© 2006 IBM Corporation JFS tests process on System z.

Slides:



Advertisements
Similar presentations
© 2007 IBM Corporation Demo Shimon Nir, Rational Technical & Service Manager, IBM Southwest Europe.
Advertisements

Introduction to Eclipse cs112b1 – Lab01 by Rui Shi.
® IBM Software Group © 2010 IBM Corporation What’s New in Profiling & Code Coverage RAD V8 April 21, 2011 Kathy Chan
Test Automation Framework Ashesh Jain 2007EE50403 Manager Amit Maheshwari.
Goals Give you a feeling of what Eclipse is.
Mike Azocar Sr. Developer Technical Specialist Microsoft Corporation
Integrated Development Environments. Today We Will: Go over more advanced functionality of Eclipse. Break up into teams to work on presentation and final.
1 Copyright © 2014 Tata Consultancy Services Limited Source Code Management using Rational Team Concert IBM Rational, Alliance & Technology Unit 2 July.
Network File System (NFS) in AIX System COSC513 Operation Systems Instructor: Prof. Anvari Yuan Ma SID:
ECE355 Project SIP Applications Tiuley Alguindigue
© 2009 IBM Corporation 1 RTC ClearQuest Importer and Synchronizer Lorelei Ngooi – RTC ClearQuest Synchronizer Lead.
WebOPI -Build & Setup Xihui Chen April, 2013.
Parts of a Computer Why Use Binary Numbers? Source Code - Assembly - Machine Code.
M. Taimoor Khan * Java Server Pages (JSP) is a server-side programming technology that enables the creation of dynamic,
Servlets Environment Setup. Agenda:  Setting up Java Development Kit  Setting up Web Server: Tomcat  Setting up CLASSPATH.
Microsoft Visual SourceSafe Very popular Mainly used by Windows developers Cornerstone of many development teams Provides essential version control functions.
Eclipse Overview Introduction to Web Programming Kirkwood Continuing Education Fred McClurg © Copyright 2015, Fred McClurg, All Rights Reserved.
© 2005 by IBM; made available under the EPL v1.0 | March 1, 2005 Tim deBoer Gorkem Ercan Extend WTP Server Tools for your.
Modern Software Technologies Java™, J2EE™, JSP™, JDBC™ by Radoslav Tr. Ivanov
1 Documentum 6 Reviews from Early Adopters Technology Services Group, Inc. October 10, 2007.
Understanding Eclipse Development Environment Hen-I Yang July 7, 2006
Classic Data Access Training OPC Classic Compliance Test Tool Introduction to the OPC Compliance Test for OPC Classic Server Testing Press SPACE to advance.
© Copyright , Inflectra CorporationPage: 1 Product Overview Test Automation Integration for SpiraTest® and SpiraTeam®
April 4, Team Foundation Server Business Analyst Build Server Tech Writer on Mac OS X.NET Developer on Visual Studio Test Team User.
Designing and Developing WS B. Ramamurthy. Plans We will examine the resources available for development of JAX-WS based web services. We need an IDE,
© 2002 IBM Corporation LANDP 24 th April 2003 LANDP for Linux Web Lecture.
SVN in Eclipse Presented by David Eisler 10/09/2014.
CPSC 233 Run graphical Java programs remotely on Mac and Windows.
Prachi Chitnis.  The CSS feel  SDS – Synoptic Display Studio  ADL Converter  PV table, Probe…
Dream Team Corporation Library Management System National Innovation Foundation library Configuration and Testing Alexander Kanavin
A Networked Machine Management System 16, 1999.
9/2/ CS171 -Math & Computer Science Department at Emory University.
® IBM Software Group © 2007 IBM Corporation Jazz Report and Dashboard Kevin (Gu Ming)
IBM Software Group ® Project Area and Team Area in Jazz.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio Training - Development Setup.
Liferay Installation Prepared by: Do Xuan Hai 8 August 2011.
Oracle Data Integrator Agents. 8-2 Understanding Agents.
Andy Pavlo November 29, 2015November 29, 2015November 29, 2015 Testing H- Store.
Managed by UT-Battelle for the Department of Energy Kay Kasemir, Xihui Chen ORNL/SNS April Control System Studio Training - Development.
© 2008 by Shawn Spiars; made available under the EPL v1.0 | March 17, 2008 Case Study – Phurnace Software and RCP Shawn Spiars Lead UI Developer Phurnace.
Virtual techdays INDIA │ august 2010 virtual techdays INDIA │ august 2010 Consolidate and Virtualize your Linux Environment M.S.Anand │ Technology.
Introduction to Eclipse Al-Zahra Univerisity Advanced Programming Arash N. Kia.
STEP BY STEP INSTALLATION By Eng. BASSEM ALSAID. Step 1: Boot from windows server 2008 installation DVD, windows will load needed files for starting installation.
CLM Case Study An investigation of deployment options for IBM Rational Team Concert in a ClearCase/ClearQuest environment July 18, 2011 Michael Gormley.
All the dSoftArk Tools Getting started!. Tools dSoftArk is a semi-realistic, agile, development project –Industrial strength software (programming, TDD,
ViaSQL Technical Overview. Viaserv, Inc. 2 ViaSQL Support for S/390 n Originally a VSE product n OS/390 version released in 1999 n Identical features.
Loader Tutorial Set Up. Requirements Java 7 Eclipse IvyIDE plugin Git Optional: Ant Maven.
Build and Deployment Process Understand NCI’s DevOps and continuous integration requirements Understand NCI’s build and distribution requirements.
Neil Kidd Developer Tools Technical Specialist Microsoft UK.
Selenium server By, Kartikeya Rastogi Mayur Sapre Mosheca. R
Test Automation Using Selenium Presented by: Shambo Ghosh Ankit Sachan Samapti Sinhamahapatra Akshay Kotawala.
© 2013 IBM Corporation IBM Rational Asset Analyzer & Rational Asset Analyzer for System z Rational Asset Analyzer What is new! Leshek Fiedorowicz
CERN IT Department CH-1211 Genève 23 Switzerland t Bamboo users meeting IT-CS-CT.
IBM Software Group ® Jazz Team Build – Part 1 Overview Jonathan.
IBM Worklight environment setup 1. Eclipse IDE Multi-purpose integrated development environment (IDE) Open source Supported for Windows, Mac OS X, Linux.
XNAT 1.7: Getting Started 6 June, Introduction In this presentation we’ll discuss:  Features and functions in XNAT 1.7  Requirements  Installing.
Debugging RTC CLI in Eclipse
SAP Business One 9.0 integration for SAP NetWeaver Installation and Technical Configuration 2013 March.
Open-O Integration Project Introduction
Goals Give you a feeling of what Eclipse is.
INSTALLING SQL SERVER 2016 vNext CTP 1.2 ON LINUX UBUNTU 16.04LTS
RTC – Source Control Management
Proposed AD groups for TFS Users
RemoteLaunch - Overview
Hardware Security: Keeping Drivers and Firmware Updated Jason Ross
Install Ruby If you are running on Mac OS X, Ruby is preinstalled.
Presentation transcript:

