IENG 471 Facilities Planning

Slides:



Advertisements
Similar presentations
Production Systems Design Types of Production Systems.
Advertisements

Chapter 12 GROUP TECHNOLOGY by Dr. Richard A. Wysk.
C3 – THE IMPACT OF CAD/CAM ON MANUFACTURING Option C: CAD/CAM.
4/27/2015 IENG 471 Facilities Planning 1 IENG Lecture 04 Schedule Design.
Process Selection and Facility Layout
Part IV MANUFACTURING SYSTEMS
Facility Design-Week6 Group Technology and Facility Layout
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
Computer Integrated Manufacturing CIM
3 Group Technology / Cellular Manufacturing
Process and Material Flow Analysis Chapter 3. Data requirement for layout decisions Frequency of trips or flow of material or some other measure of interaction.
IENG 475: Computer-Controlled Manufacturing Systems
Ch 18 Cellular Manufacturing
Product Design and Process Selection
Part IV MANUFACTURING SYSTEMS
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Computer Integrated Manufacturing CIM
Manufacturing Engineering Department Lecture 1 - Introduction
NC State University Department of Materials Science and Engineering1 MSE 440/540: Processing of Metallic Materials Instructors: Yuntian Zhu Office: 308.
Group Technology and Facility Layout
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
Flexible Manufacturing Systems Introduction to FMS/FAS.
How does ISAT331 fit in the curriculum?
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
Process (Job Shop) Layouts
Facility Design and Layout
GROUP TECHNOLOGY Chapter 10. GROUP TECHNOLOGY GROUP TECHNOLOGY IS A MANUFACTURING TECHNIQUE AND PHILOSOPHY TO INCREASE PRODUCTION EFFICIENCY BY EXPLOITING.
Egekwu.3311 ISAT 331 Module 3: GROUP TECHNOLOGY AND PROCESS PLANNING.
Ch 18 Cellular Manufacturing
Chapter 4 Process Design.
Manual Process Planning Manufacturing Processes (2), IE-352 Ahmed M El-Sherbeeny, PhD Spring 2014.
MGT Operations Management
Cellular Manufacturing
Process Layout Chapter 7 July 20, 2005.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 8 CELLULAR MANUFACTURING GROUP TECHNOLOGY E. Gutierrez-Miravete Spring 2001.
Cellular Manufacturing
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
UNIT-III Group Technology and Computer Aided Process Planning
FACILITIES LAYOUTS Facilities layout implies Layout design for equipment, machinery, & furnishings, production, support & personnel areas A layout is affected.
Process planning : Machining processes and parameters used to convert a piece part from an engineering drawing. The act of preparing detailed work instructions.
1 ME Production Planning and Inventory Control.
Facility Layout Objectives of Facility Layout Basic Types
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Managing Product & Production Planning Reading: pp. 250 – 275.
Manual Process Planning
Manual Process Planning
BUSI Operations Management
PRESENTATION GIVEN BY K.ARUN PRASATH ASSISTANT.PROFESSOR
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
MENG 447 Manufacturing Systems Automation Chapter 1*
FACILITY LAYOUT Facility layout means:
Organizing Production Equipment
IENG 471 Facilities Planning Schedule Design
Facilities Planning and Design Course code:
MANUFACTURING SYSTEMS
Manual Process Planning
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Departmental Planning
MACHINE GROUPING IN CELLULAR MANUFACTURING With Reduction Of Material Handling As the Objective 19/04/2013 lec # 25 & 26.
Flexible Assembly Systems
IENG 475: Computer-Controlled Manufacturing Systems
Presentation transcript:

IENG 471 Facilities Planning IENG 471 - Lecture 05 Group Technology – Production Flow Analysis 4/11/2017 IENG 471 Facilities Planning (c) 2005 D.H. Jensen

IENG 471 Facilities Planning Agenda Assignment Direct Clustering Algorithm King’s Algorithm Questions & Issues 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Assignments Current Assignment: HW 4 Download spreadsheet from the Group Technology II Link on the Materials page – follow the steps for Kings’ Algorithm HW: (HW 4) See Assignment Link Individual Assignment Can work together in groups, but each person turns in their own assignment PRINT out the initial and final matrix for each problem Highlight the family cells on the final matrix Interpret the final matrix of family cells – list which items compose each family, AND discuss how that affects the operation of the facility Next Assignment: Exam I 4/11/2017 IENG 471 Facilities Planning

Volume, Variety & Automation IENG 471 Facilities Planning Volume, Variety & Automation Rembold, et. al. Transfer Line 100,000 10,000 1,000 100 1 Production Quantity High Medium Low Increasing Flexibility Batch Flow Line Increasing Productivity Based on quantity to produce and the variety demanded, different strategies for mfg can be employed. Left, top is typical mass production equipment. Lower, right is typical job shop equipment (if automated). Middle ranges are typical of Batch Production. Flexible Mfg Sys Mfg Cell NC Machine 1 10 100 1,000 Low Medium High Part Variety 4/11/2017 IENG 471 Facilities Planning (c) 2005 D.H. Jensen

