Current status of AMoRE-10 cryostat

Slides:



Advertisements
Similar presentations
Participants: C-1:Cryogenic last-stage suspensions (interferometers) (F.Ricci-G.Frossati) Objectives: -Design new suspension elements for the last stage.
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
First Xenon Liquefaction at Nantes by using Pulse Tube Cryocooler Workshop FJPPL’07, 9-12 May 2007, KEK, Japan Tom Haruyama (KEK) Eric Morteau, Patrick.
ICEoxford Limited. Development of ICE Beam line equipment Copyright © 2011 ICEoxford Ltd Starting Point A simple Continuous Flow (CF) system.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
USDA Plant Hardiness Zone Map. Shows the lowest temperatures that can be expected each year in the United States, Canada, and Mexico. These temperatures.
Electric cooling from room temperature down to 200 mK M.Tarasov, L.Kuzmin, and I.Agulo, Chalmers University of Technology, S41296, Göteborg, Sweden V.Mikheev,
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Brad Moore M.S. Student Room: Hometown: Rochester, MN Thesis: Development of a Passive Check Valve for Cryogenic Applications.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
An Autonomous Dilution Microcryostat- Insert for Nano Physics V. S. Edelman, Institute for Physical Problems RAS, Moscow, Russia The cryostat with base.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Slide 1 D G Haase, EDM Meeting, 5/06 Refrigeration and Heat Budget for the EDM Cryostat David G. Haase Physics Department North Carolina State University.
Cryogenic Refrigeration Maha Hosain. Background Info Cryogenics – science of production and effects of very low temperatures Limit to lowest temp—absolute.
Joule-Thomson Refrigeration Sam Coogan. Adiabatic Expansion Many ways to have adiabatic expansion – Constant Entropy (Isentropic) – Constant Internal.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
LCGT Cryogenics Status Report KEK T.Suzuki.
Materials and Cooling Techniques G. Frossati, A.de Waard, L.Gottardi and O.Usenko Kamerlingh Onnes Laboratory Leiden, The Netherlands.
G-2 Cryogenic System. Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts.
Ultra-cryogenics for advanced resonant detectors (C2) G.Frossati Kamerlingh Onnes Laboratory Leiden, The Netherlands Second ILIAS-GW Meeting.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
[A proposal for ILIAS NEXT: Cryogenics versus vibration] [I3-FP7 call] Abstract The reduction of thermal noise in solids is a basic requirement in many.
Sir William Ramsay Morris M. Travers
Cryogenics for FPP S. Masi Two inter-related issues: –Cryogenic chain for the focal plane (final temperature 0.1K) –Thermal system to radiatively cool.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
„Cryogen-free“ Dilution Refrigerators
50 Years of Dilution Refrigeration
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Dilution Refrigerators with Superconducting Magnets
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
Continuous Sorption Cooling in Activated Carbon-Nitrogen Using Metal Foam as Regenerator Indranil Ghosh Cryogenic Engineering Centre, IIT Kharagpur ICEC.
Date of download: 6/3/2016 Copyright © ASME. All rights reserved. From: Comparison of the Straight Adiabatic Capillary Tube Expansion Devices Used in Refrigeration.
R. Bonomi - SLHiPP2, Catania 3-4/5/20121 SPL Thermal Studies R. Bonomi Superconducting linacs for high power proton beams - Catania, 2012.
Call us on Toll-Free. Call Us Now Toll Free.
Toll Free Toll Free.
Call us on Toll-Free Call Us Now Toll Free.
Michael A. Green and Heng Pan
Teleconf ACS – FREIA 28th March 2017
Aalto University, Espoo, Finland
The Development of the Dilution Insert and some Tunneling Experiments
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Fiber optic sensors integration in magnets and in test facilities
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Goddard Space Flight Center
Teleconference ACS – FREIA 10th May 2017
Frederick Schwartz MS Graduate Student Room/Office: From: Fort Atkinson, WI Undergraduate: ME, UW-Platteville ‘08 Thesis:
Audrey Looby Riley Stanford Janine Tobia
Cryogenic Measurement with 8800D Vortex
Cryogenics, Cryostat, Optics Technology Development
Recover Yahoo Mail Password Forgotten Password
نظـــريــات الإستثمار الأجنبـى
نشأة التأمين البحري وتطوره
Eric Alar Master’s Student Mechanical Engineering Room: 1337 ERB
x 2 is positive A square number is always positive unless it’s zero.
Онлайн ПР за киното Онлайн кино за ПР или.
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Periodical meeting about the 'control system ‘
Budker Institute of Nuclear Physics,
PANDA Cryostat and Yoke
BSE Magnetic Levitation Oil Free Centrifugal Chiller Traditional Chiller.
Optical fiber based sensors for low temperature and superconductors
Presentation transcript:

