Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/2003 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Layout of the Power Distribution on Support Tube for Phase I Lutz Feld, Waclaw Karpinski, Katja Klein, Jan Sammet, Michael Wlochal.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
EE: Servicetype#cablesL avg L tot Costs est [ksfr] LV50mm 2, (1) (US?) EE fibres yellow ribbons US HV (SCEM ) 25 (13+12)
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
EE mappings for PTM/HM probes S.Zelepoukine 16.Jun.09.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Duct numbering for EE- Wolfgang Funk - CERN CMS 12/05/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010.
LV-HV cable reuse for the Si Tracker Being worked out with S. Wenig.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Update of MVD services and requests
Beam
- CT INSTALLATION PROCEDURE OVERVIEW -
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Mini-drawers, FE-ASIC , Integrator
FCC Tunnel and Shaft Cross Sections
HPS Motherboard Electronic Design
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
Presentation transcript:

Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1

Wolfgang Funk - CERN CMS 23/09/2003 Duct 05.A Duct 05.B LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 2*9 (128) LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 2*9 (128) B ret OF 15*4.3X2 (129) HV 37*3 (262) Sniff 1*6 (29) P F 14/23 P ret LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) sn N2 Sum: (2070) Sum: (1528) Similar to Duct 03.B Similar to Duct 03.A View towards I.P. for EE+ View from I.P. for EE- Duct 06.B Duct 06.A 2

Wolfgang Funk - CERN CMS 23/09/2003 Duct 04.A Duct 04.B LV 6*7.4 (259) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 2*9 (128) LV 12*7.4 (518) HV 2*15.3 (368) signal 4*9 (256) P F Pret HV 37*3 (262) CO 1*14 is (314) OF 15*4.3X2 (129) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) P F Sum: (1847) Sum: (2008) Similar to Duct 02.A Similar to Duct 02.B Duct 07.B Duct 07.A 3

Wolfgang Funk - CERN CMS 23/09/2003 Duct 03.A Duct 03.B LV 6*7.4 (259) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 2*9 (128) LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) Signal 2*9 (128) OF 15*4.3X2 (129) HV 37*3 (262) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 is (255) CO 1*14 con (154) OES R P F Pret BF OES F FES F Sum: (2070) Sum: (2532) Similar to Duct 05.B Similar to Duct 05.A Duct 08.B Duct 08.A 4

Wolfgang Funk - CERN CMS 23/09/2003 Duct 02.A Duct 02.B LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 2*9 (128) LV 12*7.4 (518) HV 2*15.3 (368) OF 3*4.3X2 (27) signal 4*9 (256) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) CO 2*14 is (628) Laser 1*10 (79) OF 15*4.3X2 (129) Co 1*14 (154) P F MEM 12*2.2 (46) MEM 2*1.5X2 (6) HV 37*3 (262) Note: additional cables between MEM and balconies: LV 4*5 (88), Ving 1*5 (22), OF 2*4.3X2 (128) MEM cables (MEM 12*2.2 (46) and MEM 2*1.5X2 (6) are only between MEM and Dees Sum: (2473) Sum: (2659) Sum: (2153) Similar to Duct 04.B Similar to Duct 04.A DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 09.B Duct 09.A 5 P F ret B

Wolfgang Funk - CERN CMS 23/09/2003 Duct 01.A CO 1*71 (3960) Duct 10.B 6

Wolfgang Funk - CERN CMS 23/09/2003 Duct 01.B CO 1*71 (3960) Duct 10.A 7

Wolfgang Funk - CERN CMS 23/09/2003 Duct 18.B LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 2*9 (128) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Sum: (2153) Similar to Duct 16.B Duct 11.A Duct 18.A CO 2*14 is (628) Co 1*14 (154) P F HV 37*3 (262) OF 15*4.3X2 (129) Sum: (2351) Similar to Duct 16.A Duct 11.B 8 P F LV 12*7.4 (518) HV 2*15.3 (368) OF 4*4.3X2 (36) signal 4*9 (256) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) ret B

Wolfgang Funk - CERN CMS 23/09/2003 Duct 17.A LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) Signal 2*9 (128) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) P F Pret Sum: (2070) Similar to Duct 15.A Duct 12.B Duct 17.B LV 6*7.4 (259) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 2*9 (128) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 con (113) CO 1*14 con (154) OES R BF OES F Sum: (2382) Similar to Duct 15.B Duct 12.A FES R 9 OF 15*4.3X2 (129) HV 37*3 (262)

Wolfgang Funk - CERN CMS 23/09/2003 Duct 16.A LV 12*7.4 (518) HV 2*15.3 (368) signal 4*9 (256) P F Sum: (1847) Similar to Duct 18.A Duct 13.B Duct 16.B LV 6*7.4 (259) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 2*9 (128) P F Pret LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Sum: (2008) Similar to Duct 18.B Duct 13.A 10 HV 37*3 (262) CO 1*14 is (314) OF 15*4.3X2 (129)

Wolfgang Funk - CERN CMS 23/09/2003 Duct 15.A LV 6*7.4 (259) OF 2*4.3X2 (18) signal 2*9 (128) 14/23 P ret LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) Sum: (1886) Similar to Duct 17.A Duct 14.B Duct 15.B LV 6*7.4 (259) HV 1*15.3 (184) OF 1*4.3X2 (18) signal 2*9 (128) B ret HV 37*3 (262) OF 15*4.3X2 (129) Sniff 1*6 (29) P F CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) sn N2 Sum: (1641) Similar to Duct 17.B Duct 14.A N2/sniff 1*12 (113) N2 Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter) 11

History Wolfgang Funk - CERN CMS 23/09/ Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes). 2.Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over ring flange bean. 3.Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings. 4.Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings. 5.Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in 9B- /11A-, no overall cross section increase. New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03: New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony: 1.2 more LV EE cables each in ducts 7B-,9B-,11A-,13A-. New version 11/8/03 to increase space in ducts for ES cooling pipes. 1.Move EE backplate return pipes from 10B-/10A- into 9A-/11B-.

History(2) Wolfgang Funk - CERN CMS 23/09/ Remove one OF from of 9A-. 2.Remove separate LV cables for controls 14A- (are part of standard LV system) New version 23/9/03 to adapt latest version of ES services: