TERMINAL LAY OUT SYSTEMSFACILITIESCAPACITIES. Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities.

Slides:



Advertisements
Similar presentations
Gdańsk Container Terminal Co
Advertisements

Operadores de Contentores S.A.
Gateway to a Modern Logistics Hub State of the Art CFS facility To re-define logistics solutions… German Express Shipping Agencys.
ICTT Vallarpadam First Trans-shipment terminal in India.
1 Damietta Container & Cargo Handling Co. DCHC General overview January, 2012.
Gdańsk Container Terminal Co Established in 1998.
TERMINAL OPERATIONS GENERAL ASPECTS GENERAL ASPECTS CRITERIA FOR YARDPLANNING CRITERIA FOR YARDPLANNING CRITERIA FOR SHIPPLANNING CRITERIA FOR SHIPPLANNING.
GLOBAL PORTS CONNECTING GLOBAL MARKETS
Ver. SICT ■ MILE STONE 1948 : Established Sunkwang Co., Ltd. in Incheon, Korea : Obtained Stevedoring / Customs clearance licenses 1963.
Container Inspections. Objectives Explain why inspections Explain why inspections Explain where inspections take place Explain where inspections take.
PT Tangguh Samudera Jaya
CONTAINER TERMINAL FSC Container Terminal FSC Company Presentation December 2010.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
CONTAINER HANDLING EQUIPMENT
Restrictions LOA244 m Draught11 m Air Draught18 m.
Uniport Multipurpose Terminals B.V.
1 GLOBAL PORTS CONNECTING GLOBAL MARKETS. DP World - Vision, mission and values VISION Sustainable value through global growth, service and excellence.
Gdańsk Container Terminal Co Established in 1998.
Intermodal Transportation and Terminal Operations Transportation Logistics Spring 2008.
Automated Container Terminals Will they ever catch up…? Presentation Joppe Burgers 29 May 2008 Busan, Korea.
Ontario International Transport and logistics Chapter 7: Rail and Intermodal.
HOW DO YOU DESCRIBE A CONTAINERPORT? Henry S. Marcus Massachusetts Institute of Technology.
DSM 2315 Shipping and Transport Logistics Management
  WAREHOUSING   DISTRIBUTION   LOGISTICS Consolidated Shipping Logistics Centre JEBEL ALI FREE ZONE, DUBAI, UAE.
■ Brief History of Sun Kwang Co., Ltd.
Maritime Security An Introduction Michael McNicholas.
VICS/VSC Container Terminal Starting point of TRANS SIBERIAN LAND BRIDGE Russia VICS/VSC Container Terminal Starting point of TRANS SIBERIAN LAND BRIDGE.
HKUST IELM 1010/ Seminar Career Talk by MTMAA Simon Law Catherine Chow Clarence Leung Amy Chen CM Wong Sep 17, 2014.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
A Premier Gateway for International Trade Gina Barro Business Development.
Information contained in this presentation is accurate as of February 2014 Global Ports Connecting Global Markets.
CASE I TERMINAL CAPACITY LAY OUT
Information contained in this presentation is accurate as of February 2014 Global Ports Connecting Global Markets.
YOUR CONNECTION TO THE MIDDLE EAST Breakbulk & Project cargo FCL & LCL Consolidation Service Airfreight Warehousing & Distribution in U.A.E. Brokerage.
