VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)

Slides:



Advertisements
Similar presentations
Feb 2009 Introducing ARTIST - Airbus Deutschland GmbH - TBCEI33 Introducing ARTIST Trust and Identification Aircraft Security Presented by Michel Messerschmidt.
Advertisements

AIRCRAFT FIRE AND CABIN SAFETY RESEARCH CONFERENCE Dr. A. Freiling - Ref. X26PR Issue 1 Relation between active and passive Fire Protection.
WG78 / SC214 – Plenary 12 (Berlin)
VSG – CPDLC Msg Set Validation WG78/SC214 SG (Luxembourg) Feb 2012VSG - CPDLC Msg Set Validation Presented by VSG (Greg Saccone / Jerome Condis)
Standards for Seamless ATS communications transition between different datalink technologies Presented by CONDIS Jerome Airbus May 2010.
ICAO-UPDATE, ACN/PCN Federal Aviation Administration
The revenue crisis: when will the airline industry recover? Narjess Teyssier ICAO n Chief Economic Analysis & Policy Section Montréal 26 September 2010.
Cabin Component Design Features Fire Properties of Corefiller, Adhesive, „Ditch and Pot“ March 2009 Presented by Ingo WEICHERT TBCEE12.
State of Air Transport focus on MID Region 1 ICAO Aviation Data Analyses Seminar Middle East (MID) Regional Office October Economic Analysis and.
Southampton 1 P Bradshaw EDXCW. Commercial Aircraft Conceptual Design - Some Considerations 15 th November 2005 P Bradshaw EDXCW Wing & Aerodynamics Skill.
Southampton 2 P Bradshaw EDXCW. © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Develop Capabilities for Multiple Challenges.
ICAO Aviation Data Analyses Seminar Middle East (MID) Regional Office October Economic Analysis and Policy (EAP) Section Air Transport Bureau (ATB)
R&R Consulting Approach
Month 200X Use menu "View - Header & Footer" for Presentation title - Siglum - Reference Large Jig Verification Project LVMC 06 Geraint W Jones Engineering.
© COPYRIGHT ABCONSULTING Understanding Flight Operations For Manufacturers by Antoine BRU.
© COPYRIGHT ABCONSULTING Understanding Flight Operations - Part Two by Antoine BRU.
Fuel Tank Inerting Joint Airbus/FAA, A320 Flight Tests
E-TSI light user manual for Instructors Questionnaire online: How can I show to my Customer to fill in a questionnaire? How can I print directly from the.
AIRBUS SUPPORT IN SOUTH ASIA Contributing to the Safety of Aviation Community April, 2011To 8 th 5 th Presented by Captain Michel MENESTROT Flight Ops.
Airbus Training Perspective
9-Apr-2008 WALLTURB meeting at ONERA Toulouse WALLTURB: CFD results on Surrey Bump WALLTURB Presented by Jerry Benton.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
Southampton 3 P Bradshaw EDXCW. © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Pop-Up Spoilers Description  High lift: Slats,
Doc.: IEEE /0003r0 Submission January 2013 S. Filin H. Harada, NICTSlide 1 Introduction to Contributions Notice: This document has been prepared.
Aviation Safety in a changing world FSF MED MAY 2014 Airbus Product Safety Frédéric COMBES Head of Accident / Incident Investigation.
Jean-Pierre DANIEL, Airbus at AIAA CANEUS 2004, Monterey CA, USA Structural Health Monitoring for Airliners from research to user requirements, a European.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
TIA TECHNICAL COMMITTEE UPED Title: UPED Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen.
UPED Title: Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen CompanyFluke Networks Address9015 Mountain.
Airbus Status on ADS-B In / Out Update
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
C-Band for AIRBUS Telemetry : status and improvement June 2015 ETTC 2015 Gilles Freaud /Luc FALGA ETTC 2015 Toulouse.
Big Data in Airbus Flight Test and Integration Center
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
Friends and Partners of Aviation Weather, Fall 2015, Las Vegas, NV Determining Runway Conditions in Real Time Using Data Obtained from Airplanes during.
Session # NRR Committee Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0018 Date Submitted:
Fuel Cell By-Products for Cargo Hold Fire Suppression
Training & Flight Operations Support and Services
Greener Skies 4th Aviation and Environment Conference Hong Kong - September 27, 2011 Presented by Frederic Eychenne, Airbus New Energies Programme Manager.
C.B.T. Administrator course
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Novec 1230 cold testing outcomes IAFPSWG meeting Nov 2011 Month 200XNovec 1230 cold testing outcomes - IAFPSWG meeting Nov 11 - EET13 - Ref. V26PR
UBAX14 Microsoft Convention 2013 ‘If you’re trying to get to there…..’
© AIRBUS all rights reserved. Confidential and proprietary document. An Active Safety Net for Runway Overruns Presented by Logan JONES Airbus Flight Operations.
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
State of Air Transport focus on MID Region
Trust and Identification
AMASIS Exercises Airbus FHS Campinas, October 2016 Thomas Lefrançois
Work Plan for IEEE m Standard & IMT-Advanced Submission
ICAO CO2 Reporting and Analysis System (ICORAS)
ICAO Strategic Objective: Economic Development of Air Transport
Economic Analysis and Policy (EAP) Section Air Transport Bureau (ATB)
ITU-R Liaison Group Report - Session #62 Opening Plenary
A family of Smart-Galley
doc.: IEEE <doc#>
IEEE MEDIA INDEPENDENT HANDOVER SERVICES
doc.: IEEE <doc#>
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Opening Information for July 2014]
doc.: IEEE <doc#>
DISCLAIMER This document contains information that is confidential and proprietary to SC Group. It is being given to you only for the purpose of review.
IEEE MEDIA INDEPENDENT HANDOVER SERVICES
IEEE MEDIA INDEPENDENT SERVICES DCN:
IEEE MEDIA INDEPENDENT SERVICES DCN:
ITU-R Liaison Group Report - Session #61 Opening Plenary
Presentation transcript:

VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. CPDLC Msg Set Validation CPDLC Msg Set CPDLC Msg Set planned to be submitted to ICAO OPLINKP#4 (Mar 2012) Should be the basis for initiation of the formal ICAO validation (States consultation) planned to last 18 months at least Validation will continue as part of SESAR, NextGen and others  Need to define a robust process to manage this two validations in parallel VSG will address this issue and may come up with an additional Working Paper for OPLINKP#4 to support the validation of the Message Set Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. VSG Schedule Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report Status Fresh news from SESAR Live Initial 4D flight conducted on 10 Feb 2012 Successful RTA target achieved in windy and high pressure environment with the 2 FMS vendors CPDLC and ADS-C (including EPP and ETAmin-max) exchanges completed for one complete descent AirbusI4D.mpg Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report Status Validation Report v0.D Validation Report v0.D released 06 Feb 2012 Includes latest external validation projects objectives results  External coordination shall continue to track results from external VPs Includes partial internal validation results  Internal coordination shall continue to ensure results from internal VAs are properly captured Validation Results template Updated Validation Results template is ready for distribution VSG schedule Progress in line with agreed VSG schedule Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report – Workplan for this week Validation Report v0.D Review comments on Validation Report v0.D if any Progress on internal validation results records Validation Results template Release Validation Results template to external VPs Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Plan Status & Workplan Now v0.I standards are released Validation Objective Operational Requirement update Validation Objective and Operational Requirement matrixes will cover service name changes, new services since Version H More mature service definitions can now be captured, especially for :  FIS  IER  OCL  D-RVR  D-HZWX Standards Validation Plan v2 Identification of remaining to do items and associated plan, with target of Apr 2012 for Standards Validation Plan v2 release Feb 2012VSG - Input

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Plan Scope (reminder) Feb 2012VSG - Input ATS Data Link ServicesATNFANSL2K BC DLIC (including seamless transition)Covered in V1 ACMCovered in V1 CRDCovered in V1 AMCCovered in V1 ITBOCovered in V1 DCLCovered in V1 Not applicable D-TAXICovered in V1Not applicable D-OTISCovered in V1Not applicable 4DTRADCovered in V1Not applicable IER (CPDLC)Covered in V2 IER (ADS-C)Covered in V2 Not applicable PRCovered in V2 Not applicable CRD for ITPCovered in V2 Not applicable CRD for IMCovered in V2Not applicable DSCCovered in V2Not applicable D-RVRCovered in V2Not applicable D-HZWXCovered in V2Not applicable

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. VSG Planning for the week Feb 2012VSG - Input Mon 13 FebTues 14 FebWed 15 FebThurs 16 FebFri 17 Feb AM (9:00 – 13:00) Common Session VSG Validation Plan VSG Validation Plan VSG Validation Report VSG Validation Report VSG CPDLC Msg Set Validation PM (14:00-17:00) VSG CPDLC Msg Set Validation Common session VSG Validation Plan

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Feb 2012VSG - Input © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.