EGNOS Evolution Program Update D

Slides:



Advertisements
Similar presentations
GPS and EGNOS in the EUR-SAM CORRIDOR
Advertisements

ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Page 1 EGNOS added value in the regulated Tracking and Tracing Services for Livestock Transport EGNOS/Galileo services benefiting to regulated applications,
Legislative framework for the further implementation of EGNOS and Galileo Etelka BARSI-PATAKY MEP, EPP-ED Group.
- 1 - EPP-ED Public Hearing : 12 June 2008 The importance of GNSS (Galileo/EGNOS) Views from the forthcoming Council Presidency By Raymond ROSSO French.
1 Santiago Soley Pildo Executive Manager Latino Consortium Manager Prepared by Carine Saut - Latino Coordinator Galileo: a cooperation frame with Latin.
GALILEO and EGNOS Fotis Karamitsos, European Commission
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Flexible Airborne Architecture
ESA Iris Programme workplan of activities
ESA Iris Programme: status
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June IWG #25.
EGNOS: a satellite navigation system for Europe, and an opportunity for Africa! Michel Bosco Head, Galileo and EGNOS Applications and International Cooperation.
European GNSS Evolution Programme
Navigation solutions powered by Europe SUPPORT TO IWG25 12 th June 2013.
1 SDCM development program status 25 th meeting of Interoperability Working Group Sokos hotel Olympia Garden, St. Petersburg, Russia June 25, th.
The EGNOS System Architecture Status and Future Plans
EUM/OPS/VWG/11/0498 Issue GEONETCast EUMETSAT EO Portal Product Life Cycle Slide: 1.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
EGNOS Exploitation Program Status
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
Enterprise Architecture
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
© 2013 The MITRE Corporation. All rights reserved. SBAS IWG #25 Meeting St Petersburg, Russia June 2013 Roland Lejeune RTCA SC-159 Working Group.
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
GLONASS Government Policy, Status and Modernization
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
Galileo: programme status and research activities
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
European GNSS Programmes EGNOS and Galileo
© GMV, 2010 Propiedad de GMV Todos los derechos reservados EUROPEAN GNSS EGNOS AND GALILEO. CHARACTERISTICS AND ADVANTAGES OF BRUSSELS. OCTOBER 1 st, 2010.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
European GNSS for ITS: EGNOS contribution ITS WORLD CONGRESS 2011 Orlando– 18 October 2011.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
European Commission eContent Towards the Workprogramme.
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
2009/10/06 STUDY ON RECOGNITION OF PROFESSIONAL QUALIFICATIONS Alternative title slide.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
Satellite-based navigation system: a pan-African infrastructure for integration and economic development Stefano Scarda European Commission Africa-EU Infrastructure.
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
© 2014 The MITRE Corporation. All rights reserved. SBAS IWG #26 Meeting Delhi, India 5-7 February 2014 Roland Lejeune RTCA SC-159 Working Group 2 Summary.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
GPS Augmentation Services in Japan for the 8th IISC Europe at Prague December 2 - 3, 1999 by IISC CPoC in Japan Hiroshi Nishiguchi Japan GPS Council.
6th Framework Programme Thematic Priority 4 Aeronautics and Space Seminar on the new instruments of FP6 - afternoon session Satellite Communication in.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
1 Galileo / EGNOS Status GNSS Regional Plan Workshop July 12 th Casablanca Morocco Dr. Cedric Seynat Technical Department European GNSS Supervisory.
ESA UNCLASSIFIED – For Official Use FISO COLLOQUIUM, 18 June 2014 B. HUFENBACH ESA’S SPACE EXPLORATION STRATEGY.
COMPREHENSIVE SECURITY FRAMEWORK FOR COPERNICUS: FREE & OPEN DATA ACCESS TNC15 - Porto (Portugal), 17/06/2015 ESA EOP-G Network and Security team Barbara.
ESA Iris Programme: status
ESA Iris Programme workplan of activities
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
International Civil Aviation Organization
EGNOS Performance and Operational Implementation status
Signal Availability in the Polar Regions
EGNOS Ionosphere Related Activities S. Schlüter, R. Prieto-Cerdeira
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
SPACECRAFT OPERATIONS Paul Collins Head of Spacecraft Operations
Presentation transcript:

EGNOS Evolution Program Update D EGNOS Evolution Program Update D. Flament : Head of ESA EGNOS Division and Program manager IWG#26 – New Delhi, India, 5-7 Feb 2014 ESA UNCLASSIFIED – For Official Use

Presentation outline System Status Release Plan Current Industrial activities Com network migration in 2013 What is next ?

