PSE&G Condition-Based Maintenance

Slides:



Advertisements
Similar presentations
OMS 101 How to survive implementing a new Outage Management System Dave Blew Public Service Electric & Gas Newark, NJ.
Advertisements

Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Using AMI to Improve the Operation of the Electric Distribution System
After the Storm: Using GIS for Damage Assessment and Restoration October 2004 O ne GIS, Inc. One Platform, One Solution, One Company…
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
SDG&E PI-based Substation Real-Time Condition Based Maintenance System
Collect the data and… Make it Pay! Presented by Andy Gaither, NV Energy Greg Dumas, DST Controls.
VSE Corporation Proprietary Information
Vice President of Facilities
© 2008 OSIsoft, Inc. | Company Confidential ROMPETROL’S REAL TIME INFORMATION SYSTEM: a road from PLANT OPERATIONS FIELD DATA to MANAGERIAL DECISIONS.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
Steve Schwabe Woolpert Project Manager
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 How PI Notifications ensures that SmartSignal’s.
© 2008 OSIsoft, Inc. | Company Confidential Asset Management, Decision Making and Counter/Condition Based Maintenance at PSE&G Richard Wernsing – PSE&G.
Optimize Asset Implementation and Availability Using Condition Based Maintenance Tom Hosea, OSIsoft.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI System in T&D and Wind Generation Regional Seminar Series Jon.
Ed Gray, PE Public Service Electric and Gas
Asset Optimization and Condition Based Maintenance
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Distribution Management System Implementation at Florida Power & Light
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
SAP Preventive Maintenance An Overview
© 2008 OSIsoft, Inc. | Company Confidential Reduce Maintenance Cost connecting AF, RLink and Sap PM in Erg G. Conigliaro - Erg G. DiBartolo - Visiant.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Using PI data/events for Asset Maintenance Regional Seminar Series.
PSE&G Condition-Based Maintenance with OSI Technologies
© 2008 OSIsoft, Inc. | Company Confidential Panel : Business Value to the Enterprise of the PI System Real-time Infrastructure Moderator: Dr. Gretchen.
© 2007 PPL Electric Utilities Energy Outlook: 2008 and Beyond Small Business Development Center Lehigh University November 7, 2007 Tom Stathos PPL Electric.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Fleet Performance and Reliability in Generation Utilities
GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean.
Condition-based Maintenance Across the Enterprise
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Produced by: Integrated Asset Planning for Nuclear Power Plants Matt Kohal Southern California Edison.
Presenter: Peter Busch
CIMug Asset Health Focus Community Update for European CIMug Meeting June 19, 2014 Pat Brown EPRI.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. ROMPETROL’S REAL TIME INFORMATION SYSTEM a road from PLANT OPERATIONS.
OSI Regional Seminar 2008 Presented by: Kasen Huwa Sr. System Analysts, Xcel Energy Use of PI Process Book and Datalink Client tools for Energy Market.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER DAVE OPENSHAW London Electricity Group.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Using CIM and PI AF for Model-Driven Asset Management Darren Brungardt Kansas City Power & Light.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Substation Maintenance
NC AWWA-WEA 95th Annual Conference
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
EQUATE PETROCHEMICAL COMPANY EQUATE RCM Project Implementation By Khalid Al-Anzi.
Computerized Maintenance Management System (CMMS)
Utility Needs and Smart Grid for Major Storm Events
IPS-SYSTEMS implemented as
SALES: HOW TO USE THIS PRESENTATION
Jhonny Di Girolamo P.E CenterPoint Energy
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
CIMug Asset Health Focus Community
Workshop: Equipment June 29, 2006.
Using CIM and PI AF for Model-Driven Asset Management
Presentation transcript:

PSE&G Condition-Based Maintenance Angela Rothweiler October 13, 2009 PI Seminar - Philadelphia 2009 PI Seminar - Philadelphia PSEG T&D CBM

Agenda Background Problem Solution Critical Success Factors Asset Registry CMMS Functional Areas Data Collection Condition Assessment & Criticality Inspection Process Example Critical Success Factors 2009 PI Seminar - Philadelphia PSEG T&D CBM

