Padstow Harbour Commissioner’s Workboat “MOWGLI”.

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

Industrial Boilers Steam generators Closed vessels made of steel and
The information in this presentation is for the
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
M/t SVEVA 17 April 2015www.mediterraneanav.it. 17 April 2015www.mediterraneanav.it.
Adam Larsson, Project Manager, DNV 26 May 2011 Oshima ECO-ship 2020 The open hatch bulk carrier of the future.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
On In-Use requirements UNECE R55 make no distinction between performance and requirement Annex 6 lays down how the performance of coupling equipment shall.
Ship’s measurement Lesson 3.
Fiberglass Pads and Mats for Heavy Equipment
ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
One of the biggest container ships in the world, entering the port.
Containerships for big harbours. It is bigger than an aircraftcarrier with 5000 sailors. It carries 15,000 containers with 13 crew.
Marine Auxiliary Machinery Chapter 9 Lesson 5 Deck Machinery Cargo Handling By Professor Zhao Zai Li
1 KAWASAKI Kawasaki Hydraulic Deck Machinery February 01, 2008.
By Dean Mckinstry National Diploma Project Electro Plating Fixture.
CE 230-Engineering Fluid Mechanics Lecture # 6 Basics of Fluid Statics.
GD150 Liquid bulk contactless compressor. GD150 Compressors.
Belleville Locks & Dam Barge Accident on 6 Jan 05 John Clarkson
Adapted from Skračić,T., „Waypoint”
CONSTRUCTION TECHNOLOGY & maintenance
Vessels ROVs & suport toolings special machines ROV multi-tasking conclusions VLV T Workshop Enabling technologies for deepwater operations Amsterdam,
1. Bucket capacity42m 3 Operating weight720,000 kg PC8000 Bucket capacity0.008m 3 Operating weight300 kg PC01 Product Range (Hydraulic Excavators) 2.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
© 2008 EU-MOP Consortium Integrated EU-MOP System Design Madrid, Spain 24 January 2008 Yiannis Ventikos Dept. of Engineering Science University of Oxford.
DROPS FORUM 9 th February Racks of 7” Line piping were loaded onshore, upon arriving at the location the deck crew noticed a 24V impact driver lying.
WORK BOAT RENTALS 1307 Tool Dr. New Iberia, La PH: Fax:
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 1 Machines Make It Possible.
Mobile Integrated Remains Collection Systems
Chia Po Lin EWTEC Lisbon PhD Thesis Edinburgh University.
CARIBBEAN MARITIME INSTITUTE DIPLOMA IN INTERNATIONAL SHIPPING & LOGISTICS General Ship Knowledge ML 301.1(3.0) 11/23/2015 Capt. Devron S. Newman - GSK.
City Class Tram Presentation by TRAM Power Ltd. Unit 4
A B C E D F A. Furuno Nav Net 3D with AIS system B. VHF radio C. GPS system D.Hailer listen/talk system E. F.L.I.R. camera system F. Jacob high powered.
Bavaria 37 SH Bavaria 37 SH is a charter motoryacht 2008 model with less than 140 engine hours in excellent condition inside & outside Based in Leukas.
Work Boat. Spec’s ●Overall length 17’ ●Max Beam 8’ ●Draft is 26” ●Weight: 2000 lbs ●35 mph top speed ●Off set center console ●#5086 Marine Aluminum Alloy.
Rapid Strategic Lift Ship (RSLS) FY 04 Feasibility Studies February 2005 SEABASE CONUS Steven Wynn NAVSEA 05D1
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
February 2016 CMAL Project Updates Uig triangle 1 New Dual Fuel Ferry.
By Timothy Czerviski Andrew Casey Jomarie Erazo Roland Clayton.
Procedure for Using All Terrain Vehicles (John Deere Gator and Kubota RTV)
TUGS & WORKBOATS TUGS ASD TUG 2810 HYBRID. TUGS & WORKBOATS TUGS 2 ASD TUG 2810 HYBRID Pollution of sea water by garbage. Pollution of sea water by sewage.
Belle RT 66 Trench Rammer BELLE GROUP TRENCH RAMMER 4 Stroke Honda Engine.
Brokered by Scruton Marine Services 1 PV2250 $299,000 USD.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
MANUFACTURING ENGINEERING DEPARTMENT
Rosava Engineering Group Gantry Crane Web- Mobile , +91.
Session 2: Saws, Part 2; Other Power Tools
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
HIAB TRUCK HIRE SERVICES BY DELTA TRANSPORT
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
MEDITERRANEA DI NAVIGAZIONE SPA
MEDITERRANEA DI NAVIGAZIONE SPA
My engineering project tipping swarf bin
Catania 20 Feb ’13 KM3NET Marine Operations Catania - Status
EXCALIBUR 4500 m3 Ethylene Carrier
Connect With Rosava Engineering Group Web- Mobile , ,
Horizontal Shaft Impactors
Designed by Steve Miller for Ajax Machinery
WORK BOAT RENTALS 1307 Tool Dr. New Iberia, La PH:
MEDITERRANEA DI NAVIGAZIONE SPA
KING ARTHUR 4500 m3 Ethylene Carrier 02/12/2018.
M/t SVEVA 7 December December 2018.
Developments of container ship concept
M/t COSMO 4 February 2019.
Chia Po Lin EWTEC Lisbon PhD Thesis Edinburgh University
TRANSPORTATION ENGINEERING II
Auto Winch Machine September 2014 Marketing Department.
CICA Lift of the Year ≤20 tonne load Entry Template
Presentation transcript:

