27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.

Slides:



Advertisements
Similar presentations
ARA Production Status Jiwoo Nam. Overall Still Procurement Stage Mechanics under fabrication Delay on DAQ-stack boards, UW/UMD.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Walls crates cables gas chambers electronics CERN adb.
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Technical Support Activities in PH-ADO-PO
Compressor status AWAKE Technical Board meeting 19 August 2015.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
13 September 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Delivery Installation Connector work Testing Summary.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
SCT week: 14th - 16th Dec 04 Spine progress R. Bates University of Glasgow.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
PIXEL CAEN Installation Status
DCFEB Production for LS2
Cabling for LHCb Upgrade
Nearly the end of a long story...
Apparel management & quality control
X-ray Pump-Probe Instrument
LS1 status 17/03/2014.
Presentation transcript:

27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the next six months Safety course 12:45

27 September 2005A.Ciocio - ID Week2 Overview 2044 (+spares) double length Type IV cables (Power & Control) from PP3 racks through holes to US(A)15 racks 4088 (+100 spares) Type II/III (spliced on the outside of the calorimeter and up at z=0) from PPB(F)1 to PP3 racks DCS, Heater Cables, and PP3 (will be discussed in the ID installation) 8 PP3 racks in each side of the cavern (US&USA sides) –Up to 10 crates of 30 PP3 units 11 power racks in US15 and 11 in USA15 –Up to 4 crates of 48 channels TC installation team: –S.Malyukov, E.Kudinov, L.Reed, N.Massol –27 people from IHEP Protvino –Several teams are working in parallel (~9 people per team)

27 September 2005A.Ciocio - ID Week3 PP3 Racks in UX15 (US15 side) Y.52-4.X7, Y.53-4.X7 Y.52-1.X6, Y.46-1.X6 Y.43-1.X6, Y.34-1.X6 Y.51-2.X2, Y.52-2.X2

27 September 2005A.Ciocio - ID Week4 PP3 Racks in UX15 (USA15 side) Y X8 Y X8 Y X8 Y X5, Y X5 Y X2, Y X2 Y X1

27 September 2005A.Ciocio - ID Week5 Layout of PP3 rack in UX cavern

27 September 2005A.Ciocio - ID Week6 PP3 to US PP3 rackUS rackhole UX/US Y.37-1.X6Y S212 Y.43-1.X6Y S211 Y.43-1.X6Y S210 Y.47-1.X6Y S210 Y.43-1.X6Y S29 Y.47-1.X6Y S29 Y.52-1.X6Y S27 Y.52-4.X7Y S27 Y.52-4.X7Y S221 Y.53-4.X7Y S220 Y.53-2.X2Y S26 Y.51-2.X2Y S219 Y.53-4.X7Y S219 Y.51-2.X2Y S25 Y.52-1.X6Y S25 Y.52-2.X2Y S24

27 September 2005A.Ciocio - ID Week7 Installation of Type IV Cables Type IV cables are delivered in double lengths and pulled between the UX15 and the US(A) caverns ~800 pieces (double length cables) installed on US side (almost completed) –Up to 40 cables per day pulled from UX to US(A) UX side US(A ) side PP3Power Supply Dummy PP3 Racks on Level 6 US side Hole

27 September 2005A.Ciocio - ID Week8 In US15 Cut cables and connectors on the power supply side installed in situ First rack (200 cables/connectors) completed early in July –Work performed by SEDELEC (subcontract of KontaktSysteme that provides the double length cables –Many mistakes (~20 connectors have just been repaired) several label mismatch still to be fixed –They raised the cost significantly for future connector work New Plan –TC will help with connector attachment –Nicolas Massol joined TC in September. One of his tasks is to organize connector activity –Work with Petr Kubik (Prague) to discuss technical aspects and qualify samples made by other companies being contacted –Meanwhile cables are being cut to some extra length and ~ all tooling has been purchased to make prototypes

