Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

Modeling Electrical Systems With EMTP-RV
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
ELECTRIC DRIVES Ion Boldea S.A.Nasar 1998 Electric Drives.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
T. YOSHIDA, J. OYAMA, T. HIGUCHI, T. ABE and T. HIRAYAMA Department of Electrical and Electronic Engineering, Nagasaki University, Japan ON THE CHARACTERISTICS.
Modeling of Induction Motor using dq0 Transformations
HossamTalaat - MATLAB Course - KSU - 19/09/ IEEE Student Branch - College of Engineering - KSU Getting started with Power System Blockset By Prof.
Required and Elective Courses in Power Area. Required Power Courses u ECE 320 Energy Systems I/ECE 321 Energy Systems I lab: Covers single-phase AC measurements,
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Announcements Be reading Chapter 3
ELECTRICAL ENGINEERING: PRINCIPLES AND APPLICATIONS, Third Edition, by Allan R. Hambley, ©2005 Pearson Education, Inc. Chapter 17 AC Machines.
5/21/2015 Using Simulation Tools to Predict and Prevent Vacuum Circuit Breaker Switching Induced Transformer Failures Steven B. Swindler,
Current Contribution from Wind Plant for a System Fault Working Group C17 May 2010 Meeting.
North East Pacific Time-series Underwater Networked Experiment (NEPTUNE): Power System Design, Modeling and Analysis Aditya Upadhye.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
1 Institute of Mechatronics and Information Systems Control and Driving Systems.
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
1 Chapter 8: Procedure of Time-Domain Harmonics Modeling and Simulation Contributors: C. J. Hatziadoniu, W. Xu, and G. W. Chang Organized by Task Force.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Announcements For lectures 8 to 10 please be reading Chapter 3
Power Quality Assessment on Wind Energy systems Presented By vivek kumar(pe610)
Diagnostics of photovoltaic power plants operation
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Protection & Switchgear
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan 風力發電期末報告 Short-Circuit Current of Wind Turbines With Doubly Fed Induction.
EET 221 Synchronous Machines Rafiqi.
Chapter 2 Transformers Edit by Chi-Shan Yu Electric Machinery.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Optimal Power Flow- Basic Requirements For Real Life.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
Introduction  Utilities transmit electricity over power lines into home as an alternating current (AC) wave.  This is how power travels through wiring.
Submitted to: Submitted by:
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Optimal Power Flow- Basic Requirements For Real Life Their Problems And Solutions.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Submitted To:- Submitted By:- Mr.
ENE 490 Applied Communication Systems
BASIC ELECTRICAL TECHNOLOGY DET 211/3
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
Control Engineering. Introduction What we will discuss in this introduction: – What is control engineering? – What are the main types of control systems?
البحث السابع بحث منفرد منشور فى مؤتمر دولى متخصص (منشورة التحكيم علي البحث الكامل) Adel A. Elbaset 13th International Middle East Power System Conference,
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
Stray field measurement during power transformer energization Miroslav Novák Faculty of Mechatronics, Informatics and Interdisciplinary Studies Technical.
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Ch 4: Transmission Line Calculations
Power Electronics and Control in Wind Energy Conversion Systems
IG BASED WINDFARMS USING STATCOM
BRAZIL ANDERSON RICARDO JUSTO DE ARAÚJO (speaker) RODRIGO CLEBER DA SILVA SÉRGIO KUROKAWA JUNE 2015 Improving the Performance of the Lumped Parameters.
Module B4 Per Unit Analysis
Wind turbine technology
ELEC-E8409 HIGH VOLTAGE ENGINEERING
Transient Analysis of Shunt Reactor Switching on 500kV System
APPLICATIONS Reference: Textbook-Chapter 6,8 & 9 'Power Electronics',C
POWER SYSTEM ANALYSIS INTRODUCTION.
Advanced Power Systems
Design of Electric Power Systems and Utilities
Protective Relaying Conference
Exercise 8 Power systems.
Exercise 8 Power systems.
Generator Equations Galore
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Prepared by: Ismael K. Saeed
Summary of Material on Electric Drives Covered on July 24, 2019
National Institute of Wind Energy(NIWE)
Presentation transcript:

Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY OF KOŠICE FACULTY OF ELECTRIC ENGINEERING AND INFORMATICS Department of Electric Power Engineering

Contents Theoretical problems of reconnection of decentralized electric sources in power system Choosing of suitable model of power system for reconnection of decentralized sources Simulations of chosen electric sources in power system model in EMTP-ATP Conclusion

Problems of Reconnection of Decentralized Power Energy Sources to Distribution Grid Problems of reconnections of wind power plant: convention sources must be „on“ and prepared, in the case of wind power plants outage; dependence on actual meteorological situation; relatively small power of wind power plants; they are not possible to operate when the wind velocity is above 30 m/s or below 3 m/s. Problems of reconnections of solar power plants: convention sources must be „on“ and prepared, in the case of solar power plants outage; problems with the season variations of sunlight (in December is 7-times weaker than in July); difference between night and day is very significant Problems of reconnections of water power plants: they generate electric power only when the water flow is in allowable range;

Review of present possibilities of computer simulation of power system at our department MATLAB/SIMULINK EUROSTAG PSLF EMTP-ATP...

EMTP ATP (Electromagnetic Transient Program) Generally, there is possible to model the power system network of 250 nodes, 300 linear branches, 40 switchers, 50 sources,... Circuits can be assembled from various electric component of power system: Components with the lumped parameters R,L,C; Components with the mutual coupling (transformers, overhead lines,...); Morephase transmission lines with lumped or distributed parameters, that can be frequency-dependent; Nonlinear components R, L, C; Switchers with variable switching conditions, that are determined for simulation of protection relays, spark gaps, diodes, thyristors and other changes of net connection; Voltage and current sources of various frequencies. Besides of standard mathematical functions, there is possible to define also sources as function of time;

Model of three-phase synchronous engine with rotor, exciting winding, damping winding; Models of universal motor for simulation of three-phase induction motor, one-phase alternating motor and direct current motor; Components of controlling system and sense points. This program EMTP ATP is not only computational. Because of better representation of results and simplifying of inputting data, this program has spread with another sub- programs as follows: ATPDraw – graphical preprocessor; PCPLot, PlotXY, GTPPLot – graphical exporting of ATP; Programmer‘s File Editor (PFE) – text editor for creating and editing of output files; ATP Control Center – program that concentrate all controlling sub-programs into one general controlling window. EMTP ATP (Electromagnetic Transient Program)

Scheme of electric power network for simulations

Scheme of electric power network for simulations in EMTP-ATP

Parameters of power system Parameters setting of sources of power system

Parameters of power system Parameters setting of overhead lines of power system

Parameters of power system Parameters setting of transformers of power system

Sources reconnection There were reconnected various sources in different locations of power system First source was connected from the beginning of simulation, the second one was connected in 0,5 s and the third one in 1 s All parameters of components in power system were inserted as card data of given components Consequently, there were changed voltages and powers of connected sources The measured data (voltages, currents,...) were recorded and evaluated in various nodes of network The maximal possible connected power were calculated and tested with permitted difference of voltages (quality of voltages must agree with conditions of ± 2 % from nominal voltage in grid) The result were evaluated for phase L1 (A), because the loads were almost symmetrical

Simulation of reconnection of two sources with the same values and the maximal voltage of 326 V Sources reconnection

Voltage arising with sequential sources reconnecting Sources reconnection

Simulation of reconnection of two sources with the same values and the maximal voltage of 400 V Sources reconnection

Voltage deviation in the node, closest to third source Sources reconnection

Voltage deviation in the node, closest to the third source (detail) Sources reconnection

Simulation of reconnection of two sources with the same values and the maximal voltage of 385 V Sources reconnection

Simulation of reconnection of two sources with the various parameters and the maximal voltage of 391 V (2nd source) and 333 V (3rd source) Sources reconnection

