Anne M. Inman, P.E. Air Permits Division September 11, 2012.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Compliance Dates The final rule was published on January 25, 1995,
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
Common Permit by Rule Authorizations in Texas
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Methane Losses from Compressors Lessons Learned from Natural Gas STAR Technology Transfer Workshop Northern Natural Gas Company, INGAA, CECO, Heath Consultants,
1 Shale Gas Development/Production Activities and Air Quality Mike Abraczinskas, Deputy Director North Carolina Division of Air Quality Shale Gas Development/Production.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Colorado Reg Revisions
Air Permitting in Louisiana & Texas a guide to compliance requirements presented by: Shonta’ Moore, MS Air Permitting Specialist - Environmental Division.
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
“Partner Experiences” Pioneer Natural Resources, USA Presented by James Meier Processors Technology Transfer Workshop September 23, 2004 Dallas, Texas.
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 1 Changes to Tank Degassing and Cleaning Rules Texas Association of Environmental.
Anne M. Inman, P.E. Manager, Rules Registration Section Erin Selvera, J.D. Special Assistant to Director Air Permits Division Texas Commission on Environmental.
Managing Oil and Natural Gas Emissions in Indian Country National Tribal Forum May 2015.
Oil & Gas Permitting Issues and Guidance Revisions Statewide and Jonah/Pinedale Development Area Mark Smith Wyoming DEQ/AQD.
WESTAR Oil & Gas Conference October 2008 Lori Bocchino Wyoming Oil & Gas Permitting and New Rule/Policy Revisions.
Directed Inspection and Maintenance (DI&M) Lessons Learned from Natural Gas STAR Partners Producers Technology Transfer Workshop Devon Energy and EPA’s.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett, Air Quality Team Leader URS Corporation Rocky Mountain EHS.
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
Mustang Watchdog April 22, 2014
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Company Reported Opportunities Technologies From Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and Pioneer.
Lessons Learned from Natural Gas STAR Offshore Technology Transfer Workshop Shell, GCEAG, API, Rice University and EPA’s Natural Gas STAR Program June.
Our Vision – Healthy Kansans living in safe and sustainable environments.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
Environmental and Clean Air Regulations M IDSTREAM E NERGY L AW C ONFERENCE : M EETING THE D EMAND FOR I NFRASTRUCTURE H OUSTON, T EXAS December 7, 2012.
Discovering New Opportunities for Reducing Methane Emissions Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production.
Producer Best Management Practices and Opportunities Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop Devon Energy Corporation.
The Paper and Other Web Coating (POWC) MACT – Executive Summary The executive summary is a power point presentation designed to be used for basic education.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
Control of Emissions of Sulfur Dioxide – LAC 33:III.Chapter 15 Dustin Duhon Air Permits Division Louisiana Department of Environmental Quality March 23,
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
1 Permit Exemptions Rule Revisions North Carolina Division of Air Quality Permit Exemptions Rule Revisions North Carolina Division of Air Quality Air Quality.
Emissions Banking and Trading (EBT) Overview/Update Melissa Ruano Air Quality Division Texas Commission on Environmental Quality Advanced Air Permitting.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Addressing Air Quality Impacts from Oil and Gas Development in Colorado WESTAR Conference October 23, 2008 Rose Waldman Colorado Air Pollution Control.
Best Operating Practices for Reducing Emissions F rom Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and.
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
New Air Quality General Permit G70-A Overview WVONGA Air Permitting Issues Seminar September 12, 2013 Oglebay Resort, Wheeling, WV Laura Jennings Engineer.
John Curtin Iowa Department of Natural Resources.
EPA Methane Regulations Details on the Final Rules and Summary of Impacts May 16, 2016 Producer: Claire Carter Edited by: Afzal Bari Director: Afzal Bari.
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
NSPS OOOOa Overview Photo from
ARB GHG Oil & Gas Regulation
EPA’S New Source Performance Standard (NSPS)
Addressing Costs of Methane Waste and Future Policy Actions
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Uinta Basin Industry BMPs Stuart Siffring
Presentation transcript:

Anne M. Inman, P.E. Air Permits Division September 11, 2012

 NSPS OOOO  NESHAP HH  NESHAP HHH

 Proposal August 23, 2011  Prepublication EPA Final Rule April 17, 2012  Federal Register Publication August 16, 2012  Effective Date October 15, 2012*

Affected Facilities Include : ◦ Natural Gas Well Completions ◦ Storage Vessels ◦ Pneumatic Controllers ◦ Centrifugal & Reciprocating Compressors ◦ Glycol Dehydrators ◦ Gas Plant Fugitives and Treatment Units

Regulations aimed at reducing Volatile Organic Compounds (VOCs) Applicability for natural gas wells Excludes crude oil wells Focuses on flowback period for fractured and refractured wells

◦ Phase 1: As of Aug 23, 2011 and before Jan. 1, 2015, operators must flare or use reduced emissions completions (RECs) (also known as green completions) unless combustion is a safety hazard or is prohibited by state or local regulations. ◦ Phase 2: Beginning Jan. 1, 2015, operators must capture the gas and make it available for use or sale, i.e. green completions and use combustion control unless combustion is a safety hazard or is prohibited by state or local regulations.