27 September 2005A.Ciocio - ID Week9 Delivery Issues Installation rate driven by delivery schedule –Delivery in July/August was very slow Vacation and QA problems Connectors quality Bobbins damage –Bobbins already at CERN are going to be sent back to the fabrication company (Novacavi) to get cleaned up Delay of components delivery from CERN to company Need to keep contact with CERN purchasing and Vendor Ramp up –200 pieces/week expected soon after bobbins damage crisis is solved but so far the max number of pieces we have seen is 120 –Hopefully all type-IV delivered by mid-November

27 September 2005A.Ciocio - ID Week10 Delivery (QA - Connectors) Connector’s signal wires too long Some cables couldn’t be used One week halt of production

27 September 2005A.Ciocio - ID Week11 Delivery (QA - Packaging) Packaging: palette were sent with only plastic wrap around bundles Cables were getting wet during transportation and delivery at CERN About 40 cables lost (~30 in one delivery)

27 September 2005A.Ciocio - ID Week12 Delivery (QA - Bobbins) Cable bobbins dirty and damaged Bobbins are kept outside (at CERN) for long time Other (than water) damage under investigation Company claims delay in fabrication to deal with these problems Don’t know yet delay due to shipping bobbins back to Italy

27 September 2005A.Ciocio - ID Week13 Type II/III Cables Double harness ordered from Ineo Work on splicing started in August Installation of connectors on the PP3 end at the factory –Need to provide exact length for both types –Use dummy PP1 with some load to test that the splice didn’t get damaged after installation –JST and FCI connectors very delicate – better to test at the PP3 end Two Contracts first to produce all the harnesses and then to install the connectors Splice is verified at the company Need QA going on during production Last visit by Pepe B. Maarit W. and Laurent Gillain(CERN purchasing) quite satisfactory By November all harness will be made Cables with PP3 connectors between November and March

27 September 2005A.Ciocio - ID Week14 Current Installation Activities (Type IV) Overall coordination (Sandra) –Work closely with Sergei Malyukov and the TC team –Provide complete layout/mapping for racks in both sides –Bjarne is still helping from Bergen –Regular presence to check mapping/labels and prepare racks –Discussion on installation priority and occasional revise original layout –update DB table and EDMS documents* –Organize cable testing shifts Connector at the power supply end (Petr Kubik/Prague) Cable testing (Sandra, Petr and SCT Collaboration) Follow up cable procurement and delivery (Pippa, Sandra, Maarit/TC) PP3 installation soon (Ashley French/Melbourne with Petr) * SCT Cables EDMS ID: , Cable Procurement Follow up table ID:508310, Overall Safety and Health Procedure ID:

27 September 2005A.Ciocio - ID Week15 Type IV Testing Tester designed and provided by Ljubljana (Gregor, Erik) –2 Test box + 2 Laptops + test cables –Gregor and Erik upgraded features of tester in July –Web based DB Test steps: –Cables are tested at reception (acceptance test) –After being pulled from UX15 to US(A)15 (uncut-double length) –After they are cut in the US side at connectors are installed Shift planner (developed by D. Robinson) works very well for planning the activities and have people to sign up –(register and contact me) What is needed to be able to take a shift: 1)take the 3-levels safety training course (at the pompiers station) 2)make the access request on EDH (ATLAS-U, LHC Tunnel) 3)get your safety boots & helmet at the CERN store (or borrow them)

27 September 2005A.Ciocio - ID Week16 Procurement Schedule Type IV delivered and installed December Connector work of Type IV (power supply end) could start in 3 weeks and it will take ~4 months January Type II/III double harness with splicingJanuary single cable with PP3 connector Nov-March PP3 delivery and installationOct/Nov

27 September 2005A.Ciocio - ID Week17 Work Plan

27 September 2005A.Ciocio - ID Week18 Safety Training Course Building (Pompiers station) At 12:45 Please arrive 5 minutes earlier to register