Power of first source, when it operates alone (0-0,5 s), with the second one (0,5-1 s) and consequently with third one (1-2 s) Sources reconnection

Power of second source, when it operates with first one (0-0,5 s), and with the third one (1-2 s) Sources reconnection

Power of third source, when it operates with first and third one (1-2 s) Sources reconnection

Maximal voltages, that are possible to reach with the respecting of ± 2 % voltage variation in every node: Source 1: U m1 = V Source 2: U m2 = 391 V Source 3: U m3 = 333 V Maximal immediate power measured in the closest distances from the sources: Power of source 1 (single) = 2,2643 MW Power of sources = 3,5280 MW = 2,2541 MW + 1,2739 MW Power of sources = 3,5653 MW = 2,1458 MW + 1,2621 MW + 0,1574 MW Sources reconnection

Simulations of transient phenomena Complemented scheme for simulation of transient phenomena M1,M2,M3 – places of failure event; measuring places Simulated transient phenomena: short-circuits load (branch) disconnection phase interruption atmospheric overvoltage

Three-phase short circuit – overvoltage after short circuit elimination Voltage characteristics before short-circuit creation in location M1, during short circuit and after short circuit, measured in location M1

Three-phase short circuit – measured results Measured place Location M1Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M ,5 M24, ,5 M38, ,453 Measured place Location M2Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M1-4, ,5 M ,9 M34, ,373 Measured place Location M3 Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km] U [V] U [V] i p [A] M17, ,3 M24, ,2 M ,8

Two-phase short circuit – overvoltage after short circuit elimination Voltage characteristics before short-circuit creation in location M1, during short circuit and after short circuit, measured in location M1

Two-phase short circuit – measured results Measured place Location M1Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M ,3 M24, ,08 M38, ,822 Measured place Location M2Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M1-4, ,6 M ,5 M34, ,975 Measured place Location M3Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M17, ,2 M24, M

One-phase short circuit – overvoltage after short circuit elimination Voltage characteristics before short-circuit creation in location M1, during short circuit and after short circuit, measured in location M1

One-phase short circuit – measured results Measured place Location M1Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M ,5 M24, ,81 M38, ,45 Measured place Location M2Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M1-4, ,7 M ,3 M34, ,43 Measured place Location M3Steady stateOvervoltage after shot-ciruit interuption Peak current during short-circuit Mutual distances [km]U [V] U [V] i p [A] M17, ,5 M24, ,2 M ,2

Phase interruption Voltage characteristics during phase interruption in location M1, measured in location M2

Voltage characteristics during phase interruption in location M1, measured in location M3 Phase interruption

Load disconnection Voltage characteristics after disconnection of branch AFA, measured in location M1

Current characteristics after disconnection of branch AFA, measured in location M1 Load disconnection

Atmospheric overvoltage During the direct lightning strike to overhead line pole (HV), it is considered line impedance Z 0 = Ω and lightning current of I = 20 kA, then the theoretical peak voltage magnitude of overvoltage wave is in the range 3-5 MV. HH

Atmospheric overvoltage Simulation of direct lightning strike to bus bar 22kV in location M1

Atmospheric overvoltage – measured results Measured place Location of failure M1Steady stateOvervoltage Mutual distances [km] U [V] U [MV] M ,304 M24, ,96 M38, ,83 Location of failure M2 M1-4, ,65 M ,01 M34, ,28 Location of failure M3 M17, ,28 M24, ,23 M ,43

Conclusion using of EMTP-ATP it is possible to relatively quickly consider connectivity of new power source (voltage change, short-circuit ratio, overvoltage,...); there were confirmed theoretical assumptions that the most important points with the highest quantity change are the closest branches to connection node, i.e.: - the highest increasing of voltage magnitude is in the node of source connection, - the highest increasing of short-circuit current is in the node of source connection, if there were connected 3 sources, the voltage in the power system was increased to permitted maximum voltage, and then it is possible to connect another load to the grid without significant complications, the similar procedure can be used for various small power systems

Thank you for your attention