GRP Service Riser Systems PULTRUDED STRUCTURAL PROFILE SUPPORTS WITH GRP MOULDED ANTI SLIP GRATING FOR OPEN RISERS AND CUT OUTS FOR SERVICES.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

TX40 and CX40 feature presentation. Multi-functional solution Unique product features - enhanced applicability.
NGfL CYMRU GCaD FLOOR COVERINGS.
Safety in Motion Industrial Slip Control. First Aid is too late! You must act to prevent accidents before they happen.
Our FRP Product Ranges FRP Battery Stand FRP Cable Trays FRP Ladders
Turnstile Finish Options. Galvanized Finish Galvanization is a process of applying a protective zinc coating to steel or iron, in order to prevent rusting.
POLY BOX 128 FIFTH STREET WELKOM 9460 P.O BOX 1855 WELKOM 9460
Incorporating : Egmont Doors and totalDOORS | | ULTI-FLEX Group SPECIALIST ACCESS WAY SOLUTIONS.
is a mobile protective steel barrier in a modular design.
Above Ground Storage Tanks &
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Spacerack Storage Centre (Australia) Pty. Ltd. A.C.N Distributors of Spacerack Storage Systems Selective Pallet Racking The principle behind.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
LIGHT-DUTY BELT FASTENER SYSTEMS
MUNCHY THE CATERPILLAR PRODUCT RELEASE DOCUMENT TM.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Fall Protection.
Installation Guidelines. Items 1.Cutting Tools 2.Fixing Tools 3.Fixing Systems 4.Off-Shore cutting & installations 5.Previous Projects.
Welcome to Flexco ® Rivet Hinged HEAVY-DUTY FASTENER SYSTEMS.
Precast Products from USDC. About WideslabThe ProductLoad/ Span TablesJoinery DetailsContact Us Agenda.
INTERIOR WALL FINISHES
LADDER & STAIRWAY SAFETY
Safety for Working in High Places
AUZIE QUIC SLIP PTY LTD AQS METAL PRO – 001 INTERIOR AND EXTERIOR.
Pultruded Fiberglass Components. About Us  Established in 1976, Mihir Engineers Limited today is one of the largest manufacturers of FRP and RCC Cooling.
FRP Door and Frame System. FRP Door and Frame System What is FRP? Tie rod assembly Aluminum closer reinforcement (same for panic/lock reinforcement) Aluminum.
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
Fall Hazards.
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
Architectural acoustics Acoustical materials. Sound absorber: Reapor Expanded Glass Granulate  Description  The sound absorber for challenging environments.
©Teaching Resource in Design of Steel Structures IIT Madras, SERC Madras, Anna Univ., INSDAG 1 COMPOSITE FLOORS - II.
Wet Area Linings Part 3 – Flooring & Other Details M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
BOLD STEP® Safety Treads. BOLD STEP Safety Treads Permanent Solution Cover Damaged Concrete, (at fraction of the cost of cement repairs) Increases Step.
The collapse of the World Trade Center WTC – Structure Project
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
3D Panel Construction System
Composites Learning Intention: Show an understanding of the term composite Be aware of practical applications of some composites.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
COEN STEEL LEADING THE WAY IN GRATING SOLUTIONS FORGED WELDED GRATING | PRESSURE LOCKED GRATING | GRP | PERFORATED METAL PLANKS.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
QuickWalls® strong. fast. simple. *Light Weight *Insulated
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Precast Concrete Panel Group 6 Alex Cooper Yadir Avila Erjan Kadrakunov.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
Rubber Flooring Uk Circular Pattern Roll Out Flooring Rolls are Protects the floor from corrosives such as oil, salt, antifreeze and battery acid which.
Name: Parth Pandya, Nehal Patel Branch: Mechanical-A-1 (DS) Subject: Material Technology Roll no.: ,
Dual-Tower Lift Scaffold Nasif Arefin, Arshdeep Dhaliwal, Saheb Dhody, Dhruba Hasan, Kayla Musalem, Ziwei Wang, Maria Xirui Xie.
Flammable Liquids Directorate of Training and Education
TREADWELL™ Supplies One Stop Solutions in FRP Customization, Underfoot, Structural Profile and Cladding, Odour Control and Baffle Walling and Cable and.
This slide can be used as a background before the presentation begins.
BARRIAL EDGE PROTECTION SYSTEMS
HORSEMATTING-DIRECT.CO.UK Horsematting-direct.co.uk is part of a family run group of companies with over 50 years of experience in manufacturing and distribution.
PROJECT WORK PRESENTATION
Selection of materials or components
Brute Wall Building System™
Interior Finishes and Detailing
HEAVY-DUTY FASTENER SYSTEMS
The must-have features of covers used on gym floors.
Zinc Powder for Coating - Protective Primer on Metal Surfaces Zinc Powder For Coating.
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
NATIONAL SALES MEETING EXTERIOR LIGHTING PRESENTATION
FIBER REINFORCED CONCRETE
Subpart X Ladders and Stairways 29 CFR
The Original Insulated Concrete Form
Use of this presentation
Presentation transcript:

