NPP/C1/C2 Antenna Deployment Schedule (COPC 2009-1.1) and Reducing Product Delivery Latency and COPC 2009-1.2) Jim Vermeulen And Selina Nauman.

Slides:



Advertisements
Similar presentations
Ronn Ritke Tony McGregor NLANR/MNA (UCSD/SDSC) Funded by the National Science Foundation/CISE/SCI cooperative agreement no. ANI
Advertisements

Timing of Apportionments and Overview of the Exhibits Jim Austin April, 2014.
GCOM/AMSR2 status Earth Observation Research Center and GCOM Project Team Japan Aerospace Exploration Agency AMSR-E Joint Science Team Meeting Huntsville,
NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key NOAA/NESDIS/Office of Research and Applications Madison, Wisconsin July 27, 2006.
Dave Ector COSMIC PM for OSD 4 November 10
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
CS 501: Software Engineering
MWR Algorithms (Wentz): Provide and validate wind, rain and sea ice [TBD] retrieval algorithms for MWR data Between now and launch (April 2011) 1. In-orbit.
Filename.ppt 1 NOAA Direct Broadcast Data Initiative to Meet NWP Latency Requirements NOAA WP-13.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Update: NPOESS and CDRs Florence Fetterer, Program Manager, NOAA at NSIDC PoDAG XXIII February 2005.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 13 November 2008.
H-8 Project Update COPC May 27, H-8 Project Update JMA planning for full H-8 operations in July 2015 – Commissioning progressing well Data quality.
CPU Sizing vs. Latency Analysis FTS EDR Latency Simulation 5 March 2008 Doug Shannon.
NOAA Satellite Conference April 8-12, 2013 Mary Kicza Assistant Administrator for Satellite & Information Services.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
1 WFC 2015, Mexico Worldwide implementation of the PFMI Froukelien Wendt, Monetary and Capital Markets Department, IMF.
AWIPS-II Data Delivery Project Overview December 2013.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Jim Vermeulen 28 May 2008.
GEO ADC meeting, Sep 22-23, 2008 Slide # 1 AG AG Forest Mapping and Change Monitoring LoycheWilkie,Mette (FAO) Adam Gerrand (FAO) Ivan Petiteville,
1 MIMO/Stacking (Including Tx SET Version 2.0) Post Implementation Success Report.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
JPSS Common Ground System IDPS NPP Algorithm Operability Verification – Launch Build Characterization Tentative Agenda IDPS OAA 5/10/11.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T | Florida Relay TASA.
NDE Title Page NDE NPOESS Data Exploitation Jim Yoe, Implementation Coordinator NPOESS Data Exploitation (NDE) Project NESDIS Office of Systems Development.
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
JAG/ODAA Spring 2009 COPC Co-Chairs Satellite: Mr. James Vermeulen, FNMOC Conventional: Dr. Bradley Ballish, NCEP Exec. Secretary: Mr. Tony Ramirez, OFCM.
Slide: 1 Quality indicators in an operational precipitation product IPWG meeting 4 Beijing, October 2008 Presented by: Thomas Heinemann Meteorological.
BACKUP XDRs and NDE PRODUCTS Fall 2010 COPC Meeting (AFWA – Offutt AFB) Jim Vermuelen FNMOC - Data Ingest Team Supervisor WG-CSAB Member JAG/ODAA Co-Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
PMO Update to PRS Troy Anderson Program Management Office March 23, 2006.
1 NOAA/NWS Satellite Training Actions Update Anthony Moste k Office of Chief Learning Officer Chief, Forecast Decision Training Division (FDTD) Satellite.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
1 THE GOES N GENERATION SATELLTES April 27, 2004 Peter Woolner, Mitretek Systems.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
NOAA Plenary Agenda Item th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 NOAA Satellite and Information Service.
JPSS Common Ground System Block Build Plan Eric Ort IDPS Build Manager June JPSS CGS Form J /22/2010.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
DOD NPOESS Data Exploitation COPC Action Item ,11 Jim Vermeulen 21 October 2008.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 21 October 2008.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Contribution to the Implementation of the African Space Programme: EO Data and Infrastructure *9.a) space segment - available observations (space & in-situ.
JPSS Common Ground System Operational Algorithm Status – Launch Build Characterization Tentative Agenda IDPS OAA 4/5/11.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
GLOBALink/HF Data Link
Satellite Information Flow
SNPP Regional Retransmission Service: Plans and Status of Implementation Presented to CGMS-43 Working Group 1 session, agenda item 6.
Glendale Community College PeopleSoft Project Update
HIGHLIGHTS 2 ARGOS satellites decommissioned (NOAA 12 and 14)
NOAA Report on Satellite Data Calibration and Validation – Satellite Anomalies Presented to CGMS-43 Working Group 2 session, agenda item 3 Author: Weng.
600 MHz – Proposed TV Transition Objectives and Methodology
HF Radar Systems Engineering Plan
Update on the READER project
CEOS Work Plan Progress Report & Update
Ministry of National Economy of The Republic of Kazakhstan
Database SIG APNIC19 24 February 2005, Kyoto, Japan
Project Reflection Implement New Open-System Rating Engine
Purpose: Delphi Migration means migrating from old versions to latest versions. Delphi migration process becomes something of a living document, which.
Presentation transcript:

