27-01-2012 INGV-CNIT-NOA-EO Project presented in the ambit of CIPS program SWING Short Wave critical Infrastructure Network based on new Generation of.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Application of the PROJECT CYCLE MANAGEMENT in Piedmont Region.
Critical Infrastructure Protection Policy Priorities Sara Pinheiro European Commission DG Home Affairs.
B. Zolesi *, Lj.R. Cander **, A. Belehaki ***, I.Tsagouri ***, M.Pezzopane * and S.Pau * Istituto Nazionale di Geofisica e Vulcanologia, Italy; ** Rutherford.
International Course on Development and Disasters with Special Focus on Health February 10 – 21, 2003: St Anns, Jamaica CDERA Experience in Institutional.
The SWING Project: status and closure of the project Bruno Zolesi. Istituto Nazionale di Geofisica e Vulcanologia.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
System’s generalities and structure of the final report Cesidio Bianchi. INGV.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
CIRAS PROJECT OVERVIEW
INGV-CNIT-NOA-EO Plenary meeting – First year activities Short Wave critical Infrastructure Network based on new Generation of high survival.
European Social Fund Evaluation in Italy Stefano Volpi Roma, 03 maggio 2011 Isfol Esf Evaluation Unit Human Resources Policies Evaluation Area Rome, Corso.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities Irene Fiorucci Cesidio Bianchi Istituto Nazionale.
Bruno Zolesi Istituto Nazionale di Geofisica e Vulcanologia The SWING Project: Headlines and Aims With the support of the Prevention,
DHS, National Cyber Security Division Overview
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Chapter 19: Network Management Business Data Communications, 4e.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
The Need for an Integrated View of Water Quality Modeling and Monitoring Bruce Kiselica USEPA, Region 2 Second Workshop on Advanced Technologies in Real.
INTERNET CRITICALITIES Activation and deactivation of the emergency back-up network Fabrizio Cuccoli, Francesco Sermi RaSS CNIT UO Firenze.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
DETERMINATION OF THE TOPOLOGY OF HIGH SURVIVAL HF RADIO COMMUNICATION NETWORK Andrea Abrardo.
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
An Integrated Methodological framework for Emergency Logistics - MELOGIC Dr Georgios Boustras Associate Professor in Risk Assessment Dean of the Ioannis.
The Quality Management System
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
Improving the performance of veterinary statutory bodies – experience with an OIE Veterinary Legislation Agreement Nicholas Kauta, OIE Delegate for Uganda,
06/12/ CYPADAPT “Development of a national strategy for adaptation to climate change adverse impacts in Cyprus “ Professor Maria Loizidou National.
Ministry of Education and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism Research within Priority.
Communications & Networks
Giandonato CAGGIANO ENISA MANAGEMENT BOARD REPRESENTATIVE LEGAL ADVISER ON EUROPEAN AFFAIRS OF THE MINISTRY OF COMMUNICATIONS U. OF ROMA TRE LAW FACULTY.
Zolesi B. 1, Belehaki A. 2, Tsagouri I. 2, Altadill D. 3, and Morelli M. 4 1 Istituto Nazionale di Geofisica e Vulcanologia, Rome, Italy, 2 National Observatory.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
The Preparatory Phase Proposal a first draft to be discussed.
Isdefe ISXXXX XX Your best ally Panel: Future scenarios for European critical infrastructures protection Carlos Martí Sempere. Essen.
Common framework Guidelines for Pilot Actions Debrecen 2013 Municipality of Debrecen Department of Sociology University of Debrecen External expert.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Status Report for Critical Infrastructure Protection Advisory Group
European Commission Introduction to the Community Programme for Employment and Social Solidarity PROGRESS
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
RECALL Resilient European Communities Against Local Landslides KICK OFF MEETING Projects selected under the 2014 Call for Proposals for Prevention & Preparedness.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Role of Technical Agencies Responsible for Hazard Assessment, Monitoring, Observations, Data and Analysis Dr. David Green National Oceanic and Atmospheric.
Threat Prevention and Detection (within Critical Infrastructures) under EU Data Protection Legislation– Purpose Specification and Limitation. Laurens Naudts.
DEFINE central topics: Critical infrastructures interdependencies Marcelo Masera Joint Research Centre DEFINE workshop November 2002, Pisa.
IDEA Improving Damage assessments to Enhance cost-benefit Analyses Call Identifier: Prevention 1. Actions on the economics of investing in disaster risk.
ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
French Port Cybersecurity Initiative
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
CIRAS FINAL CONFERENCE
Critical Infrastructure Protection Policy Priorities
Advanced systems for prevention & early detection of forest fires (ASPires) KICK OFF MEETING Call for proposals for prevention and preparedness project.
EU Reference Centres for Animal Welfare
Evaluation plans for programming period in Poland
Helene Skikos DG Education and Culture
iCoast integrated Coastal Alert System Kick off meeting
Noor Vergeer, Wojtek Kalocinski Border management and Schengen
Commission proposal for a new LIFE Regulation CGBN meeting
European Programme for Critical Infrastructure Protection (EPCIP)
Presentation transcript:

INGV-CNIT-NOA-EO Project presented in the ambit of CIPS program SWING Short Wave critical Infrastructure Network based on new Generation of high survival radio communication system With the support of the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme European Commission - Directorate-General Home Affairs

Acronyms CIPS – “Prevention, Preparedness and Consequence Management of Terrorism and other Security related Risks“ CNIT- Consorzio Nazionale Inter-universitario per le Telecomunicazioni ECIs - European Critical Infrastructures EO – Ebro Observatory CGAs - Controlling Governmental Agencies HF – High Frequency INGV – Istituto Nazionale di Geofisica e Vulcanologia NOA - National Observatory of Athens SW - Short Wave SWING - Short Wave critical Infrastructure Network based on new Generation of high survival radio communication system

SWING in pills SWING in pills The proposed project deals with the study and design of a system of HF radio connection among European Critical Infrastructure (ECIs) and/or Controlling Governmental Agencies (CGAs) that replace broad band transmission able to survive in any adverse conditions and terrorist attack. Starting date Duration- 24 Months Methodology- Share the activities in four Working Groups (WGs) where each WG is involved in the tasks of the project as better specified below. Partnership- INGV, CNIT, NOA, OE

SWING in pills Target groups- Agencies and institution devoted to management of Critical Infrastructures that are linked by internet network. Expected results- The project is finalized to demonstrate the feasibility of a network high survival HF communication as buck-up and independent system to ensure minimum management and communication requirements, in the case of internet failure due to a terrorist attack.

Revised budget Revised budget (about 54% of the initial request) Eligible costs ,02 € Grant approved from the CIPS Program: ,64 € Grant approved / total eligible costs (max 70%): 69,78 %

AMOUNT RECEIVED AMOUNT RECEIVED Grant requested FIRST RATA 60% OF THE GRANT INGV , ,20 CNIT , ,00 NOA , ,00 EO , ,00 I RATA € ( 60% of the requested Grant ,64 )

PARTNERS (CO-ORDINATOR AND CO-BENEFICIARIES) The Applicant/Organization is the Istituto Nazionale di Geofisica e Vulcanologia (INGV) Italy. The INGV’s staff is indicated as Working Group 1 (WG1) prevalently operating in Roma. Other Co-Beneficiaries are the three research institutes: -National Inter-University Consortium for Telecommunications (CNIT) Italy. CNIT’s staff is indicated as (WG2) prevalently operating in Pisa. -National Observatory of Athens (NOA) Greece. The NOA’s staff is indicated as (WG3) operates in Athens. -Ebro Observatory (EO) Spain. The EO’s staff is indicated as (WG4) operates in Roquetes. See chart of following figure that indicates the Applicant/Organization and the 4 WGs with the respective tasks.

SWING ORGANIZATION CHART

Why SWING The potential risk of wide scale terrorist attacks able to put out of order, for a long period, the internet connections capabilities exposes the European Critical Infrastructures (ECIs), like electric power distribution and production infrastructure, CGAs, safety and defense organization, water distribution agency, airports, etc. in a stage of vulnerability because of some essential information are transferred by means of internet both for management and control. The aim of SWING is to study a high survival HF radio network (data/voice) to real time support of ECIs communications, maintaining the minimum flux of essential information for the management and control in case of wide scale terrorist attacks able to render internet links useless over the Mediterranean region. This will increase the awareness of ECIs operators in the extreme case of the complete broadband failure of the communication.

1-Business Card The proposed project, deals with the study and design of a system of HF radio connections to link ECIs among themselves and with their CGAs. This system will replace broad band internet transmission when the latter fails. The HF network will withstand adverse conditions such as those encountered in case of a terrorist attack, guaranteeing the communication between ECIs and CGAs, and the transmission of necessary data for the survival and minimum operability of ECIs. SWING will be designed to evaluate the threat and increase the security awareness, as well as the level of protection, of analogous and/or interdependent ECIs.

2-Business Card In order to meet these goals and therefore CIPS priorities, SWING will have to recognize how and when the internet communication fails, and develop the standard software and hardware tools, necessary for implementing communication protocols, suited for a reliable and interoperable Short Wave radio network back up. Therefore, SWING must also analyze the HF network requirements necessary for alerting and controlling ECIs from their CGAs in case of threat or attack, understanding the particular characteristics and design a radio-communication architecture for a HF radio network.

3-Business Card To meet the above mentioned objectives the main activities will initially concern the designation of ECIs in the regions of interest and the analysis of potential communication problems among them and between ECIs and CGAs, followed by the identification of the most suitable topology for a high survival radio communication network. Subsequently, SWING will determine the criteria for early warning alerts, the procedures to activate the back up network, as well as the minimal amount of information necessary to maintain control over ECIs keeping them linked even in critical conditions. For what concerns the HF radio network, SWING will define and design the software and hardware necessary to a high survival HF radio network.

Objectives Objectives a- To study internet communications criticality. b- To analyse the requirements necessary to ECIs and CGAs management and control. c- To develop a communication protocols in order to define standard software and hardware tools supporting reliable and interoperable Short Wave radio communication techniques for ECIs and CGAs protection. d- To study the frequency management system taking into account the special characteristics of the ionospheric channel. e- To design a radio-communication architecture for a distributed South European short wave radio network.