Current status of AMoRE-10 cryostat

Cryostat for AMoRE-10 (Contracted & manufacturing) Cryogen-free Dilution Refrigerator for AMoRE 10 Leiden Cryogenics Pulse Tube based CFDR Model : CF-1200-Maglev Minimum Temperature : <10 mK Cooling-power : 1.4 mW at 120 mK Cool-down time : ~ 20 hours with LN2 precooling without any extra load Contract informations December, 23, 2013 Price : 420,000 euro Delivery : shipped within September, 26, 2014 Delay penalty : 630 euro/day, Max. 10%

Experimental space of AMoRE 10 cryostat Single LTD cell 35 CMO crystal (10 kg) 5 layers, 7 columns CMO crystal, 2 MMC, 2 SQUID, and copper holder. 408 mm 550 mm M. C. bottom to 50 mK shield top 60 mm 70 mm Cu shield, lead blocks, and S/C shield inside the M. C. Outer-most dimension Including Cu holder Installation : possible, but tight

Arrangement of single cells Shape of single cell present will be tested Arrangement of cells 35 single cells are installed on the mounting unit Mounting unit is surrounded with the superconducting shield Superconducting shield including mounting unit will be supported by string string SC shield String type loading : vibration and thermal connection of M.C. plate Mounting unit Under developing of prototype

Lead shield in the MXC Lead shield inside the refrigerator 700 Kg Lead shield in M. C. 100 kg lead shield in M. C. Cool-down time to base temperature Expectation : 1 week with LN2 pre-cooling Lead bricks will be installed at the bottom of the M.C. plate Additional Lead bricks for surrounding detectors : under discussion Customization Materials (IVC can, OVC can, thermal shield, etc) IVC can & thermal shields : high purity copper internal radiation Lead bricks IVC can : fabricating (welding) so difficult Dr. Li-Jin is searching proper company Each temperature plate : OFE grade copper under discussion

Activation by the air transport (for reducing delivery time) Activation during the air transport  Copper of Aurubis company  The copper components in the AMoRe10 refrigerator are made with this test block 1 : delivered by airplane (10 × 10 × 3 cm, 2.44 kg) will arrive Y2L by tomorrow test block 2 : shipped (03/ 03/ 2014) (10 × 10 × 3 cm, 2.44 kg) coming soon - Using a Ge detector of Y2L, Dr. J. H. So will measure and compare the activation degree of two test blocks delivered by airplane and ship - Based on the result, the transportation way of AMoRE 10 refrigerator will be decided.

Loading a cryostat Base frame for CFDR loading Lead shield CFDR Base frame for CFDR loading Solid enough to load our system  safety evaluation Thickness of lead shield 100 mm  150 mm

Loading a cryostat move All lead shields are designed that it can be move for the experimental space  1.5 m experimental space Person have to do a work on the base-frame : two persons possible

A5 Lab in the Y2L The maximum height of LTD Lab : 3.7 m 270 mm space between ceiling and the top of the lead shield Muon veto or other stuffs have to be set between the 270 mm space. Very tight

Arrangement in A5 Lab Pump E-rack station Refrigerator Detector 193 mm AMoRE-10 Fridge LTD office Additional Fridge AMoRE-10 refrigerator : will arrive at middle or late October 2014 Additional refrigerator : under contacting will be ordered early or middle June

Arrangement in A5 Lab Refrigerator, E-rack, pumping station, and compressor : 2 set Exhaust, air conditioning, and arrangement : more discussion Electrical power, coolant flux : determined All of construction : depends on “”””“ Dr. K. S. Park ”””””