CenterPoint Intermodal Center (CIC) Largest master-planned inland port in North America. Situated on ~6500 acres just 40 +/-miles southwest of downtown.
CITRUS RAIL TRANSPORT REVIEW 2013 Prospects of Rail Transport for Citrus Exports Statement: the northern citrus production regions of KwaZulu Natal, Swaziland,
Durban RORO Auto/MPT Presentation Update April 2015 to March 2016 delivering freight reliably.
Citrus Throughput Calculation Dwell ave. of 07 days = throughput per slot of 20.0 Dwell ave. of 08 days = throughput per slot of 17.5 Dwell ave. of 09.
2013. TAN CANG WAREHOUSING JSC. ❶ WAREHOUSING SERVICE -CFS warehouse -General warehouse ❷ TRUCKING SERVICE ❸DEPOT/ M&R SERVICE Established: January 4.
Djibouti Ports – DP World Jérôme Martins Oliveira
BTRE Transport Colloquium Mr Michael Phillips, Chairman, Shipping Australia Ltd BTRE Transport Colloquium Canberra, May, 2005 Mr Michael Phillips,
Presentation to btre TRANSPORT COLLOQIUM 2006 Presentation to btre TRANSPORT COLLOQIUM 2006 Transport Reform, Competition and the Future Andrew Davis Development.
PORT REQUIREMENTS FEES & CHARGES. Presenter – Nabeel Ali Operations Manager – FPTL Experience : Agency / Liner (HMM/HLL/RCL) Freight Forwarding and Heavy.
Presentation to FPIP Locators, May 15,2013. ATI is a publicly-listed corporation under the PSE since 1996 ATI operates Manila South Harbor, the Port of.
1 Damietta Container & Cargo Handling Co. DCHC General overview.
2  THE COUNTRY  ROAD TRANSPORT SYSTEM  AIR TRANSPORT SYSTEM  RAILWAYS SYSTEM  PORT LOCATION  PORT OF LUANDA  PORT OF LOBITO  PORT OF NAMIBE 
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Generic Container Flows Shipper Terminal Depot Consignee Full to Terminal Full to Consignee Empty to Customer Empty to Depot Empty to Customer Full to.
Regional Management Development Programme Module 1 Charlotte, June 2013 Business operations presentations Facility: APM Terminals IS – Peru.
H:\VERTR\SEKR\neue Präsi\Entwurf.ppt The importance of RoRo traffic within the Baltic Sea Jörg Ullrich, Lübecker Hafen-Gesellschaft mbH – Port of Lübeck.
Equipment Lifecycle Management
Equipment Lifecycle Management
RIGA CONTAINER TERMINAL Corporate Presentation
MUUGA CONTAINER TERMINAL.
Equipment Lifecycle Management
Equipment Lifecycle Management
Integrated Transport and Distribution Management in Shipping
Gantry Crane Cambodia Rosava Engineering Group Connect With Rosava Engineering Group Web- Mobile-
Windows Tablet App Gate Overview
Damietta Container & Cargo Handling Co.
Shipping and Transport College Rotterdam
Investment opportunities in Italy
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
RIGA CONTAINER TERMINAL Corporate Presentation
Operational Container General Cargo Dry Bulk Ferry Cruise
New Central Fire Station
Damietta Container & Cargo Handling Co.
Consolidated Shipping Logistics Centre
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