ACTIVITIES-- BY WHOM AND--DELIVERABLES 1- Interface with EU authorities and coordination.INGV M1 - M24 Jan Dec 2013 Communications and Internal Report

ACTIVITIES-- BY WHOM AND--DELIVERABLES 2-Technical analysis of the communication problems related to the identification and designation of CIs in the interested area. INGV - CNIT M1 – M9 Sep 2012 Technical Report 3- Determination of the topology of high survival radio communication network. INGV - CNIT M1 – M9 Sep 2012 Technical Report 4- Characterization of the minimal amount of information necessary for the survival of the CIs communication. INGV - CNIT M10 – M13 Jan 2013 Technical Report 5- Operative supervision of the network architecture.INGV - CNIT M13 – M16 Jun 2013 Technical Report

ACTIVITIES-- BY WHOM AND--DELIVERABLES ACTIVITIES-- BY WHOM AND--DELIVERABLES 6-Analysis of the existing architecture of HF communication based on internet protocol access with reference to the above considered infrastructures. CNIT M1 – M6 Jun 2012 Technical Report 7-Analysis of existing HF connection system in terms of software and hardware for internet connection. CNIT M1 – M6 Jun 2012 Technical Report 8- Definition of the High survival HF radio network technical requirements. CNIT M1 – M6 Jun 2012 Technical Report 9 - Radio network system design.CNIT M9 – M12 Dec 2012 Technical Report 10-Criteria of early warning alert and procedures to activate the back up network. CNITM10 – M12 Dec 2012 Technical Report

ACTIVITIES-- BY WHOM AND--DELIVERABLES 11-Monthly prediction of the hourly HF set of frequencies over the n radio links given by the network, based on the available ionospheric model and methods. INGV, EO M13 – M16 Jun 2013 Technical Report 12-Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements. INGV, EO M13 – M16 Jun 2013 Technical Report 13-Ground wave propagation analysis when required.INGV M20 – M24 December 2013 Technical Report 14-Frequency management system for HF communication link optimization. INGV, EOM20 – M24 December 2013 Technical Report

ACTIVITIES-- BY WHOM AND--DELIVERABLES 15-Identification of the professional profile able to maintain and operate network. INGV,CNI T, NOA, EO M22 - M24 December 2013 Technical Report 16-Dissemination of deliverables within communities informing about initiatives organised in the context of the project. INGV,CNI T, NOA, EO M22 - M24 December 2013 Technical Report 17-Professional training activities through courses, workshops and conferences. INGV,CNI T, NOA, EO M22 - M24 December 2013 Technical Report 18-Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final recommendations for the EC. INGV,CNI T, NOA, EO M22 - M24 December 2013 Technical Report

ACTIVITIES-- BY WHOM AND--DELIVERABLES 19-Realization of a demonstrator constituted by 4- terminals HF network. INGV,CNITM1 - M24 December 2013 (Realization of the demonstrator)

Gantt’s diagram Gantt’s diagram Act. M1M2M3M4M5M6M7M8M9M10M11M12M13M14M15M16M17M18M19M20M21M22M23M24 1- xxxxxxxxxxxxxxxxxxxxxxxx 2- xxxxxxxxx 3- xxxxxxxxx 4- xxxx 5- xxxx 6- xxxxxx 7- xxxxxx 8- xxxxxx 9- xxxxxxxxxxxx 10- xxxx 11- xxxx 12- xxxx 13- xxxxx 14- xxxxx 15- xxx 16- xxx xxx 17- xxx xxx 18- xxx 19- xxxxxxxxxxxxxxxxxxxxxxxx

Example of 4-terminal HF network

HF network with central node

HF link

Adaptive connection Software defined radio is an adaptive radio technology that allows to adjust automatically to changing propagation conditions; To operate without operator assistance technique like Automatic Link Establishment (ALE) makes it possible ; Link Quality Analysis (LQA) that is a method of assessing channel quality, can be employed so that connections occur on the best channel/ frequency; Other automatic adaptive techniques are also available

Data transfer in HF link D ata transmission requires the use of modems to convert digital data into analog form, and viceversa; HF modems slow-speed FSK, high-speed parallel tone, or high- speed serial tone (Serial tone modems provide vastly improved data communications); FEC systems provide error correction without the need for a return link; Interleaving technique ; Automatic channel equalization and adaptive excision filtering.

Data protection Protection of the key is vital to securing the transmitted information encrypting the code by means of a key; Various degrees of security level depends on the algorithms and the number of variables in the key;. Other techniques like Low Probability of Detection (LPD) and Low Probability of Interception (LPI) can be considerated; Frequency-hopping in random way.

HF transmitting/receiving point

Mother board for software defined radio USRP N210 Kit P USRP N210 Kit P

TX Daughter boards for software defined radio

RX Daughter boards for software defined radio

500 W Power amplifier

Software defined radio (TX-terminal)

Software defined radio (RX-terminal)

Antenna system in Rome

Thanks for your attention