PRO-PLAN Pulp Mill & Recovery Scheduling System. PRO-PLAN - Pulp Production The Pro-Plan Pulp Mill & Recovery Scheduling System is a short to medium term.

Slides:



Advertisements
Similar presentations
Network Models Robert Zimmer Room 6, 25 St James.
Advertisements

Network Models Robert Zimmer Room 6, 25 St James.
Network Models Robert Zimmer Room 6, 25 St James.
MATERIAL STORAGE SYSTEMS Gülşah GEDİK
Aggregate Capacity Planning Lecture # 5 Aggregate Capacity Planning Lecture # 5.
Infor Integrated Business Planning
Topics to be Covered 1. Capacity Planning
1 Bruce Bowhill University of Portsmouth ISBN: © 2008 John Wiley & Sons Ltd.
Teodor Măluţan Technical University of Iasi Modeling and Simulation of Delignification Process.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
NetWORKS Strategy Manugistics NetWORKS Strategy 6.2.
Strategic Capacity Planning & Aggregate Planning
4 Intelligent Systems.
Jones & Robinson: Operations Management All operations need to know the likely customer demand for their goods or services on any given day, week or year.
Performance Measurement and Management IACT 418 IACT 918 Corporate Network Planning.
INDUSTRIAL & SYSTEMS ENGINEERING
THEORY OF CONSTRAINTS PROF DR FILIP ROODHOOFT. © Vlerick Business School THEORY OF CONSTRAINTS Philosophy Optimise the performance by managing the bottlenecks.
capacity planning and control
Discuss….. Thought for the day:. External costs and benefits Appreciate the concepts of social costs and benefits Understand the difference between a.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Throughput Accounting
Production planning and control is the organization and planning of the manufacturing process. It co-ordinates supply and movement of materials and labor,
INTRODUCTION TO MANUFACTURING & OPRATIONS MANAGEMENT BY AMAR P. NARKHEDE.
Chapter 2 Supply Chain Strategy. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain how.
How to maximise the profit from customers & products in cement plants George Handley MBA Management Consultants.
ANDY SIMPSON SUPPLY CHAIN DIRECTOR WARRANT GROUP LIMITED.
P.Chandiran.  Cores  Remanufactured parts  New parts  OEM parts.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
Profile Solutions Ltd. In Partnership with it’s Clients SIMCAP® Capacity Simulation and Business Modelling.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
1 The Dual in Linear Programming In LP the solution for the profit- maximizing combination of outputs automatically determines the input amounts that must.
Contents Introduction Aggregate planning problem
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
Manufacturing Plant maintenance Materials management Quality management.
UBC Mechanical Engineering CFD Modeling Group Dr. Martha Salcudean Weyerhaeuser Industrial Research Chair Fellow C.S.M.E., F.C.A.A., F.R.S.C. Dr. Ian Gartshore.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Intelligent Supply Chain Management Strategic Supply Chain Management
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
PROMISE Contribution Margin Analysis July, The Next Level is Closer Than You Think Renaissance E XECUTIVE F ORUMS  Key Financial Management Concept.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
RCM – The Elements Most Organisations Miss by Peter Ormond.
Operations & Logistics Management Lesson 7- Process Design & Lesson 8- Capacity & Buffering Operations.
Global experience of automating irrigation systems Sumith Choy 07 Apr 2016.
Budgeting THE TIMES 100. What is a budget? A budget is a forward financial plan. Budgets can be drawn up for: Income Expenditure Profit Cash flow Output.
Enterprise Resource Planning, 1st Edition by Mary Sumner
Manufacturing Simulation Case Studies
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Empowering People & Machines to Make Superior and Reliable Decisions
Viewing Data-Driven Success Through a Capability Lens
GENESYS Redevelopment Strawman Proposal
Chapter Five Planning and Control.
Introduction to Economics of Water Resources Lecture 5
Treatment – Chlorine Disinfection
Indus Momentus Business Solutions
How to maximise the profit from customers & products in cement plants
Artificial Intelligence in Manufacturing
Outline Introduction to Constraints
Spillage and Material Handling Systems
Enterprise Resource Planning, 1st Edition by Mary Sumner
Goldratt's Theory of Constraints (TOC)
Production Planning & Control
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Slide 1. Machine Capacities
Real Time Engineering Slab & Coil Yard Management and Plate Stock Report , Planning, Production, Reporting & Data Base Management Solution for Metal Industry.
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