Layout Impact on Facility’s Machines Job Shop Layout Group by individual machines Add all equipment fractions, then round up* Mass Production Layout Group by individual products Round up* all equipment fractions, then add Cellular Layout Group by similar part-process families Add family equipment fractions, then round up*, then add * Multiply number of each machine type by footprint size after rounding to find the actual space required 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Layout Patterns Product Layout High Medium Product Volume Family / GT Cell Layout Bulky, Difficult to Move Equip. (Precision fixtures) Process Layout Low Fixed Location Layout Bulky, Difficult to Move Prod. (Planes, ships, etc.) Low Medium High Product Variety Can Have Combinations (HYBRIDS)! 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Examples For the following situations, what type of General Layout would you suggest? The assembly of bodies for GM midsize SUVs Fabrication & Assembly of custom made sheet metal parts Fabrication of computer cases for a line of desktop PCs, plus custom made sheet metal parts Assembly of three distinct families of electronic cards for inkjet printers Production of high quality, custom office furniture 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Group Technology (GT) Philosophy: Use the similarity of current products to simplify the design and manufacturing of new products Some Applications: Identify and reuse similar process plans Identify and reuse similar CNC programs Identify the equipment that may be best used in a particular machine cell Identify and eliminate redundant inventory Requirement: A taxonomy of part characteristics 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Benefits of GT Facilitates formation of part families and machine cells Quick retrieval of designs, drawings, & process plans Reduces design duplication Provides reliable workpiece statistics Facilitates accurate estimation of machine tool requirements and logical machine loadings Permits rationalization of tooling setups, reduces setup time, and reduces production throughput time Allows rationalization and improvement in tool design Aids production planning and scheduling procedures Improves cost estimation and facilitates cost accounting procedures Provides for better machine tool utilization and better use of tools, fixtures, & people Facilitates NC part programming. (Ham) 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning How to Identify Groups Similar Design Attributes Size of parts Geometric shape of parts Materials Technique: Parts Classification & Coding Similar Manufacturing Attributes Common processing steps (routings) Common tools and fixtures Technique: Production Flow Analysis Similarity groupings are called Part Families 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning PFA Introduction PFA is Production Flow Analysis A subset of Group Technology (GT) Goals: Reduce material transport efforts Reduce set up efforts Reduce work in process inventory Steps: Identify OP-Codes for each Component Routing/Process Planning information for each part Incidence Matrix Blocking (Triangularization) Algorithm Cluster Identification 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning OP-Codes An OP-Code forms an index to an Operation Plan An Operation Plan is a generalized sequence of steps, perhaps common to multiple parts An OP-Code Sequence is a method of condensing the Operation Plan into a compact structure suitable for data processing 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning OP-Code Example OP Code Operation Plan 01 Saw01 Cut to size 02 Lathe02 Face end Center drill Drill Ream Bore Turn straight Turn groove Chamfer Cut off Face 03 Grind01 Grind 04 Insp06 Inspect dimension Inspect finish Rotational Part (sectional view) 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning OP-Code Example OP Code Sequence 01 Saw01 02 Lathe02 03 Grind01 04 Insp06 OP Code Operation Plan 01 Saw01 Cut to size 02 Lathe02 Face end Center drill Drill Ream Bore Turn straight Turn groove Chamfer Cut off Face 03 Grind01 Grind 04 Insp06 Inspect dimension Inspect finish 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Incidence Matrix Rows represent OP-Codes (index = i) Columns represent Components (index = j) Cell Entries are: (Mij) 1 (or mark) - if the component requires the operation 0 (or blank) - if the component does NOT require the operation A-112 A-115 Saw01 1 Lathe01 Lathe02 Drill01 Mill02 Mill05 Grind05 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 1 Calculate the total (binary) weight of each column j: Wj =  2i Mij  i After Chang, Wysk, & Wang (1998) p.500 A1 A2 A3 A4 A5 A6 A7 A8 A9 A0 2i i S01 1 2 L01 4 L02 8 3 D01 16 M02 32 5 M05 64 6 G05 128 7 G06 256 Wj 138 48 10 336 Rank 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 2 Sort the columns into rank order, then go to Step 3: A4 A3 A5 A8 A9 A2 A6 A7 A1 A0 S01 1 L01 L02 D01 M02 M05 G05 G06 Wj 6 10 48 64 138 336 Rank 2 3 4 5 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 3 Calculate the total (binary) weight of each row i: Wi =  2j Mij  j A4 A3 A5 A8 A9 A2 A6 A7 A1 A0 Wi Rank S01 1 574 4 L01 2 L02 602 5 D01 1088 7 M02 64 M05 1408 8 G05 512 3 G06 1024 6 2j 16 32 128 256 j 9 10 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 4 If all rows are in rank order STOP; otherwise, sort the rows into rank order, and then go to Step 1: A4 A3 A5 A8 A9 A2 A6 A7 A1 A0 Wi Rank L01 1 2 M02 64 G05 512 3 S01 574 4 L02 602 5 G06 1024 6 D01 1088 7 M05 1408 8 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 1 (2nd time) Calculate the total (binary) weight of each column j: Wj =  2i Mij  i A4 A3 A5 A8 A9 A2 A6 A7 A1 A0 2i i L01 1 2 M02 4 G05 8 3 S01 16 L02 32 5 G06 64 6 D01 128 7 M05 256 Wj 18 48 132 56 448 Rank 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 2 (2nd time) Sort the columns into rank order, then go to Step 3: A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 L01 1 M02 G05 S01 L02 G06 D01 M05 Wj 18 48 56 132 256 448 Rank 2 3 4 5 6 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 3 (2nd time) Calculate the total (binary) weight of each row i: Wi =  2j Mij  j A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 Wi Rank L01 1 2 M02 128 5 G05 64 S01 126 4 L02 124 3 G06 1024 6 D01 1152 7 M05 1792 8 2j 16 32 256 512 j 9 10 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 4 (2nd time) If all rows are in rank order STOP; otherwise, sort the rows into rank order, and then go to Step 1: A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 Wi Rank L01 1 2 G05 64 L02 124 3 S01 126 4 M02 128 5 G06 1024 6 D01 1152 7 M05 1792 8 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 1 (3rd time) Calculate the total (binary) weight of each column j: Wj =  2i Mij  i A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 2i i L01 1 2 G05 4 L02 8 3 S01 16 M02 32 5 G06 64 6 D01 128 7 M05 256 Wj 18 24 26 160 510 Rank 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 2 (3rd time) Sort the columns into rank order, then go to Step 3: NO CHANGE IN SORTED ORDER! A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 L01 1 G05 L02 S01 M02 G06 D01 M05 Wj 18 24 26 160 256 510 Rank 2 3 4 5 6 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 3 (3rd time) Calculate the total (binary) weight of each row i: Wi =  2j Mij  j A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 Wi Rank L01 1 2 G05 64 L02 124 3 S01 126 4 M02 128 5 G06 1024 6 D01 1152 7 M05 1792 8 2j 16 32 256 512 j 9 10 4/11/2017 IENG 471 Facilities Planning

