Status report for revision of API 17F

Slides:



Advertisements
Similar presentations
ASTM Work Item Collaboration Area February Purpose of Collaboration Space Web forum that enables a task group to accelerate the development of a.
Advertisements

Status report for revision of API 17F (ISO )
4/25/20151 The Code-Making Process National Electrical Contractors Association.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
March 2015 Doc.: IEEE NNN Submission Karen Randall, Randall Consulting Slide 1 IEEE 802 Response to comments on IEEE 802.1Q-2014 and IEEE 802.1Xbx-2014.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
API 17V By Christopher Curran January 2013 API 17V – Subsea Safety API Winter 2013.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
API 17Y Subsea chemical injection system RP for Design, Testing & Operation Task Group Status June 23, 2015.
SC18:TG8 API Specification Q1 Guidance Document.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
Copyright © 2011 Deloitte Development LLC. All rights reserved. 0Footer Weekly Update: 11/14 Total Negatives (606) Negatives Resolved (127) Minor (65)
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Supply Chain Management Report for SC 18 January 2013.
API 19 CI Chemical Injection Devices for Downhole Applications
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group G Report January 17, 2003
Tge draft ballot information
API 17X Subsea Boosting January 13, 2015
WG Technical Editor’s Report
Task Group API 19SS Sand Screens
API Subcommittee 17 - Specification 17D January 2016 Status
API 16C Choke and Kill Equipment
Task Group Status January 2014
API SC6 Valves and Wellhead Equipment
Potential Milestones A timeline to finish in one year
Guidelines for Internal TGad Comment Submission and Resolution
Guidelines for Internal TGad Comment Submission and Resolution
API SC 10, Work Group 3 Update:
doc.: IEEE <doc#>
API 17H TASK GROUP January 15, 2013.
Task Group G Report March 10, 2003
API Summer Standardization Conference
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17H ROV/ROT Interfaces
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
Motion – P Rev/D2 to Sponsor Ballot
doc.: IEEE /479r0 Mika Kasslin TGh chair
Specification on float equipment
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
LMSC Policy and Procedures Update
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 17H ROV/ROT Interfaces
Tge draft ballot information
Motion – P Rev/D2 to Sponsor Ballot
Task Group G Report January 17, 2003
The Code-Making Process
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
Task Group Status January 2013
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP June 26, 2013.
API 16A January 24, 2019 Winter Conference – San Antonio
Presentation transcript:

Status report for revision of API 17F API Winter 2014

Status Draft document was re-balloted by API ballot closing on March 2013. Ballot passed with 17 affirmative and 2 negative votes. Total of 110 comments, (22 technical), 3rd edition will be published as a standard Now on 3rd ballot, deadline 24th January 2014 NB Section on chemical injection has been deleted

Milestones Milestone Targets Completion Date Comments from second ballot complete 4Q 2013 3rd ballot closure 24th January 2014

API 17F working group Name Company Al Williams Dril-Quip Crispin Richards Genesis Brian Skeels FMC William Taggart Murphy David Lansberry Spiridon Ionescu IntecSea Jay Hursh Aker Solutions David Bell Bechtel John Allen Don Ogwude CSI John Simon Shell Mott Gochnour BP Mike Brashear Chevron Jake Hennig Oceaneering Lee Mitchell Nancy Chafe Anadarko Richard Barratt GE Vetco William St George ExxonMobil Christopher Curran