PRO-PLAN Pulp Mill & Recovery Scheduling System

PRO-PLAN - Pulp Production The Pro-Plan Pulp Mill & Recovery Scheduling System is a short to medium term scheduling and simulation system to determine the maximum Pulp Mill production rate consistent with constraints on: pulp demand and storages, weak black liquor storage and evaporator throughput, and white liquor supply.

Applicability It is especially useful when two or more pulp lines are vying for a limited supply of white liquor, or limited black liquor processing capacity. Rules are employed to determine priorities and allocate available capacity logically.

Recovery Throughput It will also calculate the appropriate production rates for evaporators, recovery boilers, recausticizers and lime kilns to achieve and maintain the optimal levels in WBL, SBL, Green Liquor and White Liquor storages. Evaporators Recovery Boilers GL Clarifier

It is intended as an aid to mill coordinators, and Pulp Mill, Recovery and Recaust. operators to determine the most appropriate production rates for maximising production and minimising rate changes. Causticizers WL Clarifier GL Clarifier Lime Kiln Mill Coordination

With no constraints, the model will calculate production rates to achieve and maintain the levels in the pulp silos and liquor storages that will best cope with unplanned shuts upstream or downstream of each storage. This is based on the probability of plant downtime upstream and downstream of each storage. Optimal Production Rates

Pro-Plan Demands Constraints Demands Constraints Maximise Available Capacity Minimise Rate Changes Better Storage Management Reduced Inventory Increased Production Uniform Quality Less Shuts Lower Costs Results

If there is a mismatch in pulp demand and minimum or maximum production, best use will be made of the available capacity in the storages to maintain production. Constraints include white liquor supply, black liquor processing, or plant throughput. The plant bottleneck may change from day to day. If pulp mill production is limited by white liquor supply or evaporator throughput, the maximum production rate is calculated according to the current priorities and available capacity in the white liquor or WBL systems. Constraints

The system also determines whether: washer Dilution Factors need to be changed to reduce WBL volumes, evaporator performance has degraded and the WBL system has capacity for an evaporator wash. recycling of strong black liquor back to the weak black liquor system is required. Other Functions

PRO-PLAN I/O The Inputs are: Paper machine making plans Planned Shuts Current stocks Restrictions Plant reliabilities The Outputs are: Optimal levels Optimal production rates Predicted levels Predicted stocks

The Business Case How often does the digester need to shut or slowdown due to a breakdown or restriction in another area? How is the new rate determined? What is the lost opportunity? How are tank level and stock level targets set now?

Financial Benefits The financial benefits from using the PRO-PLAN Pulp Mill Scheduling System will vary from mill to mill, and are dependent on the types of constraints and the method of operation of the mill prior to using the system. Typical improvements might be: Better utilisation of capacity Increased production of 1% of 500 tonnes/day for 350 $200 margin = $ 350,000 p.a. Better storage management If there are 10 unscheduled upsets per year, and the storages are 5% closer to optimal levels: 10 x 5% x 500t x $200 = $ 50,000 p.a.

Pro-Plan has been developed using Gensym’s G2 platform. G2 is a graphical, object-oriented “expert system” for building intelligent operations management applications. These applications reason about operational data in real time to provide advice and take corrective actions. G2 enables organisations to dramatically improve operational availability, safety and optimisation. G2

To discover more about Pro-Plan and its potential payback for your situation, contact Norm Lasslett at Procex on: Tel/fax: (613) Mobile: Procex Pty Ltd ACN Balmoral Avenue Brunswick East, Australia 3057 Contact Procex

Advanced Process Control Manufacturing Decision-Support Scheduling & Optimisation Expert Systems Neural Networks Control Systems Audits For Process Excellence Procex Pty Ltd