HBD Meeting 4/25/06 SB and BNL Crew. 4/25/06 B. Azmoun 2 Installation of HBD into PHENIX Transported HBD from USB under gas (CF4) flow (maintained ~ 1Torr.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Activities During 4/11/07 IR Access HBD Working Group Meeting 4/17/07 B.Azmoun, T.Hemmick, J.Kamin, S.Stoll, C.Woody Brookhaven National Lab / SUNY SB.
Benji Lewis APS April Meeting Hadron Blind Detector implementation during PHENIX Run-10 Benji Lewis On behalf of the PHENIX Collaboration.
1 HBD Update Itzhak Tserruya DC meeting, April 9, 2008 April 9, 2008.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
Sourav Tarafdar Banaras Hindu University For the PHENIX Collaboration Hard Probes 2012 Measurement of electrons from Heavy Quarks at PHENIX.
CsI Photocathode Production and Testing
HBD Operation in Run 9 Thomas K Hemmick for the HBD Crew.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
1 Stony Brook Update: A bit more on Negative Ions T.K. Hemmick for the Tent Crew.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
Scintillation Cube Tests HBD Meeting 3/18/08 A.Caccavano & B.Azmoun, C.Woody.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
1 HBD Run7 Report T.K. Hemmick for the HBD crew PHENIX Collaboration Meeting, Boulder, July 12, 2007.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 55 Fe Simulations under the divine guidance of Sauli’s “Bible” Jason for the SB Tent Crew Mar 11, 2008.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
10/26/06Takao Sakaguchi, BNL1 Hadron Blind Detector for the PHENIX experiment at RHIC Takao Sakaguchi Brookhaven National Laboratory For the PHENIX Collaboration.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Pe Collection Efficiency in CF4 Revisited HBD Meeting 04/15/08 B.Azmoun, A.Caccavano BNL.
Triple GEM Beam Test within PHENIX DC Upgrades Meeting 4/14/04 B. Azmoun PHENIX Brookhaven National Lab.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 Two-phase Ar avalanche detectors based on GEMs A. Bondar, A. Buzulutskov, A. Grebenuk, D. Pavlyuchenko, Y. Tikhonov Budker Institute of Nuclear Physics,
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
Gain Curves Jason for the SB Crew June 5, Raw 55 Fe Spectra Start with 55 Fe spectrum from a MCA. Fit peak to gaussian. Calibration from a pulser.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
1 A two-phase Ar avalanche detector with CsI photocathode: first results A. Bondar, A. Buzulutskov, A. Grebenuk, D. Pavlyuchenko, R. Snopkov, Y. Tikhonov.
Measurements of low mass e + e - pairs in p+p and Au+Au collisions with the HBD upgrade of the PHENIX detector Mihael Makek Weizmann Institute of Science.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
SRS Calibration Part II: Dynamic Range, Signal/Noise, Pulse Shape and Timing Jitter + initial results from scan of FIT zigzag board Michael Phipps, Bob.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
R&D on Hadron Blind detector, recent results Issues addressed: - gain limits in CF 4 with heavily ionizing particles - operation.
Conditions at a potential location of a beam dump experiment at LCLS-II Clive Field, SLAC: 4/29/16.
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
Presentation transcript:

HBD Meeting 4/25/06 SB and BNL Crew

4/25/06 B. Azmoun 2 Installation of HBD into PHENIX Transported HBD from USB under gas (CF4) flow (maintained ~ 1Torr overpressure for ~ 2- 3hrs) Installation was difficult, but went smoothly…Don Lynch suggested the use of temporary lifting handles connected to mounting points during installation of final detector Flash Lamp Positioning HBD into place Also,15%  o Pb converter mounted over ½ area of GEM active area

4/25/06 B. Azmoun 3 HBD Hutch Set up Shop in Space beneath South-side stairs in assembly hall –Ultimately this space is for the Transmission monitor –Some gas flow controls & H2O and O2 monitors & P/T Monitor –2 signal cables + Pulser for PA + Flash lamp Trigger Pad “lucky” #13  Fe55 (2uCi source)  Masked from light Pad # 49  Open to light

4/25/06 B. Azmoun 4 Daily Checks Absolute 1 GEM voltage:  V = 495V –Gain consistent w/ USB measurements ~ 9x10 3 Flash Lamp test (PD mode, gain mode) –PD Flash lamp tests also consistent: pulse ~ 520mV in PD mode H2O & O2 –PPM levels seem to be a little higher at PHENIX than at USB…calibration error??? USB PHENIX

