Jozef Žižňovský Stakčín, December 2012

Slides:



Advertisements
Similar presentations
First Light at Prompt7 (Chart32) Chilean Advanced Remote Telescope 32“ operating at Cerro Tololo/Chile (CTIO) March 04, Johannes Schedler.
Advertisements

New Non-Contact, Laser-Based Gauge for Measuring Length and Speed of Gypsum Board Stuart Manser Beta LaserMike.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
Observational techniques meeting #7. Detectors CMOS (active pixel arrays) Arrays of pixels, each composed on a photodetector (photodiode), amplifier,
Optical Astronomy Imaging Chain: Telescopes & CCDs.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Astronomy for beginners Telescopes By Aashman Vyas.
The Research School of Astronomy and Astrophysics of the Australian National University at Mt Stromlo Observatory is developing a wide-field Cassegrain.
An Introduction to mini-SONG Project Xiaojun Jiang Natioanl Astronomical Observatories Chinese Academy of Sciences.
Wide-field, triple spectrograph with R=5000 for a fast 22 m telescope Roger Angel, Steward Observatory 1 st draft, December 4, 2002 Summary This wide-field,
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Spectrographs. Spectral Resolution d 1 2 Consider two monochromatic beams They will just be resolved when they have a wavelength separation of d Resolving.
Astronomical Spectroscopy
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Oct 17, 2001SALT PFIS PDR - Structure1 Structure Interface/ constraints Loads Structure design rationale Truss Weight and CG Finite Element Analysis/ Image.
Prepared by Mahmoud F. Elbatta Ahmad Alyazgi Amjad Alaskary Akram abo Twahina Roshdi tambora.
Unit 1 Physics Detailed Study 3.1 Chapter 10: Astronomy.
2.4m Telescope Group Yunnan Observatory of CAS Status of LiJET Project & The Coude Echelle Spectrograph for the Lijang 1.8m Telescope China-Japan Collaboration.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Big Bear Solar Observatory NST Main Features  All reflecting, off-axis Gregory optical configuration  PM: 1.6 m clear aperture with f/2.4  Figuring.
SPECTROSCOPIC DIAGNOSTIC COMPLEX FOR STUDYING PULSED TOKAMAK PLASMA Yu. Golubovskii, Yu. Ionikh, A. Mestchanov, V. Milenin, I. Porokhova, N. Timofeev Saint-Petersburg.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Peter Gillingham, Stan Miziarski, and Urs Klauser (Anglo-Australian Observatory) Figure 1 View of OzPoz showing the front of the focal late in observig.
Telescope Technologies
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
The Observations of LAMOST Jianrong Shi NAOC 1/
14 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
Chinese SONG progress and its design introduction Guomin Wang Nanjing Institute of Astronomical Optics & Technology Nanjing.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Near Infrared Spectro-polarimeter (NIRSP) Conceptual Design Don Mickey Jeff Kuhn Haosheng Lin.
First results of the tests campaign in VISIBLE in VISIBLE for the demonstrator 12 October 2007 SNAP Collaboration Meeting Paris Marie-Hélène Aumeunier.
Astrophotography The Basics. Image Capture Devices Digital Compact cameras Webcams Digital SLR cameras Astronomical CCD cameras.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Optical Aeronomy Calibration Facility CEDAR WORKSHOP JUNE, 2007 Jeff Baumgardner, Center for Space Physics Boston University.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
An IFU for IFOSC on IUCAA 2m Telescope
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
Exoplanet Transit Observations at Weihai Observatory of Shandong University Chen CAO
Database of Variable Stars Bingqiu Chen Dept of Astronomy Beijing Normal University.
Introduction of SONG telescope design Guomin Wang, Bozhong Gu, Xiangyan Yuan Zhiyong Zhang, Xiang Jiang, Shihai Yang The Third Workshop of SONG Beijing.
Oct 30, 2003PFIS - Student Wkshop1 The Prime Focus Imaging Spectrograph – Old Challenges and New Ones K. Nordsieck, Principal Investigator Jeff Percival,
Precision Metrology Lab.  Piezoelectric type dispenser The principle is to actuate a disk type PZT to push the liquid and make the drop to perform a linearly.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
THE CRAO'S CONTRIBUTION FOR THE WSO / UV PROJECT N.V.STESHENKO.
1 Optical observations of asteroids – and the same for space debris… Dr. D. Koschny European Space Agency Chair of Astronautics, TU Munich Stardust school.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Disk formatting Magnetic disks come in various sizes and so each use different disk drives. Different computers have different ways of organizing data.
Pre-focal wave front correction and field stabilization for the E-ELT
Visible Spectro-polarimeter (ViSP) Conceptual Design David Elmore HAO/NCAR
1 Astronomical Observational Techniques and Instrumentation Professor Don Figer Telescopes.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
11 – 13 May 2016 Osservatorio Polifunzionale del Chianti Use of SMALL TELESCOPES in the GIANT ERA Italo Foppiani – Technical manager In collaboration with.
The ASTRI prototype: a pathfinder Dual-Mirror telescope for the CTA-SST array Rodolfo Canestrari for the ASTRI collaboration INAF-Astronomical Observatory.
CTA-LST Large Size Telescope M. Teshima for the CTA Consortium Institute for Cosmic Ray Research, University of Tokyo Max-Planck-Institute for Physics.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Linescanner MP150 Infrared Temperature Measurement for Quality Control and Process Automation Raytek Confidential 10/2010, Rev. B.
Digital Light Sources First introduced in 2001.
WEAVE Spectrograph.
Astronomical Spectroscopic Techniques
Mechanical Design Review February 25, 2008 Université de Montréal
LumiCal mechanical design, integration with LDC and laser alignment
Outlines : Introduction . Construction . Control .
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
An IFU slicer spectrometer for SNAP
Astronomical Observational Techniques and Instrumentation
Cryomodule Assembly Plan
Presentation transcript:

