Statistical Process Control

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Operations Management Statistical Process Control Supplement 6
Chapter 9A Process Capability and Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
[1] MA4104 Business Statistics Spring 2008, Lecture 06 Process Monitoring Using Statistical Control Charts [ Examples Class ]
Agenda Review homework Lecture/discussion Week 10 assignment
Control Charts  Control Charts allow a company’s performance over time to be analyzed by combining performance data, average, range and standard deviation.
Chapter 18 Introduction to Quality
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
Quality Control Ross L. Fink. Quality Control n Quality control involves controlling the delivery processes to adhere to the specifications (or product.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
T T20-06 Control Chart (with Runs Tests) Purpose Allows the analyst create and analyze a "Control Chart". A visual analysis of the control time.
Control Charts.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
T T20-00 Range Chart Control Limit Calculations Purpose Allows the analyst to calculate the "Range Chart" 3- sigma control limits based on table.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
STATISTICAL PROCESS CONTROL SPC. PROCESS IN A STATE OF STATISTICAL CONTROL.
Control Charts. On a run chart the centerline is the median and the distance of a data point from the centerline is not important to interpretation On.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 16 Improving.
X-bar and R Control Charts
Statistical Process Control
Process Capability and SPC
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Introduction to Control Charts: XmR Chart
Process Capability and Statistical Process Control.
Chapter 10 Quality Control.
Statistical Process Control (SPC)
CONTROL CHART FOR QUALITY CONTROL _ X-R CHART _ X-R chart is a pair of chart consisting of a average chart (X chart) and a range chart (R chart). The X.
By: Samah Tout and Bing Liu Team Potassium Sigma Nov. 20,2007.
Statistical Process Control
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Statistical Quality Control
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
Slide 1 Copyright © 2004 Pearson Education, Inc..
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
Quality Control  Statistical Process Control (SPC)
Process Capability and Statistical Quality Control.
Control Charts. Statistical Process Control Statistical process control is a collection of tools that when used together can result in process stability.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Internal Process Model Monitor Role Competency: Managing Collective Performance.
Process Control Charts By: Brian Murphy. Control Charts are an on-line process- monitoring technique. Used to determine if a process is capable or out.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Tech 31: Unit 3 Control Charts for Variables
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Chapter 7 Process Control.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Theoretical Basis for Statistical Process Control (SPC)
Agenda Review homework Lecture/discussion Week 10 assignment
Variable Control Charts
What is the point of these sports?
Track 2 - Wednesday, 9:00am to 10:15AM
The Certified Quality Engineer Handbook Ch
The Certified Quality Engineer Handbook Ch
Control Charts - SPC Types of Control Charts:
Development and Interpretation of Control Charts
Statistical Process Control
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process Capability.
Statistics for Business and Economics
Basic Training for Statistical Process Control
The Certified Quality Engineer Handbook Ch
Presentation transcript:

Statistical Process Control Variables Data Click Here to Begin

Objectives: Introduce Statistical Process Control Understand the process of creating an X bar R Chart Understand the methods used in monitoring SPC charts

SPC Introduction

Variability Normal Variability: Non-Normal Variability: -Normal variability is the inherent variability within a process (It is the best the process can do in terms of variability) -If you want to reduce normal, or inherent, variability you will usually have to redesign the process Non-Normal Variability: -Non-normal variability is a result of special causes -The objective of the SPC chart is to determine when special causes are present

Developing X Charts: Per Juran’s Quality Handbook, the basic procedure for developing X Charts is as follows: 1.) Select the measurable characteristic to be studied 2.) Collect enough observations (20 or more) for a trial study (The observations should be far enough apart to allow the process to potentially be able to shift) 3.) Calculate control limits and the centerline for the trial study using the formulas given later

Developing X Charts: 4.) Set up the trial control chart using the centerline and limits, and plot the observations obtained in step 2 (If all points are within the control limits and there are no unnatural patterns, extend the limits for future control) 5.) Revise the control limits and centerline as needed (by removing out-of-control points by observing trends, etc.) to assist in improving the process 6.) Periodically assess the effectiveness of the chart, revising it as needed or discontinuing it