EGNOS Wide Area Network EGNOS Architecture GPS GEO Space Segment Ranging and Integrity Monitoring Stations RIMS1 RIMS2 RIMS … n NLES (two per GEO) Ground Segment EGNOS Wide Area Network MCC1 MCC2 MCC3 MCC4 SOU SPU Mission Control Centres Support Facilities CPF CCF

System Status & Release Plan

The real life of an operational system User Adoption Evolutions Maintenance & operations Lessons learned, best practices and Reform in US DoD Space acquisition program (GAO report 2007) after 2 decades of problems (cost, delays, etc..) Evolutionary development. “ .. incremental path toward meeting market and user needs rather than attempting to satisfy all needs in a single step. This provided program managers with more achievable requirements, which, in turn, facilitated shorter cycle times. ..” ESA UNCLASSIFIED – For Official Use

EGNOS V2 Release Plan

Status of RIMS Deployment Site Status as of December 2012 Remaining ESA activities Expected completion Agadir Qualified within V2.3.2 NA Tamanrasset site survey carried out Completion of site infrastructure and deployment of RIMS. Qualification. To be defined based upon EC decision Abu Simbel Haïfa Site survey performed Second survey carried out in October 2012 V2.4.2 ESA UNCLASSIFIED – For Official Use

EGNOS RIMS Network – Targeted network 41 RIMS sites

2013 – EC Delegation framework - Major Achievements System: QR of V2.3.2 in summer and deployment / start of operations in Oct Improvement in Performance & robustness to IONO .. CDR V2.4.1 M in summer Major step in obsolescence management Completion of TWAN G2 qualification, HO to ESSP, operational migration (see detailed slides after) First phase of V2.4.1 M AIV Sub-system: NLES G2 detailed design & development CCF G2 detailed design & development Support Facilities major evolutions development and qualification Communication network technology refresh Preparation of the new Industrial activities procurements for 2014/2017 Follow up of PROSBAS activity (EC funding) to support DFMC work plan (see dedicated presentation) ESA UNCLASSIFIED – For Official Use

Operational EGNOS APV-1 Availability V2.2 May 2011 V2.3.2 Jan 2014

Major Obsolescence management achievement in 2013: EGNOS Wide Area Communication Network Migration (G1 to G2) ESA UNCLASSIFIED – For Official Use

Requirements Programmatic context: Existing EGNOS Network Technology Obsolete with a deadline imposed by BT of early 2014 Necessity to migrate on time in order to avoid risk to service availability and/or considerable cost impacts Initial trade-off between approaches: Migrate with Notice to Users with a Service Interruption Migrate without Service Interruption (Continued Service) : Chosen Option Migration high level requirements: service at least as good as current service Migrate without Service Interruption (Continuous service) Migrate without risk on Integrity ESA UNCLASSIFIED – For Official Use

VPN1 to VPN2 Migration Before migration situation : RIMS attached to one MCC (FR before 2.3.1) MCC interconnected with IPLC. NLES connected through IPLC network. VSAT (C, Ku) partially redundant After migration situation : RIMS (MPLS) attached to ALL MCC. MCC interconnected with MPLS. NLES connected through MPLS. VSAT C band only fully redundant Full MPLS Network with added redundancy.

Original Situation. EGNOS Migrated to the new VPN. During migration : Deployment of a second MPLS network. Connection of each RIMS to the network (Raw data only). Independence of the networks (For safety reasons). Testing of EGNOS on the new network independently of EGNOS in operation. EGNOS Migrated to the new VPN.

Results : 10 days encompassing the operational migration executed by ESSP ESA UNCLASSIFIED – For Official Use

GEO Roadmap – Satellite view

EGNOS short / medium term plan Urgent procurements (2014-2017) WO1 (2.4.2 Phase B and pre-devpts) WO2(ASTRA 5B Integration and Qualification) WO3(Recurring RIMS (2)) PCIP6(Security analysis) PCIP7 (V2.4.2 Phase C/D)) Continue R&D (EGEP / H2020) Preparation of the CD Phase of EGNOS V3 Transition to new framework (Working arrangement with GSA)

Conclusion Major successes in 2013 (V2 Evolutions, V3 SRR, EGEP results) Ambitious program of work (on both V2 and V3) for next 8 years 2014 is the year to transition to new framework for 2014-2020 (GSA, new working arrangement) International momentum around SBAS still growing Cooperation between ESA & ASECNA has started (MOU for Ionospheric data collection & processing)

EGNOS Evolutions in the context of EGNOS Exploitation Program (GSA) 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 EGNOS V2 services (OS, SoL, EDAS) ; EU28, LPV200, and other extensions TBC (Ukraine..) Service Provision (GSA) New services preparation Second generation services Procurement & Implementation Infrastructure (ESA) V2.4.1P; V2.4.2 ; V2.5 (TBC) V3 Phase B2 V3 Phase C/D . . R&D System & techno (ESA) Test Beds; Techno Pre-Devpt, SBAS Infra R&T IWG, Eurocae, RTCA, ProSBAS SBAS L1/L5 ICD Validated MOPS IWG, SBAS L1/L5 / multi - const. Standardisation Avionics L1/L5 multi - const M OPS WAAS & other SBAS Phase III - LPV200 Tech. Ref. Phase III - LPV200 OPS Phase IV - LPV200 OPS SBAS L1/L5 GAGAN, SDCM, etc…………..