GRP Service Riser Systems PULTRUDED STRUCTURAL PROFILE SUPPORTS WITH GRP MOULDED ANTI SLIP GRATING FOR OPEN RISERS AND CUT OUTS FOR SERVICES

About the system A COMPLETELY BESPOKE SYSTEM FOR OFFERING COVERAGE FOR OPEN SERVICE RISERS THAT ARE IDEAL FOR NEW BUILD RISERS & REFURB RISERS. ALL PRODUCTS ARE CONSTRUCTED FROM FIBREGLASS (GRP) MATERIALS, THE LATEST MODERN MATERIALS WITH A LARGE NUMBER OF BENEFITS OVER TRADITIONAL MATERIALS.

Benefits of GRP System NON SPARKING THE GRP GRATING AND GRP STRUCTURAL SUPPORTS CAN BE CUT WITHOUT ANY HOT WORKS PERMIT REQUIRED EXCELLENT CHEMICAL AND CORROSION RESISTANCE WITHSTANDS THE MOST CORROSIVE CONDITIONS TO ENSURE SOLID STRUCTURAL INTEGRITY IN TOUGH ENVIRONMENTS UNMATCHED IMPACT RESISTANCE CAN WITHSTAND MAJOR IMPACTS WITH LITTLE STRUCTURAL DAMAGE AND NO FAILURE LIGHTWEIGHT LESS THAN ONE-HALF THE WEIGHT OF STEEL GRATING SLIP RESISTANT IMPROVES SAFETY, REDUCES SLIPS AND FALLS ELECTRICALLY AND THERMALLY NONCONDUCTIVE ELIMINATES ELECTRICAL/THERMAL HAZARDS LONG MAINTENANCE-FREE LIFE REQUIRES NO SCRAPING, SANDBLASTING OR PAINTING. CUTS LIFE CYCLE COSTS DRAMATICALLY CHOICE OF COLOURS ANY COLOURS AS AVAILABLE FIRE RETARDANT FLAME SPREAD RATING OF 25 OR LESS

