E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
2014/3/25TTC Meeting Radiation measurement and comparison between VT/CM tests at KEK-STF Kirk.
Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Field emission issue and strategy to improve H. Hayano.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Recent Result for the STF-2 Cryomodule Operation
ILC10 Beijing Global Design Effort
Degradation and Recovery of Cavity Performance
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Cost reduction activities in cavity fabrication at MHI
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
WG3: Main Linac SCRF(cavity,cryomodule)
Degradation and possible sources Statistic of resonators
KEK injector cryomodule
Performance Degradation cERL Injector Cryomodule
IHEP Cryomodule Status
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
TTC Meeting, July , Saclay, France.
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 2 Vertical test results of four STF-1 cavities STF-1 ; MHI-01 cavity MHI-02 cavity MHI-03 cavity MHI-04 cavity High power tests of STF-1 cryomodule in Sept.~ Dec

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 3 High power test results in STF-1 cryomodule Ave. Eacc,max (V.T) = 22.7 MV/m Ave. Eacc,max (C. T) = 23.7 MV/m No degradation in Eacc,max from VT was observed in the cryomodule tests. Operational gradient for ILC

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 4 Comparison of Eacc,max between VT and CT Qo drop at high gradients due to field emission was observed in the cryomodule tests. Heavy x-ray radiation due to field emission was observed with increase of Eacc. We need more careful work in a clean room and in the tunnel to avoid dusts contamination during the assembly.

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 5 FNAL DESY KEK Vertical test results of eight S1-G cavities

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 6 Comparison of Eacc,max between VT and CT High power tests of the S1-G cryomodule start very soon. Results of achieved Eacc,max will be added in this figure.

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 7 Calibration of Q t, Q HOM1, Q HOM2 in S1-G Cavity Q t (CT ) Q t (VT) Difference Q HOM1 Q HOM2 1.C1/AES x x % 6.08 x x C2/ACC x x % 9.45 x x C3/Z x x % 9.23 x x C4/Z x x % 4.93 x x A1/MHI x x % 1.90 x x A2/MHI x x % 1.53 x x A3/MHI x x % 9.27 x x A4/MHI x x % 9.96 x x10 13 difference of Q t = -20 / +28 % Q HOM1, Q HOM2 > 1 x10 12, OK accuracy of Eacc = -/+ ~10 % The cause of the difference should be investigated. Beam calibration will be useful.

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 8 Calibration of Q t at DESY by D. Kostin (DESY) ?? +32% -16% +48% +13% -14% -26% +53%

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 9 SUMMRY There was no severe degradation of the Eacc,max from V.T to C.T in four STF-1 cavities at KEK. Qo drop with heavy x-ray due to field emission was observed in #2 cavity at high gradients. More careful clean work in a clean room and in the tunnel is needed to avoid dusts contamination during the assembly. Results of eight cavities in S1-Global will be obtained in the end of September.