Disaster Management Plan S.VENUGOPAL, Manager(HSE)

Slides:



Advertisements
Similar presentations
EMERGENCY PREPAREDNESS B Y : Mr. P. K. Patel.. Plant Emergency Manual * Major hazards of plant in terms of raw materials, processes, equipments, chemical.
Advertisements

Disaster Management Plan for
Airport Emergency Plan - Overview
There are three types of emergencies:  Internal  External  Natural disasters.
Emergency Action Plans
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
Incident Command System
Implementation of the Seveso II Directive 96/82/EC Institutional Strengthening of the Slovak Environmental Agency Emergency Response Principles and Practice.
1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
JFK MEDICAL CENTER Disaster Drill Friday, July 11, HRS.
Manitowoc County Mass Casualty Disaster Plan Disaster Supplies 1. Cleveland First Responders - Cleveland 2. Kiel Ambulance Service - Kiel 3. Mishicot.
Chapter 29 Mass-Casualty Incident Management. Chapter 29: Mass-Casualty Incident Management 2 Discuss the various environmental hazards that affect the.
Emergency Preparedness Planning Kentucky Education and Workforce Development Cabinet.
(ARF DiREx 2015) (ARF DiREx 2015)
1 Emergency Management at UWS Presented by: Glenn Cooper.
Management of Major Emergencies Training & OIM Assessment.
ESO Documentation and Considerations for Major Emergencies
BY Prashant P. Rane Safety, Health & Environment Gadegaon.
1 Emergency Planning Simulation 2 1.The timer is more psychological than actual. There is no time limit. However, can total lapsed time be determined and.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
Emergency Response & Control Procedure Emergency Response and Control Procedure (HSE-S-229) Best ERCP practices at RIL Jamnagar.
LNG Hazards.
Contractor Safety Training | Westbrook | 1 Emergency Response.
Disaster Management Plan
Duke University Contingency Plan
NEW DEVELOPMENTS AFTER TSUNAMI SRI LANKA.
The World Leader in High-Performance Signal Processing Solutions Emergency Response Teams Ron Scholtz- CHMM, REA Analog Devices, Inc. October 7, 2003.
ISO EMERGENCY PREPAREDNESS AND RESPONSE
SAFETY PRACTICES & OISD NORMS.
Aerobus Safety & Security Proactive Measures to assure Aerobus passenger and system Safety & Security.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
ONSITE EMERGENCY MANAGEMENT PLAN. DISASTER Disaster in industry may be defined as one or more emergencies which can affect several or all plants / departments,
INTRODUCTION TO LAW, PUBLIC SAFETY, CORRECTIONS AND SECURITY.
KOC General Emergency Procedure General Emergency Procedures 1. Introduction 2. Objectives 3. Procedure to Ensure Readiness 4 Classification of Emergencies.
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
Dispatching Operations Department of Transportation Project DISPATCHERS.
“ GIS Based Emergency Response Support System of RGTIL – EWPL ” 16-Oct-15.
High Rise October DISPATCH E82, E83, E81, E97, E86, E95, T82, T98, R81, R83, R97, B8, B9, OSO respond to a reported structure fire at 777 W. Lake.
Staff Induction Fire and Emergency Nick Giles OHS Manager.
OPERATION CERT Disaster Preparedness Exercise Campo, CA October 21, 2006.
“ GIS Based Emergency Response Support System for EWPL Emergencies”
Coastal Conflagration An Island Evacuation Tabletop Exercise Copyright - Disaster Resistant Communities Group – Final Planning Conference.
Office of State Fire Marshal Oregon State Police Creating Opportunities For Improvement In Preparedness And Response Community Capability Assessment.
Tybee Island Fire Department Quarterly Report Jan. thru Mar
EveNT PRODUCTION: Operations, Equipment, Facilities, Health & Safety
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
TABLE TOP EXERCISE CHEMICAL(INDUSTRIAL) DISASTER BANGALORE (RURAL), KARNATAKA 20 December 2008.
T.I.C. - Today and in the future Charlotte von Scholten Head of the Traffic Information Centre.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
DSHS Deployable Teams. Deployable Teams 2011 Medical Incident Support Team - M-IST Ambulance Staging Manager - ASM Ambulance Strike Team Leader - ASTL.
Emergency Preparedness Emergency Action Plan – EAP Emergency Operating Procedure - EOP Do you have a written plan? Yes – Retained in Human Resources.
Incident Reporting And Investigation Program
2011 Annual Report.
District’s Plan for Disaster Preparedness.
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
Emergencies & Emergency Response
Introduction The Emergency Action Plan (EAP) for CSP includes the following sections: Contact Information and Emergency Response Procedures Fire Emergency.
FEED BACK & MONITORING PROCESS
Incident Reporting And Investigation Program
Best ERCP practices at RIL Jamnagar
Nuclear Emergency Planning and Preparedness
ESHAC 9 Emergency Contingency Plan
Health and Safety - Richard Quenby
Presentation transcript:

