Confidential 1 DCPs in Forecasting Edward Kambour, Senior Scientist Roxy Cramer, Scientist.

Slides:



Advertisements
Similar presentations
Chapter 9. Time Series From Business Intelligence Book by Vercellis Lei Chen, for COMP
Advertisements

Decomposition Method.
Forecasting OPS 370.
4/16/ Ardavan Asef-Vaziri Variable of interest Time Series Analysis.
CmpE 104 SOFTWARE STATISTICAL TOOLS & METHODS MEASURING & ESTIMATING SOFTWARE SIZE AND RESOURCE & SCHEDULE ESTIMATING.
Copyright (c) 2004 Brooks/Cole, a division of Thomson Learning, Inc. Chapter 13 Nonlinear and Multiple Regression.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Time Series Analysis Autocorrelation Naive & Simple Averaging
Class 20: Chapter 12S: Tools Class Agenda –Answer questions about the exam News of Note –Elections Results—Time to come together –Giants prove that nice.
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Data Sources The most sophisticated forecasting model will fail if it is applied to unreliable data Data should be reliable and accurate Data should be.
Forecasting IME 451, Lecture 2. Laws of Forecasting 1.Forecasts are always wrong! 2.Detailed forecasts are worse than aggregate forecasts! Dell forecasts.
Chapter 3 Forecasting McGraw-Hill/Irwin
T T18-05 Trend Adjusted Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Trend Adjusted Exponential Smoothing"
Principles of Supply Chain Management: A Balanced Approach
Forecasting McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2013 John Wiley & Sons, Inc. Chapter 8 Supplement Forecasting.
1 Chapter 17: Introduction to Regression. 2 Introduction to Linear Regression The Pearson correlation measures the degree to which a set of data points.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
Demand Forecasts The three principles of all forecasting techniques: –Forecasting is always wrong –Every forecast should include an estimate of error –The.
Slides 13b: Time-Series Models; Measuring Forecast Error
Chapter 5 DEMAND FORECASTING Prepared by Mark A. Jacobs, PhD
Fall, 2012 EMBA 512 Demand Forecasting Boise State University 1 Demand Forecasting.
Standard Error of the Mean
Constant process Separate signal & noise Smooth the data: Backward smoother: At any give T, replace the observation yt by a combination of observations.
1 Demand Planning: Part 2 Collaboration requires shared information.
Chapter 2 Chapter 2 Forecasting McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
The Importance of Forecasting in POM
Linear Trend Lines Y t = b 0 + b 1 X t Where Y t is the dependent variable being forecasted X t is the independent variable being used to explain Y. In.
Lecture 12 Statistical Inference (Estimation) Point and Interval estimation By Aziza Munir.
3-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
DSc 3120 Generalized Modeling Techniques with Applications Part II. Forecasting.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Forecasting © The McGraw-Hill Companies, Inc., 2003 chapter 9.
Time Series Analysis and Forecasting
CHAPTER 5 DEMAND FORECASTING
Time series Decomposition Farideh Dehkordi-Vakil.
Time-Series Forecasting Overview Moving Averages Exponential Smoothing Seasonality.
1 Forecasting Formulas Symbols n Total number of periods, or number of data points. A Actual demand for the period (  Y). F Forecast demand for the period.
Reid & Sanders, Operations Management © Wiley 2002 Forecasting 8 C H A P T E R.
Time Series Analysis and Forecasting. Introduction to Time Series Analysis A time-series is a set of observations on a quantitative variable collected.
OM3-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights.
© Wallace J. Hopp, Mark L. Spearman, 1996, Forecasting The future is made of the same stuff as the present. – Simone.
Demand Forecasting Prof. Ravikesh Srivastava Lecture-11.
1 1 Chapter 6 Forecasting n Quantitative Approaches to Forecasting n The Components of a Time Series n Measures of Forecast Accuracy n Using Smoothing.
CHAPTER 12 FORECASTING. THE CONCEPTS A prediction of future events used for planning purpose Supply chain success, resources planning, scheduling, capacity.
3-1Forecasting CHAPTER 3 Forecasting McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
Data Mining: Neural Network Applications by Louise Francis CAS Convention, Nov 13, 2001 Francis Analytics and Actuarial Data Mining, Inc.
Forecasting Production and Operations Management 3-1.
Demand Management and Forecasting Chapter 11 Portions Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Forecast 2 Linear trend Forecast error Seasonal demand.
Chapter 15 Forecasting. Forecasting Methods n Forecasting methods can be classified as qualitative or quantitative. n Such methods are appropriate when.
Demand Forecasting Production and Operations Management Judit Uzonyi-Kecskés Ph.D. Student Department of Management and Corporate Economics Budapest University.
Forecasting. Model with indicator variables The choice of a forecasting technique depends on the components identified in the time series. The techniques.
Chapter 11 – With Woodruff Modications Demand Management and Forecasting Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Presentation : “ Maximum Likelihood Estimation” Presented By : Jesu Kiran Spurgen Date :
1 1 Forecasting and Demand Modeling ISyE 6203 – Fall 2009 Dr. Anton Kleywegt Dr. Mark Goetschalckx Dr. Evren Ozkaya Thanks to:
STA302/1001 week 11 Regression Models - Introduction In regression models, two types of variables that are studied:  A dependent variable, Y, also called.
Demand Forecasting Fall, 2016 EMBA 512 Demand Forecasting
Forecasts.
Forecasting Methods Dr. T. T. Kachwala.
Fall, 2017 EMBA 512 Demand Forecasting
Principles of Supply Chain Management: A Balanced Approach
Forecasting Elements of good forecast Accurate Timely Reliable
Statistical Assumptions for SLR
Chapter 8 Supplement Forecasting.
Forecasting - Introduction
Presentation transcript:

