AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)

Slides:



Advertisements
Similar presentations
Super visor: Eng. Husain Abu Zant Dr.Bassam Odeh Value Engineering Management Mohammad Khader Sultan Radwan Yassar Abu Baker Ramzi Ashour Tamer suliman.
Advertisements

COST EFFECTIVE SOFTWARES IN ENGINEERING
RESEARCH PROPOSAL DR.URJA MANKAD.
1 Sikandar Iqbal Graduate Trainee Engineer Civil Engineering Township Comparison & Analysis of Township Buildings.
Civil engineering department Graduation project (part 1)
Outlines:-Outlines:- Environmental Design. Architectural Design Modifications. Structural Design Quantity compare Lighting and Mechanical Design.
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Measuring Masonry Work
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Specification & Quantities Estimating
King Fahd University of Petroleum & Minerals
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
 The assigned project is student’s schools which located in YABED; it was designed by Tubealh offices of the engineering design.  The contractor by.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
An-Najah National University Faculty of Engineering Civil Engineering Department.
Project Management An Introduction to Project Management Supervisor :eng. Baraq Juma’a Prepared by: Khaled Mohammad Sawalha Suha Tarek Awwad
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
Basics and Principles of Scientific Research By Ass. Prof. Dr. Majid S. Naghmash Diglah University College Department of Computer Engineering Techniques.
The four basic types of structures are :
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Jordan suggested list of occupations / Construction Sector As of a request from ETF, Jordan technical team has built the list of proposed occupations to.
Introduction to Elevations
Eng. Abdulhakeem Juhari
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
An-Najah National University
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Measuring Palestinian Labors Productivity
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
{Beir Ziet Secondary Boys School }
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Table (3.1)- the averages of the 10 models costs
Design of shallow foundations for optical and nursing faculty
RIBA Plan of Work 2013.
Construction Project Management
Graduation Project (II): Operations Improvement at Mhanna Factory
(Additional materials)
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
Under supervision of: Eng. Reema Nassar
SEISMIC ANALYSIS AND DESIGN OF AN APARTMENT BUILDING WITH SHEAR WALLS
Construction Project Management
Introduction to Elevations
Awarding Criterion for late tender: the lowest bid- why?
Graduation Project – 2 Mini-Mall
Value Management.
Building Construction I Sofia Sebastian 1
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
An - Najah national university Civil engineering department
" multifunctional building design"
Faculty of Engineering Civil Engineering Department
Supervisor: Eng. Mohammad abu neama
6th. Semester Schedule: 1st. Week
Engineering Projects management
An-Najah National University Faculty Of Engineering civil Department
RIBA Plan of Work 2013.
“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.
Muskat Secondary School Project
Presentation transcript:

AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering) By: Raya Abu- Ra’ed Lama Thawabeh Sabrin Salem. Supervisor: Eng. Hussein Abu Znt

CASE STUDY (MANAGEMENT OF TILL SCHOOL CONSTRUCTION) The project is “Till School” in Till village, near Nablus. It is a multi story building of two stories, the area of each story equal 655 M2, with the additional area of a roof and canteen of an area equal to 27 M2 and 40 M2 respectively. Main idea of research: The research described how project management principles and techniques apply to the real world challenges. These techniques were used to MINIMIZE THE COST USING MANY ENGINEERING CONCEPTS.

THE SENARIO  This research is mainly done to manage the financial side in the project which is (Minimizing the Cost to the specified and agreed level). A detailed cost study according to the inquired bill of quantity from the owner side Owner Engineering Consultants Cost analysis was made Owner The overall project price is so much higher than the budget specified by the owner for the project completion Manage this increment in the project price so that it fits the specified budget, within the specified duration. Engineering Consultants

Original project price according to the original BOQ submitted from the owner = $ 774,000 Donner / Budget of the project = $ 710,000 Amount needed to be reduced= $ 64,000

METHODOLOGY Engineering aspects used in such case to reduce the overall project cost:  Value engineering.  Cost analysis for the structural elements and other elements.  detailed quantity surveying.  Re-design the main structural elements.  Reduction for not necessary areas.

Value engineering  Value engineering definition: Value =  How to increase the Value? 1) By improving the performance. Value = 2)By decreasing the cost. Value =

Implementation of value engineering Following is an example of a reliable alternative used, that added a value to the project (by reducing the cost):  Building stone: Two alternatives were suggested, but one was used: 1)The artificial building stone 2) The effaced face natural building stone Original stone price = Effaced face price = $5.5/M Saved amount =$ 8900 $ 7/M$ $ 64000

Implementation of value engineering other items to which value engineering concept was successfully applied:  Tiles.  Steel doors.  aluminum windows.

Quantity Surveying It was mentioned in the contract that the listed structural quantities are not accurately measured for competitive purposes, so quantity surveying was done to the main structural elements and it was found that the accurate quantities are less than the specified in the original BOQ.  Plaster works: Original mentioned quantity (M2): New quantity (M2):  Concrete : Original quantity (M3): New calculated quantity (M3): 6560 M M2 Saved amount= $ M M3 Saved amount= $ $ $ $ $

Re-Design  Drop beams: Total saved amount resulted from Re-Design = $ 3100 Summary table for steel and concrete cost for re-designed drop beams. Item Original design Re-design steel =57730 NIS54550 NIS concrete =109 M 3 95 M 3.

Area Reduction Eliminating the store: after study, the canteen store was eliminated Because there is adequate number of stores inside the building. Savings due to the reduction in the canteen area. ItemReduced quantitySaved price Plaster58.5 M2$ 290 Tiles13.5 M2$ 308 Emulsion paint45 M2$ 247 Oil paint45 M2$ 405 Policed paint13.5 M 2 $ 35 Ground slab20 M2$ 550 Solid slab14 M2$ 784 columns1 M3$ 405 Stone walls12 M2$ cm block wall13.5 M2$ 221 footings1 M3$ 1517 Wooden door1 unit$ 288 1*36 watt fluorescent lamp 1 unit$32 Socket outlet1 unit$ 28 Total saved amount from reduction of the canteen area = $ 6100

Schedule  The specified duration for completion of this project is 8 months.  According to primavera project planner results, it’s found that the time was not critical to implement the project.  Result: No Cost increment due to the specified project duration.

Conclusion The following table summarizes the previous results: MethodAmount saved (USD) % of the total saved amount Value Engineering35,10054 % Quantity surveying20, % Re-design31005 % Area reduction6, % Total saved amount: (USD) 65, %

Recommendations  It is slightly recommended to search more about the application of the Value Engineering in the Engineering world.

Thanks For attention Ready to answer any Question