Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Radiation at accelerator laboratories Prompt radiation from the particle beam Beam induced radiation –Neutrons –Gammas –Synchrotron radiation Radiation.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety aspects of LIU Outline: Safety documentation management
LIU / HL-LHC Cost and Schedule Review
Safety aspects of LIU Outline: Safety documentation management
Shielding Design for LCLS Injector Operation – Phase one
S. Roesler (on behalf of DGS-RP)
BE-ICS Activities during the LS2 Period (15 min)
EDMS v.1 02/07/2013 General trends in ventilation of radiation zones from the viewpoint of public exposure P. Vojtyla / DGS-SEE-XP.
Review of the Machine Protection System in the PS complex
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
Beam Loss and Radiation Working Group: Conclusions
ISOLDE Interlocks MSWG 13 August 2013 K. Hanke, E. Piselli KH.
BE-ICS activities for LIU Project
Radiation protection of Linac4 M. Silari Radiation Protection Group
LV Safe Powering from UPS to Clients
Status of the BI Work Package in the LIU-PSB frame
M.Tavlet, H.Taureg - ALICE
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Radiation Protection for the Beam Line 4 Schools project
BT1 SMV10 Stripline Failure
Safety Analysis and Safety Functions
SPS Injection BIS - Draft requirements
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP

Outline  RP measurements  Operational aspects  Additional monitoring  Conclusions 2EDMS PS-CSAP 10/10/2013

RP measurements EDMS PS-CSAP 10/10/20133  Objective: Assess the maximum dose rate in the accessible part of the PS in case of beam loss in the BTM line and BHZ10 failure

Measurements 4  PATP501(RAMSES monitor) installed in the area  Losses created by BE-OP (EN-STI had moved the stopper in the beam path) Residual dose rate in the area EDMS PS-CSAP 10/10/ st losses Scan 2 nd losses 2 intensities Monitor out of the PS

First beam loss created 5  3 pulses to the stopper (1.14e13 ppp)  Rescaling: 3.3e13 ppp and 3000 pulses/h  Pos. 1: 340  Sv/h / 0.11  Sv per pulse  Pos. 2: 155  Sv/h / 0.05  Sv per pulse  Pos.3 : 700  Sv/h / 0.23  Sv per pulse Pos. 1 Pos. 3 Pos. 2 (Pos. 3 not accessible with beam) EDMS PS-CSAP 10/10/2013 Stopper

Pos. 1 Pos. 3 Pos. 2 Scanning for worst configuration 6  Selected configuration :  BHZ10 off + BTM.QNO.5 off (BTP in)  Rescaling: 3.3e13 ppp and 3000 pulses/h  Pos. 1: 1.97 mSv/h / 0.7  Sv per pulse  Pos. 2: 710  Sv/h / 0.23  Sv per pulse  Pos.3 : 4.2 mSv/h / 1.4  Sv per pulse (Pos. 3 not accessible with beam) Even for this worst case, for losses limited to a few pulses (interlock) the dose is relatively low (to be put in perspective with residual dose rate levels) EDMS PS-CSAP 10/10/2013

Operational considerations 7  Alarm thresholds to be set according to residual dose rate when access is granted in the PS (RPO / piquet)  Short access, the dose rate decrease quickly  Status of “Porte secteur inter-zone” during technical stops and shutdown (left open ?)  Loss of flexibility in access to different areas (higher exposure…) 18/09/2012 Survey 40 cm) 06/11/201226/06/2012 EDMS PS-CSAP 10/10/2013

Missing RP monitor 8  Risks associated to a loss of the Linac2(4) beam (LTB)  Possible exposure of personnel in the center of the ring or SS12 area  Measurements done with full beam loss in the LTB line leads to 800  Sv/h at the center of the ring  One single monitor would protect both areas (alarm panel at both locations) EDMS PS-CSAP 10/10/2013 Monitor

Missing RP monitor 9  PATP501 paid on R2L budget anticipating the creation of this new operational mode  RP monitoring not ready to allow Switchyard operation with PS access.  Currently missing 45 kCHF to ensure proper monitoring of accessible areas in Switchyard mode (two areas currently uncovered in case of beam losses in the LTB line) ! EDMS PS-CSAP 10/10/2013

Conclusions 10  Beam losses in the BTM line leads to limited exposure of personnel in the PS ring area (interlock SIL2)  Operational procedure to be developed (to define the alarm thresholds for the PATP501 monitor)  Problem of induced radioactivity…. which will decrease with time (need to adapt the alarm threshold)….  Status of doors to be agreed upon (EN / BE / RP….) for different periods (shutdown, TS…)  RP is missing 45 kCHF to install the necessary monitoring for the switchyard operation mode….  As part of the PS ventilation commissioning study air flow between the PSB and PS (smoke test ?) to see if activated air could come from the PSB EDMS PS-CSAP 10/10/2013