital Projects Project Governance Gateway Process.
Advertisements

Managing the Health and Safety of Contractors
Hussey Fraser Solicitors
The view of a CIBSE President. Rob Manning. SalesBriefing Concept Design Production Design Drawing and Manufacture Construction Commissioning and Handover.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Global Congress Global Leadership Vision for Project Management.
Preparing for Part 3 (Examination in Professional Practice and
RIBA Plan of Work 2013.
Unilever IT Career Framework Daryl Beck IT Excellence Thursday 6 th December 2007.
Need to Invest Investment Objectives and Case for Change Determine Potential Value for Money Strategic Case: Economic Case: Financial Case: Affordability.
BIM Management – A Strategic Approach
BIM Sarah Birchall and Jo Harris 25 th September 2014.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Risk Methods CSEM04: Risk and Opportunities of Systems Change in Organisations Dr Lynne Humphries.
Development and Quality Plans
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Supporting and investing in Camden’s voluntary and community sector (VCS) Proposed investment and support programme.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Strategic Forum for Construction Integration Task Group PROFITING FROM INTEGRATION.
Project Charter – Softball NSW Team Cathy Kerr – General Manager Andrew Dodshon – President Andrew Hamilton – Consultant Steering Committee Frances Crampton.
Oxfordshire Clinical Commissioning Group Contracting to support integration for mental health and older people Oxfordshire CCG’s approach to contracting.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
Developing an IS/IT Strategy
Manage Project Procurement Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG509A.
Commercial Opportunities
Construction Work Packaging
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Project Life Cycle.
Northwest ASSIST How to obtain maximum value from consultants 3 rd April 2008 Nadine Fry Julian Todd.
GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Job Creation, Skills Development and Empowerment in Road Construction Rehabilitation and Maintenance.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
What is Commissioning? John Dawson Commissioning and Procurement Adviser NAVCA.
Preliminary Project Descriptions/Outline Specifications
Identifying and recruiting patients for clinical trials in the future: a pharma perspective Rob Thwaites EC/EFPIA Workshop on ” Primary and secondary use.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
Project Procurement Management
Project management Topic 1 Project management principles.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Management Information System
Horizon 2020 – 2016 Transport Call
Introduction to Project Management Darren Trofimczuk.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Sustainable Direction Ltd PM – The STH Way sustainable direction ltd. 6 Twigworth Court Business Centre Twigworth, Gloucester GL2 9PG UK T +44 (0) 1452.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
CDM Construction Design and Management
Extra Care Housing The Next Generation 16 September 2015.
Community Infrastructure Levy Project Planning and Infrastructure Evidence July 2014.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Construction Work Packaging
Project Cycle Management
Systems Analysis and Design in a Changing World, 4th Edition
Route 2: Strategy Document Template (Powerpoint format)
Manage Project Costs Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
KEYNOTE STAGE SPONSOR.
COST PLANNING AND ESTIMATION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Presentation Title: View > Header & Footer
Introduction DEFINATION :-
Project delivery RIBA stages Define design deliver Key Objectives 1 2
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
Effective Construction Safety Management
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

CIC Scope of Services Frances Paterson & Tony Broomhead

Why? mismatch between scopes for different disciplines lack of definition /clarity of roles / gaps emphasis on the conditions (the ‘legal bits’) rather than the services (what’s to be done) Industry standard contracts but no scopes

Definition

Roles Look at roles (not disciplines) Participants: – consultants – specialists – contractor etc SoS can be used whatever the procurement route or contractual responsibilities

Tasks tasks that are, or may be, required on all projects tables / CIC stages choose tasks appropriate for project allocate them to appropriate participants to produce contract documents

Definition is BIM BIM is Definition from inception to use Definition + Construction = Project DefinitionConstruction Consultants Contractor. Definition is the same Roles are the same

Clear roles which can be allocated Well defined stages for refinement of definition Defined management framework –Management procedures (BIM protocol) –Risk –Value project specific SoS framework

1 Preparation Project objectives, business need, Client priorities, aspirations Strategic Brief: function, use, scale, location, quality, cost, value, time, safety, health, environment, sustainability Stages use of BIM

2 Concept detailed brief, scope, scale, form, budget Initial design criteria, design options, cost estimates, selection of preferred option First alignment of Brief + Design + Budget

3 Design Development detailed form, function and cost plan Components: overall size, typical detail, performance, outline specification, co-ordination that affects size and performance

4 Production Information final detailing, sizing, positioning, specification of all systems and components enabling manufacture or construction

5 MI&C Information fabrication, manufacture, installation, verification testing, O&M manuals, as built information DataValue Element ID j Element typePump 4j-b Part No – 2323 ManufacturerPrestige Net weight1.87t Service interval5,000 hours O&M RefTTA-4 Programme codeWP4-L2-C34 Install date Commission date Residual risks4a/d, 6, 7, 9b

6 Post Practical Completion Handover “Soft Landings” and use & use

Integrated scope for all

BIM is Definition of the project from inception to use –SoS provides the framework foundation BIM is collaboration, integration and co-ordination across contract boundaries –SOS gives the clarity of responsibilities BIM requires flexibility of approach; projects are different –SOS gives organisational and management framework but with bespoke project protocols

The Scope for BIM

Next steps Finalise modifications to SoS for BIM projects Industry standard for level of information in Model at each stage. Recommendations on Ownership of information in Model