Background Utility Overview Service Territory Delivery Implementation New Jersey Based Total Assets ~ $14 Billion Total Revenue ~ $7 Billion Service Territory 70% of New Jersey’s population 2.0 million Electric customers 1.6 million Gas customers 2,600 Square Miles Delivery Implementation 1999 – SAP 2000 - OMS, GIS & CAD 2002 - CMMS 2009 PI Seminar - Philadelphia PSEG T&D CBM

Asset Population by Division and Age Class Within Equipment Problem No predictive maintenance program or strategy Significant liability risk and system outage potential from old equipment vulnerable to failure Limited assessment tools for determining asset condition Decreasing expertise in both field maintenance and engineering No formalized capital spending program Asset Information in a variety of disparate systems Asset Population by Division and Age Class Within Equipment 2009 PI Seminar - Philadelphia PSEG T&D CBM

Inside Plant Electric Asset Registry Equipment & Locations Class and Characteristics Nameplate Maintenance Plans (56k Plans) Calendar-based Counter-based Condition-based Notifications Damage and Cause Codes grouped by Equipment Equipment Visibility PM Plan Cost/Hours vs. Actual CM Cost 2009 PI Seminar - Philadelphia PSEG T&D CBM

Maintenance Management Functional Areas Data Collection SAP Asset Information Time-Series Data Collection Application Diagnostic and Inspection Data Asset Analysis and Reporting Condition Assessment Work Prioritization Alerts / Notifications Maintenance Management Measurement Points Maintenance Plan Modifications Notifications Data Collection Analysis & Reporting Maintenance Management Raw data Measurement points Notification Feedback 2009 PI Seminar - Philadelphia PSEG T&D CBM

Data Collection & Consolidation PI - OPC Doble Distribution SCADA Electrical test results Transmission SCADA Breaker Tests PI HDW Diagnostic data ESOC PI Transformer loads Delta-X MV90 Transformer oil analysis SAP-PM MDT Hydran PI Manual Logger SAP order history and technical object updates Weekly substation inspection Gas equipment results 2009 PI Seminar - Philadelphia PSEG T&D CBM

MDB Hierarchy Structure

MDB Properties & Aliases

Condition Assessment Overview Calculation Structure CA = F1(M1) + F2(M2) + F3(M3) + … Factors driven by data available Example Factors CM Cost & Count for Past 6 Months Operation Count for Past 6/12 Months Gas Analysis – Change over time Average Load over Time Peer Groups Apply calculations by peer group Voltage, Class, Type Example Groups: 26KV – 69KV GCB 138KV+ Power Transformer LTC Vacuum Tanks 2009 PI Seminar - Philadelphia PSEG T&D CBM

Criticality Calculation Structure Peer Groups CA = F1(M1) + F2(M2) + F3(M3) + … SAP Static Factors Voltage Location Replacement Cost Age Peer Groups Apply calculations by Equipment Class Example Groups: Gas Circuit Breaker Power Transformers Use as a tie breaker in CA evaluation 2009 PI Seminar - Philadelphia

Substation Inspection Process Notifications PM Orders Measurement Document Interface Triggers Order & Status Updates Data Tour CAD/PI Tour and Values Job and Status PI Manual Logger database PI Manual Logger Data entry SAP generates inspection order CAD Auto-dispatch orders to operators groups Operator collects inspection data via PI-ML and sends to PI PI evaluates data and generates SAP notifications or transfers measurement document to SAP via PI RLINK 2009 PI Seminar - Philadelphia PSEG T&D CBM

Alerts / Notifications PI-ACE Algorithms monitor real-time & weekly inspection data Creates emails and SAP notification Examples: Excessive LTC Operations High GCB Temperatures Low GCB Pressure Low Transformer Oil Tank Levels Low Nitrogen Cylinder Pressure 2009 PI Seminar - Philadelphia PSEG T&D CBM

SAP BI Webinar 2009 PSEG T&D CBM

Algorithm Rules

Critical Success Factor Right Vision (Business & Technical) Organizational Changes to support system LOB Control Change SME thought process Tied success directly to SME and Asset Engineers Goals Constantly Measuring Inputs 2009 PI Seminar - Philadelphia PSEG T&D CBM

Q&A 2009 PI Seminar - Philadelphia PSEG T&D CBM