NPP/C1/C2 Antenna Deployment Schedule (COPC ) and Reducing Product Delivery Latency and COPC ) Jim Vermeulen And Selina Nauman

COPC Action Item The CSAB will acquire an NPP/C1/C2 antenna deployment schedule and identify the product delivery latency at each major milestone in the schedule.

3 System 95% EDR Latency as a Function of Receptor Site Installation Order- August 2009 C2 Launch - 5/16/2016 ► C1 Launch - 3/14/2014 McMurdo, Svalbard and Orlando New Zealand Japan Chile Alaska Arizona Spain India Hawaii Brazil Australia South Africa Guam Performance at C1 Launch Receptors will be brought online after C1 Launch

Percent of Products Delivered versus Time Since Observation at C2 launch (5/16/2016) Requirement: 95% of data delivered within 28 min Requirement: 77% of data delivered within 15 min Percent of Data Products Delivered SafetyNetTM architecture defines shape of curve

COPC Action Item Final reductions in NPOESS product latency will not be realized until C2 implementation (SafteyNet). CSAB will identify technical and/or budgetary issues that could be addressed to influence the schedule to deliver reduced product latency earlier in the schedule. –NESDIS provided the NPOESS CDR RFA #22 response which detailed the deployment/installation of the safety net sites to the COPC CSAB –COPC principles have requested NESIS work with IPO to find out the cost to activate the activate the sites to get to a 38 minutes latency on NPOESS C1 data delivery as soon as possible. –OSDPD setting up meeting with IPO Ground Systems Division Chief September 25, 2009.

Back-Up Slides

95% Latency Based on Revised Receptor Site Installation Order- April 2008 Longest EDR may be up to 3 minutes later than the aggregate

System Data Latency as a Function of Location at C2 launch (5/16/2016) System Data Product Latency, minutes Gaps between receptor sites are a primary driver of System Latency

Analysis Methodology for 95% EDR Latency Methodology –Cases run by adding SafetyNet sites in the proposed install order –Multiple DSAT runs executed at each case with weather and station outages DSAT Parameters –Satellites: 1 nominal orbit planes (1330) –Outages: Ao=0.996 (20 hr MTTR, 5000 hr MTBF), single McMurdo receptor –Rain: Worst Month Rain Statistics (ITU model) –Margin: 3 db link margin –Data Rates: Post Nunn-McCurdy, satellite dependent sensor compliment –VIIRS: VIIRS day / night acquisition and compression rates modeled –IDPS: IDPS queuing model. –DMR: Updated DMR processing model