IPO Presentation November 2011
September VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review, Dec. 15, 2010 Major Successes Rising Corporations
September Location 180 km south of Ring of Fire 170 km north of railhead at Nakina, Ontario Ontario Wabassi: Proposed Rail link Wabassi
September VTEM – Preliminary Targets A2 Anomaly E New Exploration Camp Location
September Assay Results Anomaly E Long Run Price Zn $ 0.60/ lb Ni $ 5.00/ lb Cu $ 1.50/ lb Ag $ 16.00/ Oz Au $ / Oz Drill Hole From (m) To (m) Interval (m) Ag (g/t) Cu% Ni% Zn% Au (g/t) $/ton Value
September VTEM – EM - New Targets (Scales Equal) Block 2 VTEM Block 3 VTEM Anomaly ‘E’ VMS Discovery VTEM Survey Size Comparison & Location, Referencing New VTEM Targets – Blocks 2 & 3 **Note: Based on ground & downhole geophysics & drilling (4 holes) the mineralization contained within Anomaly E is 650m in length, averages 24m thick, and is open along strike in both directions and at depth!! Anomaly “E” VMS Discovery A-2 VMS Discovery
September Capital Structure *as of July 31, 2011 Common Shares Issued38,475,000 Fully Diluted45,575,000 Investment Assets$1,525,200 Cash$803,149* WPX Debenture$4,450,000 Converts at IPO Price Shares and Assets