Disaster Management Plan S.VENUGOPAL, Manager(HSE) Emergency Response & Disaster Management Plan PETRONET LNG LIMITED Dahej S.VENUGOPAL, Manager(HSE)

Petronet LNG is India's first LNG Terminal at Dahej

LOCATION OF DAHEJ

FACTORY LAYOUT JETTY FACTORY BOUNDARY N Petronet North Gate (Main Gate) South Gate T 101 T 102 T 103 T 104 TLF ECC 1 ECC2 FACTORY LAYOUT

Emergency Control Centre (ECC-1)

Emergency Control Centre (ECC-2)

EMERGENCY RESPONSE TEAM (ERT) 3.5.1 Control Room panel operator 3.5.1.1 Plant operator 3.5.2 Chief Incident Controller (CIC) 3.5.3 Site Incident Controller (SIC) 3.5.4 Fire & Rescue Coordinator 3.5.5 Medical Coordinator 3.5.6 Security Coordinator (Evacuation and Traffic control) 3.5.7 HSE Coordinator 3.5.8 Gas Monitoring Coordinator 3.5.9 Communication Coordinator 3.5.10 Transport & Logistics Coordinator 3.5.11 Demolition & Reconstruction Coordinator 3.5.12 HR & Welfare Services Coordinator (Relief & Rehabilitation) 3.5.13 Public Relation and Mass Media Coordinator 3.5.14 Technical Coordinator 3.5.14.1 Operations Coordinator 3.5.14.2 Port Operations Coordinator (In Case of Port operation emergency) 3.5.14.3 Maintenance (Electrical, Mechanical & Instrument) Coordinator 3.5.15 Recorder 3.5.16 Messenger

COMMUNICATION SYSTEM Automatic Fire Gas Spill Detection System Automatic Smoke and Heat Detection System Manual Call Points (MCP) Portable Radio sets (Walkie Talkie) Public Address System Paging System Telephones Emergency Sirens Messengers

Reliance Industries Ltd. Gujarat Alkalies & Chemicals Ltd. Mutual Aid Support Petronet LNG Ltd. Reliance Industries Ltd. Gujarat Alkalies & Chemicals Ltd. Hindalco (Aditya Birla Copper) Gujarat Chemical Port Terminal Company Ltd. ONGC (C2-C3 extraction plant)

Approach Route to Plant RIL Birla Copper GCPTCL Welspun Sarasawati Township DMC C/R Route MAP to Petronet LNG Adani Petronet ONGC C2C3 GACL GFL Petronet LNG

Rehabilitation Camp Route Center Rehabilitation Camp Route Lakhigaon School GCPTCL Plant RIL Rehabilitation from Adani Petronet & Lakhibaba temple Adani Petronet Luwara School ONGC C2-C3 Plant Rehabilitation Center Assembly point PLL south gate

Fire Tender & Ambulance Route Route to PHC Dahej GCPTCL Plant Lakhigaon School Emergency Vehicle From Bharuch & near by factory Emergency Vehicle From GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant

Emergency Coordinator Team Approach route & Car Parking Lakhigaon School GCPTCL Plant Emergency Vehicle From Bharuch & near by factory Emergency Vehicle Form GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant Car Parking

OFF SITE EMERGENCY DRILL 19.02.2010

OFF SITE EMERGENCY DRILL Scenario: Leakage of LNG at TLF Skid from 4” LNG tanker feed pipeline at the upstream side of MOVP 13001. Location: Truck Loading Facility (TLF) Date & Time: 19.02.2010

Location of LNG Leak in TLF area Petronet Main Gate Petronet South Gate T 101 TLF Area FACTORY BOUNDARY

Main Control Room (ECC-1)

Main Control Room (ECC-1) in action

Emergency Control Centre (ECC-2) in action

Regular Updation of Situation in ECC-2

Assembly Point

Fire fighters in action at site

Fire Fighters in action

Rescuers in action

Observers at site

External Observers outside the plant

Medical Team in action

Medical Team in action

Mutual Aid Fire Tender Arrival

Mutual Aid Ambulance Arrival

Mutual Aid Support Team arrival

District Level Mutual Aid Support

Gas Monitoring Team in action

Gas Monitoring

Evacuation

Evacuation

Evacuation completed

Evacuation

Transportation to rehabilitation camp

Transportation of persons to camp

Vehicle Entering Rehabilitation Camp

Rehabilitation Camp - Luwara

Rehabilitation Camp - Luwara

Rehabilitation Camp - Luwara

Rehabilitation Camp - Luwara

Ambulance in Rehabilitation Camp

First Aid Centre in the camp

Final Debriefing Meeting

THANK YOU