TERMINAL LAY OUT SYSTEMSFACILITIESCAPACITIES

Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities Facilities QUAY: QUAY: Ship’s working area Ship’s working area Bollards marked and numbered Bollards marked and numbered Safe access for pedestrians etc. - marked by yellow lines Marking of trucklanes Safe access for pedestrians etc. - marked by yellow lines Marking of trucklanes

TERMINAL LAY OUT Backreach for hatchcovers /shifters etc. Backreach for hatchcovers /shifters etc. STORAGE AREA STORAGE AREA Stacking pattern: Stacking pattern: Straddle carrier: transversal to the quay RTG/RMG:parallel to the quay FLT:transversal to the quay Reachstacker: transversal to the quay Fire fighting connections Fire fighting connections Light masts Light masts

TERMINAL LAY OUT Stacking patterns - fire fighting hydrants Stacking patterns - fire fighting hydrants Terminal Lighting: Large masts, well protected (collisions) Terminal Lighting: Large masts, well protected (collisions) Working area’s: Container crane: Lux Yard working area: Min. 20 Lux Other:Min. 5 Lux Working area’s: Container crane: Lux Yard working area: Min. 20 Lux Other:Min. 5 Lux

FACILITIES GATE GATE ADMINISTRATION BUILDING: Ship’s Agents Customs Truckers etc. ADMINISTRATION BUILDING: Ship’s Agents Customs Truckers etc. CANTEEN plus wash/shower facilities CANTEEN plus wash/shower facilities WORKSHOP WORKSHOP CONTAINER FREIGHT STATION (CFS) CONTAINER FREIGHT STATION (CFS) STORE ROOM STORE ROOM RAILCONNECTION RAILCONNECTION (REPAIRFACILITIES) (REPAIRFACILITIES) MT DEPOT MT DEPOT

TERMINAL LAY OUT IMPORT STACK/ZONING IMPORT STACK/ZONING EXPORT STACK/ZONING EXPORT STACK/ZONING MT STACK/DEPOT MT STACK/DEPOT REEFER STACK REEFER STACK REPAIR STACK REPAIR STACK STACKING OF DG CONTAINERS STACKING OF DG CONTAINERS STACKING OF SPECIALS/OVERSIZE STACKING OF SPECIALS/OVERSIZE

TERMINAL LAY OUT CAPACITY

CAPACITY EQUIPMENT EQUIPMENT STORAGE (AREA) STORAGE (AREA)

CAPACITY EQUIPMENT Container Crane: hrs x 25 ctrs/hr = /yr Container Crane: hrs x 25 ctrs/hr = /yr Straddle Carrier: 3000 hrs x 12 ctrs/hr = /yr Straddle Carrier: 3000 hrs x 12 ctrs/hr = /yr Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = /yr Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = /yr Rail Mounted Gantry Rail Mounted Gantry

CAPACITY STORAGE Storage Systems: Storage Systems: Chassis45 m2/TEU Chassis45 m2/TEU Straddle Carrier16 m2/TEU Straddle Carrier16 m2/TEU RTG12 m2/TEU RTG12 m2/TEU RMG 9 m2/TEU RMG 9 m2/TEU FLT (MT) 7 m2/TEU FLT (MT) 7 m2/TEU FLT (Full)25 m2/TEU FLT (Full)25 m2/TEU Reachstacker15 m2/TEU Reachstacker15 m2/TEU

CAPACITY EQUIPMENT: Containers/moves per hour/shift/year EQUIPMENT: Containers/moves per hour/shift/year STORAGE:TEU’s STORAGE:TEU’s SHIPS:TEU’s SHIPS:TEU’s TEU = Twenty feet Equivalent Unit TEU = Twenty feet Equivalent Unit FEU = Fourty feet Equivalent Unit FEU = Fourty feet Equivalent Unit

CAPACITY STORAGE Criteria: Criteria: Equipment (m2/TEU) Equipment (m2/TEU) Dwell Times:Exports 3-5 days Imports 6 days MT’s25 days Dwell Times:Exports 3-5 days Imports 6 days MT’s25 days Yard Occupancy Factor: 0.75 Yard Occupancy Factor: 0.75 Peak Factor: 1.3 Peak Factor: 1.3

CAPACITY STORAGE EXAMPLE: EXAMPLE: Annual Throughput: ctrs= TEU Annual Throughput: ctrs= TEU 80% Full= TEU 80% Full= TEU 20% MT = TEU 20% MT = TEU Average dwelltimes: 12 days Average dwelltimes: 12 days Yard Handling Equipment: RTG Yard Handling Equipment: RTG

CAPACITY STORAGE Storage Area Requirements: x 12 x 12(m2) x 1.3 x 1 = x 12 x 12 x 1.3= 365 x m2 = 30 ha. Storage Area Requirements: x 12 x 12(m2) x 1.3 x 1 = x 12 x 12 x 1.3= 365 x m2 = 30 ha. Facilities plus working area’s (Trucklanes - Quay - Backreach etc): abt. 35% Facilities plus working area’s (Trucklanes - Quay - Backreach etc): abt. 35% Total Area : 45 ha. Total Area : 45 ha.