Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.

Slides:



Advertisements
Similar presentations
MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Advertisements

Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Focus Coil Quench Detector
Nb3Sn QPS strategies How to protect.
Other arguments to train two sectors to 7 TeV
Presentation transcript:

Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL TopicsTopics Summary of initial magnet training Summary of initial magnet training Burned out HTS lead Burned out HTS lead Second series of magnet training Second series of magnet training Schedule Schedule Summary of initial magnet training Summary of initial magnet training Burned out HTS lead Burned out HTS lead Second series of magnet training Second series of magnet training Schedule Schedule

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL Initial Magnet Training First magnet cooldown completed on 5/25/12 First magnet cooldown completed on 5/25/12 Excess cooling capacity found to be >3 W Excess cooling capacity found to be >3 W Start of training delayed by helium shortage Start of training delayed by helium shortage LHe issue solved with help from Fermilab LHe issue solved with help from Fermilab Seven training runs were carried out between 6/13/12 and 7/3/12 Seven training runs were carried out between 6/13/12 and 7/3/12 Quench currents ranged from 185 A in all coils to 185 A in M1 and 245 A in M2 and E1/C/E2 Quench currents ranged from 185 A in all coils to 185 A in M1 and 245 A in M2 and E1/C/E2 Frequency of runs largely dictated by LHe supply Frequency of runs largely dictated by LHe supply First magnet cooldown completed on 5/25/12 First magnet cooldown completed on 5/25/12 Excess cooling capacity found to be >3 W Excess cooling capacity found to be >3 W Start of training delayed by helium shortage Start of training delayed by helium shortage LHe issue solved with help from Fermilab LHe issue solved with help from Fermilab Seven training runs were carried out between 6/13/12 and 7/3/12 Seven training runs were carried out between 6/13/12 and 7/3/12 Quench currents ranged from 185 A in all coils to 185 A in M1 and 245 A in M2 and E1/C/E2 Quench currents ranged from 185 A in all coils to 185 A in M1 and 245 A in M2 and E1/C/E2 Frequency of runs largely dictated by LHe supply Frequency of runs largely dictated by LHe supply

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL Magnet Training (cont’d) Numerous issues have arisen during the training that delayed progress but, for the most part, have been solved Numerous issues have arisen during the training that delayed progress but, for the most part, have been solved These include: LHe supply, level gauges wiring problem, cold mass leaks to atmosphere, inadvertent quench triggered by QP system, circuit breaker trips, power supply stability These include: LHe supply, level gauges wiring problem, cold mass leaks to atmosphere, inadvertent quench triggered by QP system, circuit breaker trips, power supply stability The most severe problem was a burnout of one of the six high-current HTS leads The most severe problem was a burnout of one of the six high-current HTS leads Numerous issues have arisen during the training that delayed progress but, for the most part, have been solved Numerous issues have arisen during the training that delayed progress but, for the most part, have been solved These include: LHe supply, level gauges wiring problem, cold mass leaks to atmosphere, inadvertent quench triggered by QP system, circuit breaker trips, power supply stability These include: LHe supply, level gauges wiring problem, cold mass leaks to atmosphere, inadvertent quench triggered by QP system, circuit breaker trips, power supply stability The most severe problem was a burnout of one of the six high-current HTS leads The most severe problem was a burnout of one of the six high-current HTS leads

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL HTS Lead Burnout During the 7/3/12 training run, it was discovered that the ‘E’ HTS lead connected to one of the end coils had burned out During the 7/3/12 training run, it was discovered that the ‘E’ HTS lead connected to one of the end coils had burned out Subsequent review of the test data revealed that the lead had exhibited a constant resistance of ~100  during all of the recent training runs Subsequent review of the test data revealed that the lead had exhibited a constant resistance of ~100  during all of the recent training runs The voltage across the lead had never reached a level sufficient to trip the quench system until it spiked above the 100 mV threshold at 245 A The voltage across the lead had never reached a level sufficient to trip the quench system until it spiked above the 100 mV threshold at 245 A The quenched lead burned out before the system could sufficiently reduce the magnet current The quenched lead burned out before the system could sufficiently reduce the magnet current During the 7/3/12 training run, it was discovered that the ‘E’ HTS lead connected to one of the end coils had burned out During the 7/3/12 training run, it was discovered that the ‘E’ HTS lead connected to one of the end coils had burned out Subsequent review of the test data revealed that the lead had exhibited a constant resistance of ~100  during all of the recent training runs Subsequent review of the test data revealed that the lead had exhibited a constant resistance of ~100  during all of the recent training runs The voltage across the lead had never reached a level sufficient to trip the quench system until it spiked above the 100 mV threshold at 245 A The voltage across the lead had never reached a level sufficient to trip the quench system until it spiked above the 100 mV threshold at 245 A The quenched lead burned out before the system could sufficiently reduce the magnet current The quenched lead burned out before the system could sufficiently reduce the magnet current

