Automatic Position Control in the A2-Beamline Patrik Ott Institut für Kernphysik Johannes-Gutenberg Universität Mainz 08.03.2010.

Slides:



Advertisements
Similar presentations
Perspectives for an energy increase of MAMI C Andreas Jankowiak Institut für Kernphysik Johannes Gutenberg – Universität Mainz Cristal Ball.
Advertisements

Graph of Exponential Functions
Instructor:Po-Yu Kuo 教師:郭柏佑
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
WP 4.2 review meeting Status of the ESA work... Wednesday, 13 September 2006, UCL,
May 22, 2008 TJRMICE Beamline Collimation and Correction 1 Tom Roberts Carol Johnstone Muons, Inc.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
RF SYSTEM DESIGN FOR THE TOP-IMPLART ACCELERATOR V. Surrenti, G. Bazzano, P. Nenzi, L. Picardi,C. Ronsivalle, ENEA,Frascati, Italy ; F. Ambrosini, La Sapienza.
Television 1 Jess UEAB2006 Television Sync Separator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Principles of MRI Physics and Engineering
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
RF Synchronization, control and stability Takuya Natsui.
CIS 540 Principles of Embedded Computation Spring Instructor: Rajeev Alur
Computer Based Data Acquisition Basics. Outline Basics of data acquisition Analog to Digital Conversion –Quantization –Aliasing.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
IPBSM status and plan ATF project meeting M.Oroku.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Improvements of the A2 beamline for the linear polarised beam Patrik Ott Institut für Kernphysik Johannes-Gutenberg Universität Mainz
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Analog Discovery Arbitrary Function Generator for Windows 7 by Mr
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
Solid State Microwave Oscillators Convert dc energy to microwave signals Can be used as generators in all communication systems, radars, electronic counter.
ASICS for MEMS BRILLANT Grégory 13 th of October.
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Design Realization lecture 22
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Rational Functions Essential Questions
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Security Systems BU Communication Systems Slide 1 Commercial Presentation Plena Loop Amplifier.
Notes Over 9.2 Graphing a Rational Function The graph of a has the following characteristics. Horizontal asymptotes: center: Then plot 2 points to the.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Copyright © 2005 Heathkit Company, Inc. All Rights Reserved Automating and Integrating Residential Systems Presentation 4 – Control of Entertainment Equipment.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Antenna Basics.
Professor Philip Burrows John Adams Institute for Accelerator Science Oxford University ACAS School for Accelerator Physics January 2014 Longitudinal Dynamics.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute.
Condition Monitoring of Generators
CIS 540 Principles of Embedded Computation Spring Instructor: Rajeev Alur
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
Low Temperature Phase Transitions in GdPdAl
SIGNAL CONDITIONING Signal conditioning is stage of instrumentation system used for modifying the transduced signal into a usable format for the final.
Potential and Current Control
Collimation and tagging instrumentation
AUTOPILOT The autopilot or automatic pilot is a system of automatic controls that holds the aircraft on any selected magnetic heading & returns the aircraft.
BEAM DISTRIBUTION FLATTENING TECHNIQUES
Commissioning the Fast Orbit Feedback System at SSRF
Y. Irie, KEK for the LOI collaboration
BESIII EMC electronics
I Alexander Nass for the JEDI collaboration
Rogowski coils as beam position monitors
Notes Over 9.3 Graphing a Rational Function (m < n)
Orbit Feedback / Chamonix 03 / J. Wenninger
Rogowski coils as beam position monitors
Linac Diagnostics Commissioning Experience
Presentation transcript:

Automatic Position Control in the A2-Beamline Patrik Ott Institut für Kernphysik Johannes-Gutenberg Universität Mainz

Abstract Main Principles Realization at MAMI –XY – Monitors –Correction Magnets Integration in MAMI control-system Results

A2-Beamline TM 110 Scanners already installed

Main Principles

Asymptotic Stability a 0, b 0 : starting positions at the XY-Monitors as, b s : desired positions at the XY-Monitors a n, b n : positions at the XY-Monitors after the n th step dx k /dI l : the derivate of the position in the k th XY-Monitor with respect to the current in the l th magnet. After the first step: After the second step: constant ckck

Choice of Controllers Horizontal Pair of Controllers c WEDL06 – DIPL07KO0.33 WEDL06 – WEDL ( 0.11 ± 0,02 ) DIPL07KO – WEDL Vertical Pair of Controllersc WEDL06 – WEDV WEDL06 – DIPL WEDV07 – DIPL ( Rüdiger Fritz, 1998 )

A2-Beamline TM 110 Scanners already installed possible horizontal Controllers possible vertical Controllers

Cavity readout Preamplifier with 44dB Need to decrease frequency to 100 kHz Due to the low voltage, a Lock-In Amplifier is used for measurement. Up to now a relay toggles horizontal and vertical signals.

Integration in MAMI control-system The aim is to design an interface that is easy to use by the MAMI-operators. Problems with the Lock-In Amplifiers: correct phase adjustment integration time at least 2 sec. unpredictable behaviour in case of overload

Present Status All components are installed Horizontal parameters have been measured Service-routine for MAMI control system is running

Next Steps Measure vertical parameters ( 3 h beamtime ) Determination of the minimum beam current ( 2 h beamtime ) Integration in the Crystal Ball data acquisition