Padstow Harbour Commissioner’s Workboat “MOWGLI”

Padstow Harbour Commissioners Workboat “MOWGLI” Steel ‘Multicat’ design. Steel ‘Multicat’ design. LOA = 12.35m. LOA = 12.35m. Breadth = 3.5m. Breadth = 3.5m. Draft = 0.65m. Draft = 0.65m. Air Draft = 2.6m. Air Draft = 2.6m. Weight = 24 Tonnes. Weight = 24 Tonnes. Speed = 6.5 Knots. Speed = 6.5 Knots. Twin engines give excellent manoeuvrability. Twin engines give excellent manoeuvrability.

Padstow Harbour Commissioners Workboat “MOWGLI” Used by PHC for servicing moorings, navigation marks and general harbour works. Used by PHC for servicing moorings, navigation marks and general harbour works. Has worked on canal system before and has low air draft. Has worked on canal system before and has low air draft. Large working deck space. Large working deck space. Capability to transport and operate small excavators from deck. Capability to transport and operate small excavators from deck. Fitted with hydraulic crane & 4.5 T winch with Dynex ‘wire’. Fitted with hydraulic crane & 4.5 T winch with Dynex ‘wire’. Has previously towed a plough to remove canal bed ‘high spots’ – ‘A’ frame could be re- fitted if required. Has previously towed a plough to remove canal bed ‘high spots’ – ‘A’ frame could be re- fitted if required.

Padstow Harbour Commissioners Workboat “MOWGLI” Hydraulic crane with 750Kg lift at maximum outreach of 5m. Hydraulic crane with 750Kg lift at maximum outreach of 5m. Twin Ford Mermaid Mariner engines, 125 HP each. Twin Ford Mermaid Mariner engines, 125 HP each. ‘Ruggerini’ Genset, 110V or 240V. (3 phase portable genset available) ‘Ruggerini’ Genset, 110V or 240V. (3 phase portable genset available) Deck load capacity of 4 Tonnes. Deck load capacity of 4 Tonnes. Available for hire with qualified boatmaster who is also a welder / fitter / general engineer. Available for hire with qualified boatmaster who is also a welder / fitter / general engineer.

Padstow Harbour Commissioners Workboat “MOWGLI” Transportable by road with normal low loader. Transportable by road with normal low loader. Not a notifiable load, so no escort required. Not a notifiable load, so no escort required.

Padstow Harbour Commissioners Workboat “MOWGLI” FOR FURTHER INFORMATION OR TO HIRE THIS VESSEL Please Contact Padstow Harbour Office on