1 LIGO-D1201292-V2 LLO X-End CERX VEAX PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.

Slides:



Advertisements
Similar presentations
Craft, Design, and Technology.
Advertisements

1 LIGO-D V3 LLO X-End CERX VEAX PVC – 6 x 10 PVC – 6 Cap ¾ QuickEdge 5/8 QuickEdge 6+ hole centered 24 up, 39 over.
LLO Addendum to Basic Laser Safety Training
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
Hoist Lifting it Right.
MNM Fatal Fall of Person Fall of Person October 17, 2013 (California) October 17, 2013 (California) Cement Operation Cement Operation Journeyman.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
LIGO-G v2 Form F v1 Advanced LIGO1 PROVISION OF SPACE FOR LHO aLIGO OPLEV & PHOTCAL INSTALLATIONS Abstract: The purpose of this document.
Chapter 34 Bridge Construction.
DRAWING USING SURFACES 115. To start your SURFACES drawing, go to new drawing, choose PART. Once the Part screen appears, click on START, choose MECHANICAL.
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
Graphic boclair academy MEASURED PERSPECTIVE.
1 Laser Beam Coherence Purpose: To determine the frequency separation between the axial modes of a He-Ne Laser All sources of light, including lasers,
Copyright © Texas Education Agency, All rights reserved.
LIGO-G M Photon Calibrator DRR & CDR: Response to Reviewers’ Report Phil Willems, Mike Smith.
May Madness – VEX RED ALLIANCE STATION RED HUMAN ZONE BLUE ALLIANCE STATION VEX Board BLUE LZ (2x2) BLUE LZ RED LZ BLUE HUMAN ZONE.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Competency: Draw Foundation Plans
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
:56 EasyPreparation without Barcode Reader.
 In ancient times, there were no machines to assist in transporting large stones for the building of pyramids  People had to get very large stones across.
Reflection in Plane Mirrors Objectives: Investigate reflection in plane mirrors Verify the “1st Law of Reflection” Compare image location to object and.
Physics 014 Images. Topics  Plane mirrors  Spherical mirrors  Thin lenses.
LIGHT.
Using the Alphabet of lines. Drawing should be near bottom left corner. The front view shows how wide and how tall the object is.
Reflections.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
Square Pyramid (cut). Cut Square Pyramid - Problem The given views show the Front Elevation and unfinished Plan of a cut square pyramid. Draw the following.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 LIGO-G V2 LLO CDS Electronics Rack Naming Scheme CDS racks are named according to site, IFO designation, subsystem use, station (location) and.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
SAXS/WAXS Conversion for Beamline Engineering Review.
Planometric Views (room corner). GC Credit Paper – 2002 – Question 3 An Elevation and Plan of a room layout are shown. Using the given sizes and start.
LIGO- G050xxx -00-D Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures Dennis Coyne (with input from many) G May 4 th 2005.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Line Convention.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Practical considerations for quad suspension upgrades Giles Hammond, Norna Robertson, Travis Sadecki, Brett Shapiro, Betsy Weaver G v3.
WORKBENCH WALL MOUNTED WALL MOUNTED OR FREE STANDING FREE STANDING SHOWN.
Auxiliary Optical Systems - AOS
Power Monitoring – Requirements (1)
Environment. Waterfall.
Shawlands Academy Department Of Technical Education
Revolved Boss/Base Solidworks, a tutorial.
BSC HEPI Pier Amplification
Dimensioning Demo Let’s Dimension it Should we SIZE it?
2.2 Gallon TourTank Installation
Draw a quadrilateral And another …
Addition Grids.
Competency: Draw Foundation Plans
Dimensioning Demo Let’s Dimension it Should we SIZE it?
Cubes Orthographic projections One and Two-point Perspective
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
Graphic Communication
RPC SYSTEM LAYOUT and DIMENSIONS
Dimensioning Demo Let’s Dimension it Should we SIZE it?
Graphic Communication
Running a Java Program using Blue Jay.
Presentation transcript:

1 LIGO-D V2 LLO X-End CERX VEAX PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over

2 LIGO-D V2 VEAX LLO Existing Cable Piers Locations  Corner Station Cargo Door  Reference (0) Waterfalls Hole = 10.0 x 10.0 = 4.0 d Waterfall

3 LIGO-D V2 VEAX LLO Existing Cable Piers Locations  Corner Station Cargo Door  Reference (0) Waterfall Hole = 10.0 x 10.0 = 4.0 d VE Pump 26 x 56.5 VAC ISCB4L 72 x ISC SUS

4 LIGO-D V2 VEAX Overlay NOTE: This drawing is NOT correct yet. It was made by mirroring the VEAY drawing D v1. Its ultimate purpose is to show the existing cable tray and piers relative to the as-built IFO. Things that can be done: (Note: Blue trace is (mostly) existing tray.) 1) Remove old cable tray and pier that interferes with dome parking. 2) Locate L1-ISC-XR1 farther away from existing pier for clearance. 3) Suggest joining basket around BSC to existing cable tray at waterfall. 4) Used removed pier to extend cable tray to L1-ISC-XR1. 5) Add cable tray to reach L1-SUS-YR1. 6) Remove parallel waterfall, move ‘T’ to primary waterfall. Questions and comments: 1) Where does 11U Short Rack (D v11) go? (Ignore) 2) Where does L1-AOS-XR1 (if it needs to exist) go? (Does not exist) 3) What does pentagon-2 mean regarding tray removal? Is there tray across the beam tube from L1-SUS-XR1? (Ignore) 4) Is the called-out 10’ height important for some reason? LLO height is 8’. (OK) 5) What are the double doors in the note all about? (Ignore) 6) A door is missing from the garb room to the VEA. (Ignore) 7) The doors are missing from the mechanical room. (Ignore) 8) L1-VAC-XR1 is missing. (Shown) 9) All cabling that currently uses under-beam tray and the waterfall is missing. (Kurt) 10) The Photon Calibrator is missing. (Mounted to tube – part of OPLEV)) 11) VE Pumps are not shown. (Shown) 12) Size of ISCB4L is not specified. (72 x 48) Existing layoutNew layout 6

<< X-End Racks LIGO-D V2 5 CDS Electronics Room X-End (CERX) Rack Layout (L1-FAC-XC1)L1-FAC-XC1 CERX (L1-VDC-XC1)L1-VDC-XC1 (L1-VDC-XC2)L1-VDC-XC2 (L1-DAQ-XC1)L1-DAQ-XC1 (L1-SEI-XC1)L1-SEI-XC1 (L1-SUS-XC1)L1-SUS-XC1 (L1-SUS-XC2)L1-SUS-XC2 (L1-TCS-XC1)L1-TCS-XC1 AC Power Signals and Fiber DC Power It is 70’ from the L1-FAC-XC1 Rack to the knee of the waterfall in the VEAX. The height of the cable trays is 8’.