Benefits of GRP System – In Detail NON SPARKING THE GRP GRATING AND GRP STRUCTURAL SUPPORTS CAN BE CUT WITHOUT ANY HOT WORKS PERMITS AS THEY DO NOT PROVIDE ANY SPARKS DUE TO THE FIBREGLASS MATERIALS. DURING CUTTING, NO AREAS NEED TO BE PROTECTED FROM OTHER TRADES - THIS IS DIFFERENT TO TRADITIONAL STEEL WORKS LIGHTWEIGHT NO SPECIALIST LIFTING EQUIPMENT IS REQUIRED AND MINIMAL STORAGE IS REQUIRED ON SITE - THIS IS DIFFERENT TO TRADITIONAL MATERIALS THAT REQUIRE SPECIALIST LIFTING EQUIPMENT SLIP RESISTANT AN ANTI SLIP AGGREGATE IS ADDED TO THE TOP LAYER OF THE OPEN MESH FLOORING THAT PROVIDES SLIP RESISTANCE – UNLIKE TRADITIONAL STEEL WHICH CAN BE SLIPPERY UNDERFOOT COLOUR CHOICES WHILST THERE ARE STANDARD STOCK COLOURS, ANY COLOUR GRATING CAN BE OFFERED AT NO ADDITIONAL COST OR MINIMUM QUANTITY, MEANING DIFFERENT RISER TYPES CAN BE DONE IN DIFFERENT COLOURS, FIRE – RED, MECHANICAL – BROWN ETC.– UNLIKE TRADITIONAL MATERIALS WHICH ARE OFFERED IN A SINGLE COLOUR OR IF THEY CAN BE PAINTED, IT LEADS TO REGULAR MAINTENANCE BEING REQUIRED FIRE RETARDANT AS STANDARD THE GRP GRATING AND PROFILES MEET BS476 PART 7 FOR CLASS 1 FLAME SPREAD RATING, A PHENOLIC RESIN SYSTEM CAN BE USED THAT IS AIMED AT MEETING CLASS 0 FLAME SPREAD – UNLIKE TRADITIONAL MATERIALS THE FIRE RETARDANCY OF GRP MATERIALS IS DONE DURING THE MANUFACTURING PROCESS

The installation process TYPICAL OPEN RISERS PRIOR TO ANY SERVICES, GRATING AND PROFILES INSTALLED

PULTRUDED SUPPORTS FIXED TO PERIMETER OF OPEN RISERS ATTACHED WITH CHEMICAL ANCHOR FIXINGS The installation process

DEPENDANT ON SPANS INVOLVED AND OR FIXING RESTRICTIONS, ADDITIONAL SUPPORTS CAN BE ADDED INCLUDING I BEAMS The installation process BB Scaffolding

Project Profile – South Bank Tower, Mace SIZE OF PROJECT APPROX. 700 M2 OF RISER OPENINGS COVERING APPROX. COVERING APPROX. 487 RISERS – TOTAL PROJECT VALUE: APPROX. £150K USING MATERIALS: GRP 38MM THICK OPEN MESH (32MM HOLES) STRUCTURAL GRATING 100X100X8MM PULTRUDED ANGLE, 120X70X8MM PULTRUDED I BEAM HILTI CHEMICAL ANCHORS S/S FIXING CLIP SYSTEM CORDEX PROTECTIVE SHEET

Project Profile – South Bank Tower, Mace PROJECT COSTINGS OVERALL APPROX. PER SQUARE METRES: 700 OVERALL COST: £150,000 COST PER M2 FOR GRP SYSTEM: £ ALL IN* * COST PER M2 IS FOR THIS PROJECT AND MAY INCREASE DEPENDANT ON VARIOUS SITE SPECIFICS

Project Profile – South Bank Tower, Mace FUTURE PROJECT OPTIONS RESIN SYSTEM GRATING CAN BE MADE USING A PHENOLIC RESIN SYSTEM, GIVING A POTENTIAL CLASS 0 FIRE RATING, GENERALLY DOUBLE THE COST OF CLASS 1 FIRE RATING (ADDITIONAL LEAD TIME 6-8 WEEKS FROM ORDER, NO MIN ORDER QUANTITY) PULTRUDED PROFILES CAN BE MADE USING A PHENOLIC RESIN SYSTEM, GIVING A POTENTIAL CLASS 0 FIRE RATING, GENERALLY DOUBLE THE COST OF CLASS 1 FIRE RATING (ADDITIONAL LEAD TIME 6-8 WEEKS FROM ORDER AND MIN ORDER 500 LINEAR METRES) TOP SURFACE FINISH STANDARD OPEN MESH GRATING IS 25MM OR 38MM THICK WITH 32MM HOLES (68% OPEN AREA) A MINI MESH GRATING IS AVAILABLE IN THE SAME THICKNESSES BUT WITH 14MM HOLES (40% OPEN AREA). WE ALSO OFFER A COVERED GRIT TOP GRATING WHICH BONDS (DURING THE MANUFACTURING PROCESS) A 3-4MM GRITTED SHEET TO THE TOP (0% OPEN AREA)