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL HTS Lead Burnout Top: recently failed lead; middle: previously failed lead; bottom: new lead

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL HTS Lead Resistances HTS lead resistances measured over numerous training cycles Failed Lead New Lead 10x better, but worrisome In the noise

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL 2 nd Series of Training Runs The magnet was warmed up in order to replace the failed lead thru an access port The magnet was warmed up in order to replace the failed lead thru an access port Pumpout of the insulating vacuum and cooldown completed 8/9/12 Pumpout of the insulating vacuum and cooldown completed 8/9/12 Four training quenches carried out so far: Four training quenches carried out so far: M1=110 A, M2=134A, E1/C/E2=135A M1=110 A, M2=134A, E1/C/E2=135A M1=132 A, M2=163A, E1/C/E2=161A M1=132 A, M2=163A, E1/C/E2=161A M1=141 A, M2=168A, E1/C/E2=169A M1=141 A, M2=168A, E1/C/E2=169A M1=144 A, M2=174A, E1/C/E2=174A M1=144 A, M2=174A, E1/C/E2=174A Another training run to be carried out today Another training run to be carried out today The magnet was warmed up in order to replace the failed lead thru an access port The magnet was warmed up in order to replace the failed lead thru an access port Pumpout of the insulating vacuum and cooldown completed 8/9/12 Pumpout of the insulating vacuum and cooldown completed 8/9/12 Four training quenches carried out so far: Four training quenches carried out so far: M1=110 A, M2=134A, E1/C/E2=135A M1=110 A, M2=134A, E1/C/E2=135A M1=132 A, M2=163A, E1/C/E2=161A M1=132 A, M2=163A, E1/C/E2=161A M1=141 A, M2=168A, E1/C/E2=169A M1=141 A, M2=168A, E1/C/E2=169A M1=144 A, M2=174A, E1/C/E2=174A M1=144 A, M2=174A, E1/C/E2=174A Another training run to be carried out today Another training run to be carried out today

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL 2 nd Series of Training Runs The reason for the lower current quenches is not known The reason for the lower current quenches is not known Our analysis of the data suggests that these are normal training quenches that are similar in nature to the previous series Our analysis of the data suggests that these are normal training quenches that are similar in nature to the previous series The fast DAQ/QP system appears to be functioning normally, and the power supplies are stable (in manual mode) The fast DAQ/QP system appears to be functioning normally, and the power supplies are stable (in manual mode) The reason for the lower current quenches is not known The reason for the lower current quenches is not known Our analysis of the data suggests that these are normal training quenches that are similar in nature to the previous series Our analysis of the data suggests that these are normal training quenches that are similar in nature to the previous series The fast DAQ/QP system appears to be functioning normally, and the power supplies are stable (in manual mode) The fast DAQ/QP system appears to be functioning normally, and the power supplies are stable (in manual mode)

LBNL MICE VC August Spectrometer Solenoid Update  Steve Virostek  LBNL ScheduleSchedule The schedule is a bit uncertain due to the unpredictability of the training The schedule is a bit uncertain due to the unpredictability of the training Once the training and warmup are complete, the support feet need to be welded on and the magnet prepared for shipping Once the training and warmup are complete, the support feet need to be welded on and the magnet prepared for shipping LBNL on site technical manpower has been limited in recent weeks due to budget issues LBNL on site technical manpower has been limited in recent weeks due to budget issues Progress on the second unit has been somewhat slowed as well Progress on the second unit has been somewhat slowed as well The schedule is a bit uncertain due to the unpredictability of the training The schedule is a bit uncertain due to the unpredictability of the training Once the training and warmup are complete, the support feet need to be welded on and the magnet prepared for shipping Once the training and warmup are complete, the support feet need to be welded on and the magnet prepared for shipping LBNL on site technical manpower has been limited in recent weeks due to budget issues LBNL on site technical manpower has been limited in recent weeks due to budget issues Progress on the second unit has been somewhat slowed as well Progress on the second unit has been somewhat slowed as well