1 3. Process Flow Measures Three Sequential Operations; One Oven Operation AOperation BOperation C You Oven Friend 15 Time (minutes) Capacity (per hour)

Slides:



Advertisements
Similar presentations
Process Capacity.
Advertisements

OPSM 301 Operations Management
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
 1  Outline  Chapter 3: Guided Tour Through Arena  Chapter 4: Modeling Basic Operations and Inputs.
Service Models Example Server has 50 movies, 100 min. each Request rate: 1 movie/min Max. capacity: 20 streams Random Access Model –Case 1: after 20 movies,
Divide. Evaluate power – 3 = – 3 EXAMPLE – 3 = 3 2 – – 3 = 6 – 3 Multiply. Evaluate expressions Multiply and divide from.
T h e G a s L a w s. T H E G A S L A W S z B o y l e ‘ s L a w z D a l t o n ‘ s L a w z C h a r l e s ‘ L a w z T h e C o m b i n e d G a s L a w z B.
Slide 1 Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted.
Flow Time Problems Set 2 This is indeed Christine Cookies modified in MBPF 2 nd Edition.
Wash, mix, spoon BakeCoolPackAccept Payment min per dozen. 7.5 dozen per hour 10 min per dozen 6 dozen per hour 5 min per dozen 12 dozen per hour.
Operations Management
Solving Rational Equations
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
10 minute Activity Be ready to report back in ten minutes.
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
Kristen’s Cookies.
Operating Processes process  A process is a set of tasks to be performed in a defined sequence  A process uses inputs to create outputs that are of value.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
 $10.65 x 40 = $  $ x 50 = $21,
Consumer Math Practice Test
Managing Processes and Capabilities CHAPTER THREE.
A case on Flowtime, Batching and Costs
Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Assembly Line Balancing
Network Flow. Network flow formulation A network G = (V, E). Capacity c(u, v)  0 for edge (u, v). Assume c(u, v) = 0 if (u, v)  E. Source s and sink.
Flow Rate and Capacity Analysis
Pipelining (I). Pipelining Example  Laundry Example  Four students have one load of clothes each to wash, dry, fold, and put away  Washer takes 30.
Writing Expressions.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order TFT = = 26 Problem 4.2: Part (a)
& 6.855J & ESD.78J Algorithm Visualization The Ford-Fulkerson Augmenting Path Algorithm for the Maximum Flow Problem.
The Ford-Fulkerson Augmenting Path Algorithm for the Maximum Flow Problem Thanks to Jim Orlin & MIT OCW.
Ch POD 1. A = M = Equations with variables on both sides Solve: 6x + 3 = 8x - 21 First we want to get x on one side…. 6x.
November 17, 2015 NC AWWA-WEA Annual conference
Pipelining Example Laundry Example: Three Stages
Simple Interest P = 500t = 6/12r =.06 Time must be measured in years. P = 8000r =.05t = 3 n = 4 n = 12 n = 365 A = Pe rt.
PYTHON PROGRAMMING Week 5 - Tuesday. THE FRIENDSHIP ALGORITHM Note the infinite loop!
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Problem 5.2: Flow unit = 1 order of 1 dozen. The unit loads.
40 Minutes Left.
Time Remaining 20:00.
ADDITION USING PARTITIONING The following questions are multiple choice. When working out these questions mentally you must use the following method. e.g.
Parts of the Clock Click on the minute hand. Click on the clock’s face.
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Adding.
Pipelining.
Three Minute Timer Two Minute Timer One Minute Timer
Remember how we can use partitioning to help us to subtract?
Pipelining.
Operations Management
Process and Capacity Analysis Capacity Analysis Tutorial
Serial versus Pipelined Execution
“The Raven” Scavenger Hunt
Network Flows – Multiple sources and sinks
Rational Expressions and Equations
Problem 8.3 John Doe has promised a total service time of 20 minutes. Processing time at the oven = 15 min Preparation = 2 min At most 3 minutes waiting.
60 MINUTES REMAINING.
and 6.855J Flow Decomposition
ECE 545 Remaining Tasks.
Assignment Capacity The recorded solution to the first problem is available at
Solving for x and y when you have two equations
7. Edmonds-karp Demo.
Problem 4.2: Part (a) TFT = = 26 Take order wash mix
Capacity validation, renominations and within-day capacity purchase
7. Dinic Algorithm 5/15/2019 Copyright 2000, Kevin Wayne.
Why do individuals, organizations, and nations trade?
2 Hours Minutes Seconds Insert Text Here.
= 4 = 2 Task 2: Shapes for numbers Build-up part 1
2 Hours Minutes Seconds Insert Text Here.
Presentation transcript:

1 3. Process Flow Measures Three Sequential Operations; One Oven Operation AOperation BOperation C You Oven Friend 15 Time (minutes) Capacity (per hour) 205 =60/15 = 4 =60/20 = 3 =60/5 = 12 Throughput Time = 40 Process Capacity = 3 You also need to subtract 40 minutes from your overall available time because it takes you 40 minutes to produce the first unit. Therefore id you have 4×60 minutes. It will take 40 minutes to produce 1, and then in the remaining time which is = 200 you will produce 1 unit per 20 minuts, i.e. 3 units per hour. And a total capacity of 1+1+3*3= 11 per 4 hours

2 3. Process Flow Measures Two Ovens Operation AOperation BOperation C You Oven Friend 15 Time (minutes) Capacity (per hour) 205 =60/15 = 4 = 2×60/20 = 6 =60/5 = 12 Throughput Time = 40 Process Capacity = 4

3 3. Process Flow Measures Two Ovens Plus Cross Functional Workers Operation AOperation BOperation C Human Oven Human 15 Time (minutes) 205 Resource Human Oven Time Capacity 2*60/20 =6120/20 =6

4 3. Process Flow Measures Flow Time; Parallel Tasks A B C D TT = = 9 A B C D TT = 2+(max(2,4))+1 = 7 M1H1 H2M2 H1 H2 M2 M1 Capacity M1 =30, H1=30, H2=15, M2=60

5 3. Process Flow Measures Christine, Roommate, Mixer, and Oven ResourceChristine RoomateMixerOven Time84610 Capacity60/8 =7.560/4=1560/6=1060/10 = 6

6 3. Process Flow Measures Two Ovens ResourceChristine RoomateMixerOven Time84610 Capacity60/8 =7.560/4=1560/6=10120/10 =12

7 3. Process Flow Measures Cross Functional Workers ResourceHuman MixerOven Time Capacity120/12 =1060/6=10120/10 =12

8 3. Process Flow Measures Parallel Operations A B C D TT = 2+(max(2,4))+1 = 7 H H M2 M1 Capacity A =30, B=30, C=15, D=60

9 3. Process Flow Measures Partitioning the Task to do it In Paralell A B C1 D TT = 2+(max(3,3))+1 = 6 H H M2 M1 Capacity A =30, B=20, C=20, D=60 C2 1 H