Commissioning KP 0ESAC December 2009 1 Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.

Slides:



Advertisements
Similar presentations
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
Advertisements

Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
PROJECT RISK MANAGEMENT
Texas Department of Information Resources Presents
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
Project Change Management
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Modern Systems Analysis and Design Third Edition
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
What is a project? Project Management Institute definition
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
Project Management based on the Project Management book of knowledge Risk Identify, analyse and respond to risks Resources Make most effective use of human.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
S/W Project Management
PMP® Exam Preparation Course
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Chapter 14 Information System Development
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
European Conference on Quality in Official Statistics Session 26: Quality Issues in Census « Rome, 10 July 2008 « Quality Assurance and Control Programme.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 Preliminary Satellite in flight status.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Software Phase V Testing and Improvements to Test Procedures S. Corder and L.-A. Nyman April 18, 20131ICT Planning Meeting, Santiago.
IOCP High Level Plan, 8 September In-Orbit Commissioning Phase: High Level Planning.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/ Operations Report of LEOP S. Burgaud / CNES.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Network design Topic 6 Testing and documentation.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
ARISS meeting ESTEC 2014 HAM Video ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC Ground Segment HAM TV standard The effects of the.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
February Monthly Status Review (MSR) Note: No presentation this month
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Project Management Processes for a Project
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
10 W EEK P ROJECT S COPE OF S ERVICES March 13th, 2014.
Team-Based Development ISYS321 Managing the Information Systems Project.
SMOS Commissioning KP-0, ESAC, 9 December /17 Payload Functionality during SODAP: preliminary review SMOS Project Team, ESTEC/ESAC/ESRIN EADS-CASA.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
DBM 384 Week 4 Learning Team Executive Summary Memo Draft Check this A+ tutorial guideline at 384/DBM-384-Week-4-Learning-Team-
ESA's Ground Station Network Prospects for operations of the Lagrange missions S. Kraft OPS-L , K.-J. Schulz OPS-GS 08/03/2017.
Project Integration Management
SDO Flight Dynamics Subsystem
[Project Name] Project Report
[Project Name] Project Report
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status

Commissioning KP 0ESAC December 2009 Presentation Summary SODAP Scope SODAP Tasks SODAP Team SODAP Timeline SODAP Procedures SODAP Execution: –SODAP Week 0 –SODAP Week 1, 2 SODAP Outcome SODAP Observation Conclusion and Recommendations 2

Commissioning KP 0ESAC December 2009 SODAP Scope 3 Switch On and Data Acquisition Phase Lesson learnt. Insure before instrument commissioning starts the following: 1.Basic Instrument Health check 2.Verification Space to Ground Links XB 3.End to End functional data flow verification 4.Communication Scenario Verification 5.Opportunistic feed to processor and DPGS PLM-Health Check + SODAP-RF

Commissioning KP 0ESAC December 2009 SODAP Tasks 4 For both ESAC and SVALSAT : Check RF-links and budget Verify XB masks and behaviour at high low elevation and identify operational constraints. Confirm correctness timing of station and PLM XB scheduling Exercise the different scenarios foreseen in Communication Baseline Doc Exercise autonomous downlink and OBSW reset Verify Data delivery to DPGS

Commissioning KP 0ESAC December 2009 SODAP Team(1) 5

Commissioning KP 0ESAC December 2009 SODAP Team(2) 6 + Insa DPGS Operation Team at ESAC

Commissioning KP 0ESAC December 2009 SODAP Timeline (1) 7

Commissioning KP 0ESAC December 2009 SODAP Timeline (2) 8

Commissioning KP 0ESAC December 2009 SODAP Procedures (1) 9 Described in: Plan for RF activities during SMOS SODAP SO-PL-ESA-GS-6515 SMOS SODAP-RF Procedure Issue 0 Draft 2 SO-GS-ESA-TP-6623

Commissioning KP 0ESAC December 2009 SODAP Procedures (2) 10 ESAC

Commissioning KP 0ESAC December 2009 SODAP Procedures (3) 11 SVALSAT

Commissioning KP 0ESAC December SODAP Week 0

Commissioning KP 0ESAC December 2009 PLM-Health Check Also known as Pre-SODAP Implemented week 0 following switch-on All OK. See Presentation by FOS 13

Commissioning KP 0ESAC December SODAP Week 1-2 RF and scenarios

Commissioning KP 0ESAC December 2009 Preliminary outcome ESAC (0) 15

Commissioning KP 0ESAC December 2009 Preliminary outcome ESAC (1) 16

Commissioning KP 0ESAC December 2009 Preliminary outcome SVAL (2) 17

Commissioning KP 0ESAC December 2009 Preliminary outcome (3) 18

Commissioning KP 0ESAC December 2009 Preliminary outcome (4) 19

Commissioning KP 0ESAC December 2009 Preliminary outcome (5) 20

Commissioning KP 0ESAC December 2009 Preliminary outcome (6) 21 All 27 tests executed. More than 50 Gbyte data acquired and analysed. 135 XB passes have been scheduled Functional chain OK (timing, dependency on elevation) i.e. no operational constraint identified. Timing setting tuned at LOS Different setting of stuffing data with good results (TBC) SVAL XB tracking using SB for initial lock tested

Commissioning KP 0ESAC December 2009 Preliminary outcome (7) 22 ESAC links budgets and behavior at different elevation

Commissioning KP 0ESAC December 2009 Preliminary outcome (8) 23 SVALSAT RF links budgets and behavior at different elevations

Commissioning KP 0ESAC December 2009 Preliminary outcome (9) 24 SVALSAT Conclusion The Eb/No observed is between 15 and 20 dB over all passes taken. This shows that there is a large system margin. At 15 dB Eb/No the IF input level is -40 dBm and the antenna tracking receiver SNR is about 17.5 dB. The threshold SNR for antenna autotrack is 10 dB. This means that there is a system margin of 7.5 dB.

Commissioning KP 0ESAC December 2009 Preliminary outcome (10) 25 Data continuity checked, major problems observed since data is lost on-board on MM partition 3

Commissioning KP 0ESAC December 2009 Observations working list(1) 26 Informal working list of observations to be changed to formal at subsystem level OBS/AR/NC/SPR if/as needed. List will be cleaned up at end of SODAP Major issues from SODAP point of view are: Missing Packet detected (problem with on-board MM writing) (see presentation from FOS) Duplicated/lost XB_DOWNLINK to SVALSAT Occasional crashes of DAS acquisition Inconsistent performance of E2E WAN transfer

Commissioning KP 0ESAC December 2009 Observations working list(2) 27

Commissioning KP 0ESAC December 2009 Preliminary Conclusions 28 The System can deliver XB data to support IOCP Both ESAC and SVAL scenario feasible

Commissioning KP 0ESAC December 2009 Recommendations 29 1.Initiate IOCP with NRT Communication scenario 2 orbit overlap 2.Address problem in acq. part of DAS to make it robust or consider alternate procurement. 3.Initiate implementation of OBSW modifications to cope with MM write error and partition disabling issues 4.Complete performance evaluation of NRT WAN link. 5.Decouple XB station commanding from data dissemination (both Short and long term)

Commissioning KP 0ESAC December 2009 Thanks 30 Thanks to the all Team for hard work and long hours