VV&A-1 VV&A Breakout Session Simone Youngblood The Johns Hopkins University Applied Physics Lab.

Slides:



Advertisements
Similar presentations
Software Requirements
Advertisements

Software Requirements
1 Human Factors Course Session 4 Eric Davey Crew Systems Solutions 2007 March 28.
Key Stage 3 National Strategy Standards and assessment: session 3.
Project management Project manager must;
Critical Thinking Rubrics David Hunter, Ph.D. Associate Professor, Chair Philosophy and Humanities Buffalo State College, SUNY November 4, 2005.
I/ITSEC Tutorial #1019 The Basics of the M&S VV&A Process Simone Youngblood The Johns Hopkins University Applied Physics Laboratory
Developing Information Security Policy. Why is Developing Good Security Policy Difficult? Effective Security/IA Policy is more than locking doors and.
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
(P)PM&E problem/issues Issues in PPM&E that need to be addressed in order to enhance our organisational performance T.K. Orgle GHANA MINISTRY OF LANDS.
Analysis Modeling Over view of today’s lesson T he analysis model is the first technical representation of a system. Analysis modeling uses a combination.
B&O Committee May 2015 iTRAK - Change Management An Agency Adapting to Change.
Session 121 National Incident Management Systems Session 12 Slide Deck.
Week 2 Standards and evidence Building your professional persona and portfolio.
1 CMPT 275 Software Engineering Requirements Analysis Process Janice Regan,
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Data Structures and Programming.  John Edgar2.
Preventive Controls Phase 2 Workgroup 1.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Essentia EMR Jenifer Brilla CRNP Wilkes University.
Leaders Manage Daily Operations
Instructional Design Aldo Prado. Instructional Design Instructional design is the process of easing the acquisition of knowledge and making it more efficient.
Evaluation Process/Requirements for CAPP Algebra Project.
Changes without Prior Approval Breakout Session Summary Rick Smith Aventis Pasteur, Inc.
System Analysis and Design Dr. Taysir Hassan Abdel Hamid Lecture 5: Analysis Chapter 3: Requirements Determination November 10, 2013.
Supporting Integrated and Comprehensive Approaches to Climate Change Adaptation in Africa AAP Country Conference “Celebrating our Successes” 12 th - 16.
Overview of Formal Methods. Topics Introduction and terminology FM and Software Engineering Applications of FM Propositional and Predicate Logic Program.
Using Human Component Mapping TO ANALYSE & INTEGRATE HUMAN FACTORS ISSUES & RECORDS WITH RAILWAY HAZARD LOGS 1 Dr. Amanda C. Elliott, Simon Macmull & Harry.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Evaluating HRD Programs
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Question To know that quality has improved, it would be helpful to be able to measure quality. How can we measure quality?
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Government Procurement Simulation (GPSim) Overview.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
The Why (Waiver & Strategic Plan) Aligned to research: MET Study Components: Framework/Multiple Measures Pilot Requirements Timeline.
Creating a European entity Management Architecture for eGovernment CUB - corvinus.hu Id Réka Vas
Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11.
PGES: The Final 10% i21: Navigating the 21 st Century Highway to Top Ten.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
Resources and Reflections: Using Data in Undergraduate Geosciences Cathy Manduca SERC Carleton College DLESE Annual Meeting 2003.
Amy M. Williamson Associate Professor Angelo State University SITE 2015.
1A.1 Vulnerability and Adaptation Assessment Hands-on Training Workshop Communication of V&A Analysis in National Communications.
Software Requirements Specification Document (SRS)
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
PBL Instructional Design. PBL Instructional Design Name: Name of PBL: Grade Level: Content Area:
VV&A-1 The Basics of the M&S VV&A Process Simone Youngblood The Johns Hopkins University Applied Physics Lab.
Chapter 4 Requirements Engineering (1/3) Yonsei University 2 nd Semester, 2015 Sanghyun Park.
Software Engineering, COMP201 Slide 1 Software Requirements BY M D ACHARYA Dept of Computer Science.
This chapter is extracted from Sommerville’s slides. Textbook chapter 22 1 Chapter 8 Validation and Verification 1.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
CMMI Certification - By Global Certification Consultancy.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Program Evaluation ED 740 Study Team Project Program Evaluation
Chapter 4 – Requirements Engineering
Chapter 5 – Requirements Engineering
Initiating systems development
Software Processes (a)
CMMI – Staged Representation
Career Development Action Plan
Technology Planning.
K–8 Session 1: Exploring the Critical Areas
QA Reviews Lecture # 6.
Guidance document on ex ante evaluation
Involving Families Early Childhood Outcomes Center.
ISSUE MANAGEMENT PROCESS MONTH DAY, YEAR
Report by the Director-General on Evaluations Completed in th Session of the Executive Board October 2008 B. Keuppens Dir. IOS, UNESCO.
Capability Maturity Model
Presentation transcript:

VV&A-1 VV&A Breakout Session Simone Youngblood The Johns Hopkins University Applied Physics Lab

VV&A-2 VV&A Issues Need to have graduated basis for assessing rigor (maturity) of VV&A process –How do I improve my process? –What level of confidence can I expect based on what I applied? Need to be able to address how you deal with (validate) M&S of future representations without a strong referent –How do we deal with intangibles, e.g. human behavior, future predictions, Agent based simulations? Need more precise mathematical descriptors of the RAM-C KPPs –Without descriptions, we cannot determine how to measure, therefore, we cannot validate or describe intended uses Need timely access to quality data –Impacts results Need to resolve logical consistency for integration –Without logical consistency makes substantive interoperability impossible Need documentation that keeps pace with development/modification and VV&A –In early phases feeds downstream use and assessment

VV&A-3 Governance & Policy Issues Guidance that mirrors policy Ease of use and access –Practical examples, capturing lessons learned –VV&A histories to include both commercial and government –Standards, e.g. MILSTD3022 Policy incentives to encourage critical factors –Efficient and effective implementation –Cost Savings –Training and education DoD level VV&A working group