GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of 56.000 m m2 built area and 45.000 m m2 of net area spread.

Slides:



Advertisements
Similar presentations
©2008 SIVECO Romania. All Rights Reserved. February 16, 2014 PAN-EUROPEAN WORKPLACE MOBILITY PEWTA-EMPLOYERS 2009.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
You can trust in our experience development planning construction We developed each property PROJECT OFFERS ARAD 2010.
Basic information – Louvre (completed 07/2008). Location Kutvirtova 339/5 Prague 150 meters from tram stop Laurová, trams 4,6,7 150 meters from metro.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
3 Bedroom House + Office, Kitchen and Dining Baneasa - Bucuresti - Romania.
Nottingham Sustainable Travel and Transport. Although Nottingham has lower than average levels of car ownership, levels of traffic are continuing.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
Lecture(5) Instructor : Dr. Abed Al-Majed Nassar
Ch. 7 – Parallel Parking NY State DMV.
Investigating Traffic in Glasgow
Access to Princess Park By Public Transport GLOBAL VILLAGE MULTICULTURAL FESTIVAL.
Investment Project by V i ADI Ltd.. LOCATION ‘Thrace’ International Logistics Centre is located in the northern part of the district of Plovdiv: 1.5 km.
Mobility plan for Geneva Airport employees. Constraints and needs for the mobility of Geneva airport staff Airport staff: all employees working in the.
The Urban Transport Problem  Fifth Freedom Problem- auto convenience and privacy  Congestion- traffic overloads, poor infrastructure, vehicle diversity.
Barbora Hladká Zuzana Kmeťová tercia Secondary Grammar School Párovská street 1 Nitra, Slovakia.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
The Board of Governors of Exhibition Place June 2008 ENERGY ACTION PLAN.
VBS – Lesson 3 Ingress and Egress
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
Presentation of the city  IASI is a city and municipality in north- eastern Romania. The city was the capital of the Principality of Moldavia from 1564.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
LAYOUT OF COMMERCIAL BUILDINGS
Class “B+” Business center On the border of Moscow On the Novokurkinskoe highway 10 killometers from international airport.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Sintropher Meeting Veurne, 18 March Main access possibilities towards Veurne.
Module 5 My neighbourhood Unit 2 Choosing a new flat What kind of flat What kind of flat would you like? What kind of flat What kind of flat would you.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Module 10 Lesson 2 Factors Affecting Business Location.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Offered for forward sale The office and trading centre on the intersection of the Melnikova str. and Dorogozhitskaya str.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Official Plan Zoning Bylaw Land Uses
Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Craiova City CHUMS Changing Habits for Urban Mobility Solutions Gabriel.
CityMobil Resarch Center for transport and Logistics Francesco Filippi JIM-EV May 2009.
 Axiom 2 a Precious project with a precious returns on your investment on 200ft wide S.P Ring Road - optimally close to the urban heavens of Developed.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Steve Beverley SUSTAINABLE TRAVEL MANAGER METROCENTRE, GATESHEAD.
Transport Update Chris Carter Transport Strategy Manager.
Impacts Europe Impacts of planning instruments on suburbanisation and modal split in the Vienna Region Angelika WINKLERMunicipal Department 18.
Martin KalabMarketing and TramFlorence Jan Marketing and Tramway in Vienna Martin Kalab Marketing/Advertising Wiener Linien.
How to get to Brasov from the airport. By taxi: This option is the most convenient for saving your time and preventing the complication of connections.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
7 May 2014 Sustainable transport vision for Greater Cairo.
Data Center Facility & Services Overview. Data Center Facility.
Atlas House Business Center BELGRADE SERBIA Each office is independently owned and operated.
This is…. $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 LawsVH PolicySignsPotent Potables.
2016 Bookings Open Now QUALITY STUDIO LIVING All of our studios feature: An all inclusive charge – no separate utility bills to pay Prices from £125 a.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
1 Impacts of the growing motorization on the transport of the Warsaw metropolitan area Tamás Dombi, ZTM Warsaw.
PARKING…..
Direct train link to Manchester Picadilly Use this for GMex and Portland Street Premier Travel Inn’s WAF organised shuttle – Terminal 3 Arrivals hall –
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Land Use Patterns. This is the Burgess Model. Why do you think it has been designed like this?
Mobility in Hasselt. Content of this presentation Short introduction of Hasselt Mobility plan Campaigns City projects.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Josh Secrieru and Nick Parvahesh Planning 10
M PARK AD Sofia.
ECO TOWERS Energy efficient office spaces next to Delhi in NOIDA
Getting to the Walters Art Museum, Sunday, September 18th
OFFICES – TSARIGRADSKO SHOSSE 99
OFFICES AND APARTMENTS – Sheinovo 7
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
ISA Prime Developments
M&E SYSTEM.
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Presentation transcript:

GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of m m2 built area and m m2 of net area spread over two buildings situated in a park like,landscaped setting with emphasis on a high quality, functional and pleasant work environment. Two levels of underground parking offer 844 parking places, providing 1 place for each 50 m m2 of office space, in addition to abundant street level parking bays; The two office buildings are designed in such a way that they afford flexible floor plates ranging from m m2 to m m2 in size; Modules to be rented starting from 300 m m2 per floor; An integral part o Global City is the ground floor retail arcade which will provide convenience shopping, gastronomy and various other services to tenants and their guests.

GLOBAL CITY BUSINESS PARK Technical Specification Each building provides open plan layout from m2 up to m2 in size, organized on a 8.1m structural grid, with floor loading capacity of 4kn/m2 throughout Office floors have a clear height of 2.80 m 20 cm raised floor Suspended ceiling with built-in fluorescent lights to achieve 500 lux on the work plane 18 high speed lifts spread over four main service cores facilitate the subdivision of space on each floor to suit the tenants’ needs All buildings are air conditioned using ceiling mounted fan coils on a 4 pipe HVACsystem (1/10m2 plus 10%) Ventilation system, fresh air ductwork supply 12 litres/s/person and exhaust to all areas High safety standards throughout the buildings: sprinklers, fire alarm and emergency standby generator for offices; sprinklers and smoke ventilation control systems for car parks Modern access control and security system combined with security personnel

GLOBAL CITY BUSINESS PARK

GLOBAL CITY BUSINESS PARK - SITE PHOTOS - Construction started in September 2007; - Completion date: April 2009.

GLOBAL CITY BUSINESS PARK Transportation Global City BC shuttle bus line – buses and minibuses (included in service charges) – Route: from Pipera Subway Station (stop in front of the station)-Global City Business Park; – Schedule: Monday to Friday at 6:50, 08:15, 08:45, 11:15, 13:00; Saturday at 9:45; – Route: from Global City Business Park to Pipera Subway Station; – Monday to Friday at 12:45, 13:15, 17:05, 17:20, 17:25, 18:05, 19:05, 20:20; Saturday at 14:10; Public Transportation Line Isuzu buses buses- line provided by the City Hall operating on 25th of April 2009 – Route: Aurel Vlaicu Subway Station – Pipera Subway Station- Petricani Street intersection with Dimitrie Pompei Blvd (station of trams 16 and 36) - Global City Business Park (stops in front of the building) - OMV Gas Station (where it turns); – Schedule: every 10 minutes between and ;– Price per ticket 1.5 RON; – The schedule will be revised based on the growing number of the passengers; considering it’s a new line, it will be used mainly by Global City tenants, until people in the area will become aware of its existence; for the moment the buses are branded with Global City logo. With the increasing number of passengers, the number of buses will be supplemented as well the schedule, it will be extended; Extra municipal public lines 445 si 567 – Isuzu buses, 24 places – Route: Pipera Subway Station (stop in front of the station)- Global City Business Park – Zoo Baneasa – Dimieni; – Schedule: between 05: :00; – Price per ticket 2 RON.

GLOBAL CITY BUSINESS PARK Access and infrastructure improvements The project provides easy access to the two airports, Baneasa and Otopeni and is within a short drive to the northern fringe of the city center – the areas around Piata Victoriei and Piata Charles de Gaulle. In terms of public transportation, the district is served by the Pipera metro station, the northern terminus of Bucharest Metro Line 2, busses and two tram lines: – Subway – the Pipera stop – Buses – numbers 112,135 and 445 – Tramways - numbers 16 and 36 The access to the premises is done through 3 main boulevards, namely Sos Petricani, coming from Tei district, through Dimitrie Pompei Blvd, coming from Barbu Vacarescu area, Sos. Pipera coming from Baneasa and Iancu Nicolae area. The project is 6 km away from Piata Victoriei, 1 km away from the future Bucharest -Brasov highway and only 5 km away from the Baneasa Forest. A shuttle bus service will be provided from Pipera metro station to the Office building As future infrastructure improvements in the area, several aspects should be mentioned: Bucharest Nord Blvd will enlarged to 4 lanes, a viaduct over the railway and a new boulevard parallel with the railway will be developed by the City Hall to ensure a fluid traffic in the area. The new boulevard called Octavian Goga Boulevard will connect Soseaua Bucuresti-Nord with the ring road. Another aspect is the construction of the new Bucharest-Brasov highway that will take over the traffic exiting the city.