© 2006 IBM Corporation JFS tests process on System z

© 2006 IBM Corporation 2 Every Thursday  A ‘foundation.20.integration_Iyyyymmdd-hhmm’ build to use  That means 2 prerequisites 1. a repository workspace to create by tests coordinator 2. 2 Jazz server configurations to set up by technical support  2 Jazz server configurations to use on z/OS or z/Linux platform –a basic configuration (Tomcat/Derby/Java bits) –a second specific configuration

© 2006 IBM Corporation 3 Once first prerequisite is passed  On each remote test machine –a RTC client to open –a Eclipse workspace to create –a ‘text encoding file’ preference to update to ‘UTF-8’ –the associated repository workspace to load –a running configuration to create –a check on the number of total tests to execute

© 2006 IBM Corporation 4 Once second prerequisite is passed  On each remote test machine –a time synchronization between the server and the test machine –the already running configuration to use –a server reference to indicate as VM argument –a ‘AllHttpTests’ test suite to launch

© 2006 IBM Corporation 5 Tasks life cycle  1 parent task, created and owned by tests coordinator  2 child tasks, created by tests coordinator and owned by technical support, for each server configuration to set up  3 child tasks, created by tests coordinator and owned by tester –1 child work item, to load the repository workspace on each remote test machine. This work item includes: Load workspace Create running configuration Perform the check on tests number –2 child tasks to launch the JUnit test suite on each appropriate test machine.

© 2006 IBM Corporation 6 Foundation driver is built Parent task is created Repository workspace Is created Server configuration is set up JFS test suite is launched Result is reported in the task, by the tester Result is reported to JFS team JFS smoke tests for 2.0 using build foundation.20.integration Iyyyymmdd- hhmm Tag: test_jfs Child task is created, for server configuration setup Child task is created, to load the repository workspace Child task is created, to launch the JFS test suite Repository workspace is loaded Parent task is closed Installation is reported in the child task, by technical support