Confidential 1 DCPs in Forecasting Edward Kambour, Senior Scientist Roxy Cramer, Scientist

Confidential Forecasting Background The booking period is broken down into intervals during which the underlying demand process is stable Handles heterogeneity in the arrival rates Addresses the small numbers problem Signal to noise Sample sizes

Confidential DCP Forecasting Aggregate all transactions that occur during an interval of the booking process Use historical aggregated bookings to forecast the arrival rate during the DCP Forecast the arrival rate for any given day in the interval by breaking up the DCP forecast Assume constant arrival rate

Confidential Small Numbers Problem Signal to noise Finer granularity implies a lower signal to noise ratio For Poisson data, the SNR = sqrt(mean) Problematic for detecting demand shifts, seasonal trends, and holiday effects Aggregating to the DCP level increases the signal to noise ratio

Confidential Small Numbers (cont.) Sample Size Aggregating m different days into a DCP increases the sample size by a factor of m Using a 10 day DCP results in having 10 observations per departure date Leads to superior forecast accuracy because we use more information about the demand process

Confidential Example 1 5 Day Booking period Constant Poisson arrival rate 1 per day Examine forecast accuracy 5 DCPs Single DCP

Confidential Example 1 Booking Curve

Confidential Example 1: Forecasting Suppose we have observations for n departure dates Forecast the number of bookings between 4 and 5 days out Single DCP: constant arrival rate Average number of bookings over all the days out 5 DCPs Average number of bookings between days 4 and 5

Confidential Example 1: Forecast Accuracy Both estimators are unbiased Single DCP estimate is based on a sample size of 5n Variance = 1/(5n), MSE = 1/(5n) 5 DCP estimate is based on a sample size of n Variance = 1/n, MSE = 1/n The Single DCP estimate is more accurate

Confidential Example 1: Simulation 5 historical departure dates

Confidential Example 1: Simulation Forecast Errors Single DCP MSE = , MAE = DCPs MSE = 0.44, MAE = 0.52

Confidential Example 2 10 Day Booking period Constant Poisson arrival rate over the first 5 days and the last 5 days 1 per day in the first 5 5 per day in the last 5 Examine forecast accuracy 10 DCPs 2 DCPs Single DCP

Confidential Example 2 Booking Curve

Confidential Example 2: Forecasting Suppose we have observations for n departure dates Forecast the number of bookings on between 4 and 5 days out Single DCP: constant arrival rate Average number of bookings over all the days out 2 DCPs: constant arrival rate from 5-10 and 0-5 days out Average number of bookings from 0-5 days out 10 DCPs Average number of bookings between days 4 and 5

Confidential Example 2: Forecast Accuracy 10 DCPs and 2 DCPs are unbiased Single DCP will overestimate for 5-10 days out and underestimate for 0-5 days out (Absolute Bias = 2) Single DCP, sample size of 10n Variance = 3/(10n), MSE = 3/(10n) DCP, sample size of 5n Variance = 1/n, MSE = 1/n 10 DCP estimate is based on a sample size of n Variance = 5/n, MSE = 5/n The 2 DCP estimate is most accurate

Confidential Example 2: Simulation 5 historical departure dates

Confidential Example 2: Simulation Forecast Errors Single DCP: MSE = 4.07, MAE = 2 10 DCPs: MSE = 0.92, MAE = DCPs: MSE = 0.24, MAE = 0.42

Confidential 10 DCP Booking Curve

Confidential 10 DCP Booking Curve

Confidential 2 DCP Booking Curve

Confidential 2 DCP Booking Curve

Confidential Finding the Best DCP Structure Gather data for numerous departure dates Fit every possible every possible DCP structure and select the one that has the smallest Mean Squared Error (MSE) The structure with the smallest MSE will generally be the one with the fewest DCPs and negligible bias. Recall that the MSE = Variance + Bias 2

Confidential DCP Selection Algorithm Configure the DCP question into a multiple linear regression with indicator predictors Utilize the change point regression methodology from McLaren (2000) Minimizes the estimated Expected MSE (risk), Eubank (1988) Utilizes a mixture of Backward Elimination, Draper (1981), and Regression by Leaps and Bounds, Furnival (1974) Extend the method to partition the MSE into its variance and squared bias components

Confidential Real Data Booking Curve

Confidential Real Fitted Booking Curve

Confidential Real Booking Curves

Confidential Considerations Business rules and requirements Application specific requirements Concerns about the proportion of demand in each DCP Don’t want to “put all the eggs in one basket” Day of Week issues Long haul versus short haul

Confidential Robustness Yields a mathematical starting point Finds best “sub-optimal” structures Quantifies the effect of using different DCP structures

Confidential Conclusion The number of DCPs is important Too many leads to low SNR and high forecast error Too few leads to biased forecasts, and hence high forecast error Want constant arrival rate throughout a DCP interval Examine historical booking curves Keep in mind the randomness involved

Confidential Technical References Draper, N. and Smith, H. (1981) Applied Regression Analysis. Wiley, New York. Eubank, R. L. (1988) Spline Smoothing and Nonparametric Regression. Marcel Dekker, Inc., New York. Furnival, G. M. and Wilson, R. W. (1974). Regression by Leaps and Bounds. Technometrics, 16, McLaren, C. E., Kambour, E. L., McLachlan, G. J. Lukaski, H. C., Li X., Brittenham, G. E., and McLaren, G. D. (2000). Patient-specific Analysis of Sequential Haematologial Data by Multiple Linear Regression and Mixture Modelling. Statistics in Medicine, 19,