SPC Xbar R Chart

Equations: UCL = Ave + (3*Sigma) LCL = Ave – (3*Sigma) Vs. UCL = Ave + (A2*Rbar) LCL = Ave – (A2*Rbar) (A2*Rbar) = (3*Sigma)

Control Chart Factors

Xbar & R Chart Average Range Average of Averages Constant

Example: Variable Data To find the average take the sum and divide it by the number being added together. Determine Average(s) for data

Example: Variable Data To find the range list the numbers under consideration from lowest to highest value, then subtract the lowest value from the highest value Next determine the range(s) of data

Example: Variable Data

Example: Variable Data Now calculate the UCL: To calculate the UCL first find the sum of all sample averages: = Sum = 8.36 Then take the sum and divide it by the number of numbers added together: 8.36/16 = 0.52 Average of Averages (X double bar) = 0.52 0.66 0.29 0.61 0.39 0.48 0.57 0.63 0.54 0.47 0.40 0.77 0.58 0.28 0.90

Example: Variable Data Now calculate the UCL: To calculate the UCL next find the sum of all sample ranges: = Sum = 9.44 Then take the sum and divide it by the number of numbers added together: 9.44/16 = 0.59 Average range (R bar) = 0.59 0.60 0.56 0.59 0.96 0.37 0.75 0.65 0.84 0.49 0.76 0.67 0.48 0.28 0.19

Example: Variable Data Now calculate the UCL: Recall the formula for the UCL is: UCL = Average of Averages + (A2*Average Range) -or- UCL = X double bar + (A2*R bar) Thus far we have calculated the average of the averages and the average range, so the formula becomes: UCL = 0.52 + (A2*0.59)

Example: Variable Data Now we will find A2. A2 is a constant found on the following table:

Example: Variable Data

Example: Variable Data To finish the calculation of UCL we simply plug the values into the formula: UCL = X double bar + (A2*R bar) UCL = 0.52 + (0.577 * 0.59) UCL = 0.86

Example: Variable Data Calculate the LCL: Now calculate the LCL using the formula: LCL = X double bar - (A2*R bar) LCL = 0.52 - (0.577 * 0.59) LCL = 0.18

Example Recap: The UCL and LCL have been calculated and were found to equal: UCL = 0.86 LCL = 0.18 What does this mean? One would expect 99.73% of sample averages (n = 5) to lie within the range of the UCL and LCL due to normal variation. . . In other words, one could expect 99.73% of all sample averages to lie between 0.86 and 0.18

Now complete the Xbar Chart:

R Chart: The next steps are to calculate the upper and lower control limits for the Range Chart --The objective of the Range chart is to detect changes in variability Recall: UCL = (D4*R bar) LCL = (D3*R bar)

Now complete the R Chart: We have already found R bar to be = 0.59 -so- UCL = 2.114*0.59 LCL = 0*0.59 UCL = 1.25 LCL = 0

Now complete the R Chart:

Monitoring Control Charts SPC Monitoring Control Charts

Completed X bar R Charts:

Control Chart Interpretation Rules: Look for Special Causes, which are suspect when: 1.) One or more points are above the UCL or below the LCL 2.) Seven or more consecutive points are above or below the centerline 3.) One in twenty plotted points is in the 1/3 outer edge of the chart 4.) Movements of five or more consecutive points are either up or down

Completed X bar R Charts: Special Cause

Special Cause Variation If special causes are identified, the process is considered to be ‘unstable’ Removing special causes when they are harmful (which is most of the time) is an important part of process improvement Tracking down special causes often relies heavily on people’s (operators, supervisors, etc.) memories of what made that occurrence different

Special Cause Variation When you spot a special cause: Control any damage or problems with immediate (short term) fix Once a ‘quick fix’ is in place, search for the cause Once you determine the special cause, develop a longer-term remedy

Statistical Process Control Variables Data—The End