King’s Algorithm – Step 4 (3rd time) If all rows are in rank order STOP; otherwise, sort the rows into rank order, and then go to Step 1: SINCE THE ROWS WERE IN RANK ORDER, WE STOP! (yea!) A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 Wi Rank L01 1 2 G05 64 L02 124 3 S01 126 4 M02 128 5 G06 1024 6 D01 1152 7 M05 1792 8 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Partitioning Ideally, the cells form mutually exclusive blocks (as below). These blocks define the Families: Family A consists of Components A1, A3, A4, A5, A8, and A9; which can be machined in a cell performing Operations G05, L01, L02, and S01 Family B consists of Components A0, A2, A6, and A7; which can be machined in a cell performing Operations D01, G06, M02, and M05 A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 L01 1 G05 L02 S01 M02 G06 D01 M05 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Partitioning Often, the cells do NOT form mutually exclusive blocks (as below). In this case, the capability for Operation G06 must be common to both machining cells: Family A consists of Components A1, A3, A4, A5, A8, and A9; which can be machined in a cell performing Operations G05, G06, L01, L02, and S01 Family B consists of Components A0, A2, A6, and A7; which can be machined in a cell performing Operations D01, G06, M02, and M05 A4 A3 A5 A8 A9 A1 A2 A6 A7 A0 L01 1 G05 L02 S01 M02 G06 D01 M05 4/11/2017 IENG 471 Facilities Planning

Strategies for Overlapping PFA Blocks: Provide for transporting some components between cells requiring the overlapping operation(s) Pick the component(s) with the smallest volume(s) to transport to reduce handling costs Locate the cells with operation overlap as near to each other as possible to reduce handling costs Avoid scheduling concurrent production runs of the components that require overlapping operation(s) Assumes that the equipment providing the overlapping capability can be easily moved between cells This solution may improve capacity if the overlapping operation is a bottleneck Put equipment capable of the overlapping operation(s) into each cell requiring it Assumes the additional equipment capability is cost justifiable This solution will improve capacity if the overlapping operation is a bottleneck 4/11/2017 IENG 471 Facilities Planning

IENG 471 Facilities Planning Extended GT (PFA) Requirements: Need for grouping similar items together, and identifying separable items Matrix of related entities: Tooling Equipment Parts Integrated Circuits Modular Components Solution Method: Triangularization Direct Clustering Algorithm King’s Method Kusiak’s Triangularization Method Ullman’s Design Structure Matrix 4/11/2017 IENG 471 Facilities Planning

Relationship (Incidence) Matrix Rows and Columns: Parts requiring operations on different machines Tools (in a CNC magazine) needed to produce part families Departments requiring technicians (shared head count) Departments requiring adjacent location ICs requiring modularization An entry in the incidence matrix means that there is a strong relationship between the row and column items 4/11/2017 IENG 471 Facilities Planning