© 2014 HDR, all rights reserved. I5-Broadway Weilder – Safety Analysis Jon Makler, ODOT Miranda Wells, HDR OR ITE Winter Workshop February 26 th, 2015.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Advertisements

4-1 Application Workshop. 4-2 Module Objectives Apply the concepts learned to a freeway lane closure Case 1. Without a back up Case 2. With a back up.
FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
WHAT DOES THE PROPOSED SERRA MESA COMMUNITY PLAN AMENDMENT Mean For You?
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Hansen’s Truck Stop Inc. Property in Humboldt County Charlie Fielder District Director Caltrans District 1.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Traffic Signals – Session #7.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Special facilities for Heavy vehicle on Steep Grades Chapter 16 Dr. TALEB M. AL-ROUSAN.
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
NCHRP 172: Signal Timing Improvement Practices
What is Temperature? Temperature may be defined as the condition of a body which determines the transfer of heat to or from other bodies. Use thermometers.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Emma Hand Dr. Heng Wei Sophmore GRA: Isaac Quaye Kartheek K. Allam Junior.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Interacting With Other Users. Most collisions occur when two or more objects try to occupy the same space at the same time. Drivers must identify movement.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
The Main Street Bike Lane Project LADOT Bike Program.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Virginia Department of Education
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
5/8/02FHWA Office of Safety1 FHWA Safety Core Business Unit Office-Level Structure Develops and manages programs for the safe operation of roadways, bicycle.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Project Sponsor: Ohio Department of Transportation District 12.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Case Study 4 New York State Alternate Route 7 Problem 2.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
July 16, 2014 Connected Corridors I-210 Modelling Demonstration Date: August 13, 2014 Caltrans District 7.
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
District 6 – Safety Applications
From North of River Road to North of State Road 681
Problem 5: Interstate 87 Interchange
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 5: Network Simulation
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Innovative Performance Evaluation Matrix for Solving Urban Freeway and Interchange Congestion
Presentation transcript:

© 2014 HDR, all rights reserved. I5-Broadway Weilder – Safety Analysis Jon Makler, ODOT Miranda Wells, HDR OR ITE Winter Workshop February 26 th, 2015

 I-5 Northbound/Southbound o Going to Morrison Ramps  Arterial Network o Broadway and Weilder  I-84 Eastbound Just past Grand Ramp Study Area

Emergency Braking = Deceleration Rate Greater than 14.8 ft/sec Existing Crashes Compared to Existing Calibrated VISSIM Results

Emergency Braking Southbound Event Analysis  In the no-build scenario (A2), there are roughly 80,000 events.  Most (84%) events occur north of Broadway.  In the “facility plan” scenario (B2), there are roughly 35,000 events SB (57% reduction).  The basic braid (c2) sees more events SB (38,000) compared to B2.  The “double braid” scenario (C2) has 36,000 events SB – in between B2 and c2.  Adding the two-lane flyover makes each scenario safer SB.  All the “build” scenarios reduce SB events north of Broadway by more than 60%. Only the braid options reduce SB events south of Broadway by a significant degree and the double-flyover makes a big difference. Going to Broadway Broadway to Morrison Total A155,52912,81863,348 A268,10613,28981,305 B113,07816,75929,837 B218,20316,30634,509 C119,3917,20926,600 C225,9859,82635,810 c118,1707,18325,352 c227,89010,31538,206

Why Emergency Braking? Closely Spaced Interchanges and bottlenecks spilling back into the study area are not accounted for in deterministic safety analysis. What are the Results Showing? Overall significant reductions in emergency braking instances for all the Build Options Adding a two lane flyover for the braided options improves safety on I-5

 Southbound visual representation of data Heat Maps

Weilder – I-84 Weave

Contact Information: Miranda Wells, PE Traffic Engineer HDR Questions?