Green completions are not required for:  New exploratory (“wildcat”) wells or delineation wells (used to define the borders of a natural gas reservoir), because they are not near a pipeline to bring the gas to market.  Hydraulically fractured low-pressure wells, where natural gas cannot be routed to the gathering line. Operators may use a simple formula based on well depth and well pressure to determine whether a well is a low-pressure well.

 Refractured wells using green completions will not be considered to be “modified” if they meet notification and reporting requirements for new wells.  Refractured wells that flare are considered modified and thus subject to the NSPS requirements.

 Notify the Administrator in writing or by no later than two days before completion work begins  Compliance with state advance notification requirements satisfies the federal requirement  Options for notification in development by TCEQ and RRC

The final rule allows for individual well reports or company-wide reports following either of two options: 1. Traditional report: Must detail each well completion, and include information on compressors, pneumatic controllers, and storage tanks constructed, modified or reconstructed during the year. 2. List of all well completions with photographic documentation of each green completion at each site. The photo must include digital stamps the geographic coordinates of the well and the date of the well completion.

 After 8/23/11, any new, modified, or reconstructed storage tanks with VOC emissions of ≥ 6 TPY must reduce VOC emissions by at least 95%  Control Options 1. Route emissions to a combustion device or 2. Use vapor recovery (condensor)

Timing:  Applicable October 15,  Owners/operators at sites with no wells in production will have 30 days to determine the emissions from a tank; and another 30 days to install controls.

 Applicable to Permanent Tanks  Potentially Applicable to Portable Tanks ◦ If located on a site ≥ 180 consecutive days ◦ If temporary tanks removed before the 180 days, but other tanks return to the site within 30 days, the timing is not reset and the entire period applies ◦ Must maintain clear records of all temporary and portable tanks at a site

At oil and natural gas well sites from wellhead to processing plant: ◦ Applies to continuous bleed natural gas-driven pneumatic controllers with a bleed rate greater than 6 scfh between wellhead and natural gas processing plant if constructed or modified after 8/23/11. ◦ Applicable October 15, ◦ Exceptions for applications requiring high-bleed controllers for certain purposes, including operational requirements and safety.

 At natural gas processing plants: ◦ The VOC emission limit is zero. ◦ Compliance is required October 15, 2012.

 Does not apply to compressors using dry seals.  Requires a 95% reduction in VOC emissions from compressors with wet seal systems. ◦ Flaring, or ◦ Routing captured gas back to a compressor suction or fuel system

Two options for replacing rod packing:  Every 26,000 hours of operation (operating hours must be monitored and documented); or  Every 36 months (monitoring and documentation of operating hours not required).

At onshore natural gas processing plants: ◦ Requirements to reduce SO 2 emissions based on sulfur feed rate and sulfur content of acid gas. ◦ Increased emission reduction standard from 99.8% to 99.9% for units with a sulfur production rate of at least 5 long tons per day.

At onshore natural gas processing plants:  Enhanced Leak Detection and Repair (LDAR) requirements.  Lowered the leak definition for valves from 10,000 ppm to 500 ppm and requires monitoring of connectors, pumps, pressure relief devices. and open-ended valves or lines.  Increased recordkeeping and reporting.

 Large dehydrators: The final rule also retains the existing one-ton-per year benzene compliance option for large glycol dehydrators, meaning operators may reduce benzene emissions from large dehydrators to less than one ton per year as an alternative to reducing total air toxics emissions by 95%.

 Small dehydrators at oil and gas production facilities (NESHAP HH): ◦ Applies to glycol dehydrators with an annual average natural gas flowrate less than 85,000 scmd or actual benzene emissions less than 0.9 Mg/yr.  BTEX limits: ◦ New sources – 4.66x10 -6 g/scm-ppmv. ◦ Existing sources – 3.28x10 -4 g/scm-ppmv. ◦ Small dehydrators with annual average benzene emissions of less than one ton per year are exempt.

 Small dehydrators in the Natural Gas Transmission and Storage category (NESHAP HHH): ◦ Applies to dehydrators with actual annual average natural gas flow rate less than 283,000 scmd or actual average benzene emissions less than 0.9 Mg/yr  BTEX limits: ◦ New sources – 5.44x10 -5 g/scm-ppmv ◦ Existing sources – 3.01x10 -4 g/scm-ppmv

Compliance Deadlines: ◦ New small glycol dehydrators (commenced construction or reconstruction on or after 8/23/11) must comply immediately upon startup or within 60 days after the final rule is published in the Federal Register, whichever is later. ◦ Existing small glycol dehys that are subject to the MACT for the first time: 3 yrs +60 days after publication. ◦ Existing sources at production facility that constructed before 8/23/11, previously determined to be an area source, but becomes a major source on the 60th day after the effective date, due to the amendment to the associated equipment definition in 40 CFR Part 63, Subpart HH have 3 years +60 days after publication.

 Reducing VOCs from hydraulically fractured natural gas wells during flowback period. ◦ Phased-in applicability ◦ Exceptions for wildcat, delineation, and low pressure wells ◦ Includes Pre-completion Notification and Annual Reporting requirements  Reducing VOCs from storage tanks ◦ Includes temporary vessels if at site >180 days  Additional requirements: ◦ Centrifugal & Reciprocating Compressors ◦ Pneumatic Controllers ◦ Sweetening Units ◦ Glycol Dehydrators (small and large)

   Small Business and Environmental Assistance or  Air Permits Division Main Line (512)