May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.

Slides:



Advertisements
Similar presentations
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
Advertisements

SG-Systems Working Group Charter: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
May SG Communications Overview Matt Gillmore 02/27/2012.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco TC Report] Date Submitted: [February 1st, 2010] Source: [Don Sturek]
SG Communications Sessions Tuesday, October 20th, 2009.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
OpenSG Closing Plenary Oct 22 nd, Agenda SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2005 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
1 May 2010 SG Network TF Overview & Deliverables Ron Cunningham (vice-chair) Presented to SGAC AWP 11Jul2012.
1 SGIP PAP 11 PEV V2G DEWG Dec 2-3, 2010 Grid InterOp 2010 Eric Simmon, NIST Jerry Melcher, EnerNex SGIP PAP 11 PEV V2G DEWG Grid InterOp 2010 Meeting.
NAESB Smart Grid Standards Task Force PAP10 Discussion William Cox —
Doc.: IEEE /0716r0 Submission July 2009 Kapil SoodSlide 1 Smart Grid and Date: Authors:
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Boot Camp - Conformity July 19, 2010 Detroit, USA.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
Open AMI Network 10/22/08.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: January 28, 2010 Source: Edge Conformity Task.
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG McLean Opening Report Date Submitted: May 2, 2010 Source: Edge Conformity Task Group Re:
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
12/10/2016 Smart Grid Requirements for IEEE M2M Network IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0042.
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Margaret Goodrich June 18, 2010
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
ETSI Standardization Activities on M2M communications
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
IEC TC57 Smart Grid Activities
OpenADR SRS Draft 1 Review
doc.: IEEE <doc#>
“OpenADR” “Boot Camp” Overview
Smart Grid ad hoc Closing Report - May 2010
doc.: IEEE <doc#>
SG Communications Boot Camp
SG Communications Sessions
Presentation transcript:

May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11

SG Boot Camp Agenda Review SG Communications structure within UCAiug Overview of this weeks meeting schedule Overview of Network Interop Task Force Overview of SG-Network Walkthrough of SG-Networks work – Requirements – Architecture reference diagram – System Requirements Specification overview

UCAiug Organization Overview

February 2010 SG Communications Agenda Tuesday AM2 SG-Communications – Overview of SG-NET, Network Interop and other activity overview Tuesday PM1 (Network Interoperability) – Review inputs on AMI – OpenHAN requirements analysis Tuesday, PM1 (SG-NET joint with SG-Security) – Payload CIA review, Logical Interface Control working session Tuesday, PM2 (SG-NET) – Vetting of new requirements

SG-Communications Agenda Cont. Wednesday, AM1 (Network Interop/Enterprise/Edge Conformity) – Joint session on conformance requirements Wednesday, AM1 (SG-NET) – Vetting of additional requirements cont. Wednesday, AM2 (SG-NET) – Requirement Database working session Wednesday, PM1 (Network Interop/Edge Conformity) – Joint session on conformance requirements Wednesday, PM1 - PM 2(SG-NET) – SRS working session – SRS working session and AOB

SG-Communications Agenda Cont. Thursday AM1 (Joint SG-NET / PAP 2) – SG Network work product review and plans for re- chartered PAP 2 Thursday AM2 (Joint SG-NET / PAP 2) – SG Network work product review and plans for re- chartered PAP 2

Slide 7 Network Interoperability Tom Herbst from Silver Spring Networks is the chair Internet Protocol (IP) use is assumed Since we are using IP, draft requirements document needs to address the following types of issues as they apply across platforms: – Collection of RFCs used (from SE 2.0 TRD) – Security protocols and cipher suites (from SE 2.0 TRD) – Application support protocols (from SE 2.0) – Policies, procedures and other considerations (eg firewalls, etc.) that are needed for cross platform deployments – What else? Co-existance for PLC

February 2010 Slide 8 Network Interoperability From the draft Scope/Charter: – Identify and articulate premise Network Interoperability requirements. Engage with Standards Development Organizations (SDOs) and vendor consortiums to realize realize implementation specifications and conformance programs based on the requirements. – Premise networks cover commercial, industrial and home area networks employing OpenSG requirements specifications. Ensure that the Network Interoperability requirements cover all market segments. – Align all premise Network Interoperability requirements with the NIST Smart Grid Interoperability Guidelines (Version 1.0 and any subsequent updates).

February 2010 Slide 9 Network Interoperability Proposed deliverables: – Creation of a Network Interoperability System Requirements Specification for premise platforms employing multiple physical network interfaces; – Outreach and engagement with SDO’s and vendor consortiums embracing and deploying the Network Interoperability System Requirements to realize standards and conformance programs based on the requirements; – The Network Interoperability Task Force will create, distribute and maintain a schedule and roadmap detailing the tasks and milestones that comprise the group's work; – The Task Force shall assist the Conformity Task Group in their job in defining the test plans and protocol interchange conformance statements (PICs) to apply certification to the components in its charter..

February 2010 Slide 10 Network Interoperability Call for participation: – Please Don Sturek, – reflector OPENSG-SGCOMM-NETINTEROP Process: – Update/approve the draft Scope/Charter – Submit to OpenSG TC for approval – Review the Requirements Specification Outline, update/approve and begin work – Outreach to SDO’s, vendor consortiums: IETF, IEEE ZigBee Alliance, HomePlug Alliance Other SDO’s and vendor consortiums working on SE 2.0

Questions?

SG-Network Overview Previously started as AMI-Network with a focus on network management. Scope and Charter for SG-Network within UCAiug – NIST PAP 2 (Wireless standards for the Smart Grid) Supply functional requirements for Smart Grid Networks from a utility perspective Define functional domains within the Smart Grid – Create a System Requirements Specification Provide information to SDO’s (e.g., IEEE P2030) Participation – Utilities, Academia, Vendors

SG-Network Work underway – Selected 30+ SG use cases for requirements – Defined 75 total actors from the use cases – Alignment with NIST and other sources to create an architecture diagram for reference – Functional Requirements Definition (3100+ identified to date, was before the Detroit meeting) – Define latency requirements (How long) – Define volumetric information (How often)

Examples of work accomplished to date Sample Actors – Smart Meter – Load Management System (LMS) Sample Requirement for a Smart Meter Use CaseRequirementHow OftenReliabilityLatency Meter reading Smart Meter shall be able send on demand read information 1 transaction per meter on demand > 98%< 5s Meter reading Smart Meter shall be able to report on demand read communication failure 1 transaction per meter on demand > 98%< 5s Meter reading Residential Electric Smart Meter shall be able to report when scheduled All meters report 4-6 times per day > 98%< 4hr

NIST Conceptual Model

Reference Architecture from NISTIR

P2030 Smart Grid Comms Reference Architecture

SG-Networks Reference Architecture

Deliverables Interim Release 1.0 was published in December 2009 – Requirements and some volumetric and latency requirements Interim Release 2.0 was published in February 2010 – Requirements, volumetric, latency requirements, security, implications and more use cases – Reference Architecture Diagram first published – System requirements specification published Interim Release 3.0 was published in May 2010 – Addition of the following use cases: Pre-Payment, Meter Events, DA and Outage Management – System requirements specification updates Interim Release 4.0 was published in June 2010 – Addition of the following use cases: DRLC, DA fault isolation and reconfiguration – System requirements specification re-write

Work Plan for the week Review Joint SG-SEC/SG-NET meeting to review security portions of requirements (Confidentiality, Integrity, Availability) System requirements Specification working sessions Review Requirements Database Plan scope of the next interim release PAP 2 joint meeting Thursday

Questions