4/25/06 B. Azmoun 5 HBD Flash-lamp Event Display (pe signal avalanche through GEMs and map onto hex pads) Pad 13 shadowed by Fe55 2 known dead strips, but there are two others w/ position unknown Sum along strips Sum perp. to strips Known dead strips Known dead strips Possible position of unknown dead strips

4/25/06 B. Azmoun 6 Flash Lamp: Photon Flux Calc’s PD Mode: Entire PC (No Attenuator) –  I = 500mV/50ohm = 0.01C/sec –½ * 0.01 C/sec * 1.2usec = 6nC = 3.75x10 10 pe –3.75x10 10 pe / 0.3 (int. QE) =1.25 x10 11  (entire PC) –1.25 x10 11  (PC) *[1920 (Pad 49)/73317(PC)] = 3.27x10 9  pad #49) 3.27x10 9  pad #49) PC Lifetime…will the flash-lamp harm the PC? –Charge not to exceed 140uC/cm 2 –6nC/(25x25cm 2 ) = 9.6pC/cm 2 –Each test: ~2Hz for ½ hour = 3600 flashes –3600 flashes * 9.6pC/cm 2 = 34.6nC/cm 2 (each test) –# of tests before PC degradation: (140uC/cm 2 )/(34.6nC/cm 2 ) > 4000 tests > 4000 tests Gain Mode: Monitor single pad # 49 (GEM Attenuator) –PA signal (pad #49) = Gain ~ 250 (  V = 427V) –PA calib.: 2000e-/mV –1920mV * 2000e-/mV = 3.8x10 6 e-’s  3.8x10 6 e-’s / 250 = 1.5x10 4 pe’s –1.5x10 4 pe’s / 0.3 int. QE = 5.12x10 4  (pad #49) Attenuation Factor from 3GEM at Pad #49 –3GEM Attenuator: 5.12x10 4 , No Attenuator: 3.27x10 9  –Attenuation Factor: 3.2x10 9 / 5.12x10 4 = 6.25x10 4 –Attenuation per GEM: (6.25x10 4 ) 1/3 = 39.7 (Probably not this simple) Flash Lamp Pulse (Noise Free)

4/25/06 B. Azmoun 7 Beam Test: Preparation Noise (Baseline ~ 10-20mV p-p) Occasional Oscillating pulses (Corona?) PPM: H2O ~25ppm, O2 ~15ppm (total = 40ppm) Baseline Oscillating Pulses MIP/Fe55/ pe Pulses ~1pe/10ppm

4/25/06 B. Azmoun 8 Beam Test: First look at Signals (Qualitative Results) First Beam this past Saturday (4/22/06) Primary charge –MIP: 7kEv/cm * 3mm / (54eV e-ion pair) * (1.2 rel. rise) = 46.6 e- –Fe55 in CF4: 5.89keV x-ray/(54 eV/e-ion pair) = 109pe (Pad # 13 only) –Photoelectron yield (Cherenkov spectrum + CsI QE ): 36pe-s total  ~15-20 pe per pad max (Pad # 13 masked off) Rate of electrons  15% radiation length MIPS in 100um gap (1.6e-) Fe55 in 100um gap (109e-) Other particles MIPS in 3mm gap (46.6e-) Fe55 in DG (109e-) Other particles MIPS in 100um gap (1.6e-) Cherenkov (1-20max pe/pad) Other particles MIPS in 3mm gap (46.6e-) Cherenkov (1-20max pe/pad) Other particles FB  DG=0.8kV/cm  Loss of pe coll. Efficiency?

4/25/06 B. Azmoun 9 Fe55 Spectrum w/ HBD in IR: Beam Off Peak of spectrum is centered on ~109pe as expected  calibration check for previous measurements (assumed gain was 9.0x10 Vin= 3700V (  V=495V), DG = 0.8kV/cm )

4/25/06 B. Azmoun 10Outlook Quantitative Beam tests to determine N o (CF4) with HBD in “dead turtle” position – Method of normalizing and subtracting pad 49 spectra from pad 13 spectra Continue to monitor ppm’s  will increase flow rate if needed in order to improve gas purity. Looking ahead: if opportunity permits (during short access), we’ll connect to and check electronics chain, and possibly take data.