Jozef Žižňovský Stakčín, December 2012 PROJECT OF THE 130 cm TELESCOPE FOR THE SKALNATÉ PLESO OBSERVATORY Jozef Žižňovský Stakčín, December 2012

The described system consists of a 1 The described system consists of a 1.3m alt-az mounted Cassegrain-Nasmyth telescope with two Nasmyth focal stations. Both Nasmyth focal stations are equipped with a field derotator. It contains a control system and a software communicating with the dome control unit and a meteostation. In principle it is a robotic telescope. Manufacturer and supplier: ASTELCO Systems GmbH, München Instruments in the foci: CCD camera for near UV, visual and red spectral region IR CCD camera for infrared region Echelle spektrograph It will be provided in the frame of the European Regional Development Fund in three steps: 1. Telescope: till the end of 2013 2. Dome computerisation : 2013 3. Focal instruments and infrastructure: Spring 2014

Al (Aluminium) + protection layer 1. TELESCOPE 1.1. Optics Main mirror M1, free aperture ~ 1 300mm Main mirror M1, mechanical diameter ~ 1 310mm Main mirror M1, focal ratio F/2.8 * System focal ratio F/8 Wave front error  /6 at 633nm RMS Field of View at Nasmyth focus > 0.5 deg Mirror material Zero Expansion Glass (Zerodur or Astro Sitall) Mirror coating Al (Aluminium) + protection layer Mirror reflectivity R > 94%

The primary mirror is a thin low expansion glass meniscus. Its shape and optical performance therefore has to be actively controlled during the observations. The active mirror support system consists of a combination of an 18 point whiffle-tree support and 9 axial actuators. The actuators are controlled by a Shack-Hartmann sensor unit as a part of the telescope system, like the autofocus thermal control. The Shack-Hartmann unit allows checking the online alignment performance of M1 and M2 mirrors and helps to regain the collimation of the optics after recoating. The primary mirror is fixed radially by a 4 point preloaded spring pad system, which guarantees the permanent position of M1 during all telescope movements between zenith and horizon positions as well as at high slewing rates of the telescope. The surface accuracy of the optical system will be proven by interferograms at factory acceptance. At final acceptance, there will be on-sky tests carried out at the Observatory with the supplied Shack-Hartmann sensor unit available at the Nasmyth focal station.

2. Mechanics 2.1 Dimensions Maximum height (tube in vertical position)* 440 cm** Minimum height (tubus in horizontal position)* 300 cm** Optical tube lengths Maximum radius of movement (horizontal position) 215 cm** Required concrete foundation diameter Total weight of the telescope in basic specification ~ 7 t * Calculated from the lower surface of the telescope basis ** Dimensions after the preliminary design phase

2.2 Telescope structure The structure of the telescope is a special, super-compact “ASTELCO Design”. The telescope tube is a welded Serrurier truss design made from steel. This guarantees a minimal and predictable bending of the tube. All welded parts of the telescope are annealed to relax tensions. This very stiff and rigid design reaches high values for the eigenfrequencies of the system and therefore allows observing at wind speeds up to 15 m/s. The telescope’s central part connects the upper and lower truss sections and holds the combined motorized M1/M3 mirror doors. This section connects the tube assembly by means of two hollow flanges to the fork arms of the mount. Through these hollow flanges the light path of the telescope is sent to one of the 2 Nasmyth foci. A motorized rotating and self-centering M3 unit is provided to reach both Nasmyth foci by software control. Rapid and precise focus change between the two Nasmyth foci gets a simple standard task to be able to use two different instruments at two foci at practically the same time. The lower Serrurier truss part holds the mirror cell with the M1 primary mirror. The mirror cell allows easy access for maintenance – for mounting and dismounting the primary mirror a special ASTELCO tool is supplied.

M2 M3 M1

2.3 Telescope mount and drives The tube assembly is mounted between both fork arms of the alt-az mount. The fork arms are connected to the mounting base plate. On the upper end of the fork arms the bearing housings, the encoders and the motors are located. The accuracy of the perpendicularity of axes is < 10 arc sec; residual errors are corrected by the software. Slewing speed* 20°/sec 20°/sec Absolute pointing accuracy < 5 arcsec RMS Differential pointing accuracy < 0.2 arcsec RMS Tracking accuracy without autoguider < 0.5 arcsec/10 min Tracking accuracy with autoguider < 0.25 arcsec/10 min Effective encoder resolution 328 increments per arc sec (0.003 arc sec / increment)

FOCAL INSTRUMENTS CCD camera for near UV to red spectral region Quantum efficiency in the interval of 400-760nm: 80% Sensor size 10k x 10k, class: 1 Pixel size: 8-10 µm Interface for communication with the computer via fiber optic cable (1 Gbit) Dark current maximum: 0.01e‐/pixel/sec Readout noise: less than 5e- (rms) 16 bit AD converter Cooling with cryotiger to < -100° C Example: Spectral Instruments 1110S http://www.specinst.com/Brochures%20Rev%20A/1100S-camera-broch_RevA.pdf

2. IR CCD camera for near infrared region Quantum efficiency in the interval of 900-2 300nm: 70% Sensor size 2k x 2k, HgCdTe technology, class 1 Pixel size: 15 µm Dark current maximum: 0.01e- /pixel/sec Readout noise: less than 20e- (rms) 16 bit AD converter Cooling with a Stirling engine to 70° K (-203° C) without the necessity of liquid Nitrogen use Example: Teledyne Scientific (Manufacturer and supplier of detectors for the Hubble Space Telescope and the James Webb Space Telescope) http://www.teledyne-si.com/infrared_visible_fpas/index.html

3. Spectrograph Hihg-dispersion échelle spectrograph to the Nasmyth focus: R = 40 000 for seeing 3" Spectral region: 400-760nm CCD camera 2k x 2k Calibration lamps for ThAr line spectrum and continuum light Interchangeable slits (apertures) Software for remote control of the spectrograph and its CCD camera Manufacturer, contractor: Lasertechnik Berlin Subcontractor: Hamburger Sternwarte

Thank you for your attention!

Price (incl. VAT): Telescope 1 030 000 € Dome automatization 53 500 € Spectrograph 480 000 € CCD camera 340 000 € IR CCD camera 590 000 € Coating unit for the 130 cm mirror 280 000 € Fiber optic cable from Poprad 124 000 € Data storage devices 36 000 € Diesel-electric generator 15 000 € ∑ 2 948 500 € Sponsored by: European Regional Development Fund, 100%