Simone Bizzi In collaboration with: Dr Andrea Nardini Technical Director of CIRF (Italian Centre for River Restoration) Model and evaluate geomorphology.

Slides:



Advertisements
Similar presentations
Millennium Ecosystem Assessment Northern Australia floodplain and coastal wetlands Max Finlayson National Centre for Tropical Wetland Research Darwin,
Advertisements

Big Cypress/Caddo Watershed Geomorphic Classification
Flood Profile Modeling with Split Flows and Weirs
Bankfull / Effective / Dominant
Use of a hydrodynamic model to
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
Clearwater River Habitat/Bioassessment
The adequacy of the existing reserve system for the protection of freshwater ecosystems Janet Stein Fenner School of Environment and Society.
Implementation of WFD in Hungary - rivers Zoltán Simonffy Hungarian Academy of Sciences Research Group for Water Management Zoltán Simonffy Hungarian Academy.
Simon linke robert. l. pressey robert c. bailey richard h. norris the ecology centre university of queensland australia
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
0 The National Hydrography Dataset Plus a tool for SPARROW Watershed Modeling Richard Moore (presented by Alan Rea)
Lewis Creek Reach M19 Phase 1, Phase 2, and Phase 3.
Watershed Assessment (ENSC 202)
Uses and Applications Marc Naura & Mark Diamond RHS Lead Region.
Uses and Applications M. Naura & J. Walker RHS Lead Region.
Biological Objectives Tied to Physical Processes Dr. William Trush Scott McBain Arcata, CA.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
Toby Hull South East Rivers Trust March 2015 The Constraints of Connecting Habitat and Fish Passage in an Urban Environment.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Watershed Assessment and River Restoration Strategies
FRM02 (BSEIM) Scotland Broad Scale Ecosystem Impact Modelling
Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Hydromorphological quality elements,
24 Hour Freephone Water Pollution Hotline Risk Assessment Refinement Use field data to refine Article 5 risk assessment pressure thresholds.
Stream Ecology: River Structure and Hydrology Unit 1: Module 4, Lectures 1.
Water Framework Directive – Coastal issues Will Akast Catchment Delivery Manager-Suffolk.
Uses and Applications M. Naura & J. Walker RHS Lead Region.
Suggested Guidelines for Geomorphic aspects of Anadromous Salmonid Habitat Restoration proposals G. Mathias Kondolf.
Richard Jeffries and Roy Richardson Improving Scottish Rivers Proposals for delivery.
MA BF REFERENCE CURVES Objective Develop bankfull regional curves and equations for estimating bankfull width, mean depth, cross-sectional area, and discharge.
Temporal and spatial patterns of basin scale sediment dynamics and yield.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Michael T. Lee October 17, 2012 Title Restoration Target Tool C AROLINA V EGETATION S URVEY.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
PNAMP Habitat Status and Trends Monitoring Management Question: Are the Primary Habitat Factors Limiting the Status of the Salmon and Steelhead Populations.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Baird Claytor Hydroelectric Project Sedimentation Study.
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
RIPARIAN PROPER FUNCTIONING CONDITION A Tool for Integrating the Fundamental Sciences into Collaborative Decision-Making.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification River.
RIVER HYDROMORPHOLOGY
1. Water Trust Board Grant Agreement Scope and Objectives: Removal of islands below the Isleta Diversion Dam Restore this reach of the Rio Grande to the.
Run of the River Introducing a healthy rivers board game Proudly presented by: Swap with Regional WW logo.
EPA HWI Comments on CA Assessment June 26, 2013 HSP Call 2 major categories of comments: – Report writing (we will work on this) – Content/Analysis/Discussion.
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Morphology Methods for Rivers in the United Kingdom Dr. Chris Bromley Ecology Partnership & Development Unit Scottish Environment Protection Agency.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
WJEC GCSE Geography A Unit 1 – The Core A- The Physical World Theme 1 Water.
SFS Sacramento May 23, 2016 Special Session Introduction: Traits-Based Vulnerability Assessment and Monitoring Under Climate Change Britta Bierwagen (EPA/ORD),
Cumbria Floods Partnership: Some background, some considerations and practitioners’ aspirations. Jim Ratcliffe Eden Catchment Director July 2016.
Bridges Reach analysis Fundamental tool for design
Morphodynamic and Sediment Tracers in One-Dimension
Improving Fish Passage on the River Almond
Techniques for restoring biodiversity: What works
OptiMIZING ROAD INFRASTRUCTURE FOR FLOOD PREPAREDNESS AND EMERGENCY AND POST EMERGENCY RESPONSE FRANK VAN STEENBERGEN
Impact of climate change on water cycle: trends and challenges
Module 10/11 Stream Surveys
Erosion Patterns in Austin Streams
Streams Hydrodynamics
Streams Hydrodynamics
River Basin Planning & Flood Risk Management in Scotland
LIFE and the implementation of the Water Framework Directive
AESTHETIC EVALUATION of URBAN WATERCOURSES
Module # 17 Overview of Geomorphic Channel Design Practice
Longitudinal Profile Survey for Successful Culvert Replacement
In-Stream Structures & Grade Control
Presentation transcript:

Simone Bizzi In collaboration with: Dr Andrea Nardini Technical Director of CIRF (Italian Centre for River Restoration) Model and evaluate geomorphology under different catchment management strategies

What is Geomorphology? “..the study of sediment sources, fluxes and storage within the river catchment and channel over short, medium and longer timescales and of resultant channel and floodplain morphology” (Newson and Sear 1993)

Geomorphology and river management? Annual expenditure on Flood Defence > £500 million WFD requirement to maximize habitat quality

Aims of the research Model and evaluate geomorphological features under different catchment managements strategies National Level Regional/River Basin Level Catchment/Coastal cell level Community Level Site/System level

Why River Habitat Survey? 10 years of experiences and more than samples only in England and Wales Assessments and decisions are taken using this dataset Feedbacks for the next versions

Is it the database suitable?

Problems to face Limited information in the variables Dynamic system in space and time Typology: Every river has its behaviour

Index (Targets – Geomorphological Features) Model approach More experiences in literature Geomorphology (CAESAR,REAS, HEC- RAS..) They require detailed and specific data Most of the time not catchment scale Evaluation phase most of the time is missing National Level Regional/River Basin Level Catchment/Coastal cell level Community Level Site/System level Modelling Evaluating Information (Causal Factors) Evaluation

Model approach Modelling Evaluating Phase 1: A cluster analysis able to find pattern in the data and structured them in a way suitable for the evaluation Information (Causal Factors) EvaluationIndex (Targets – Geomorphological Features)

Model approach Phase 2: A classification model able to give an output suitable for an evaluation Modelling Evaluating Information (Causal Factors) EvaluationIndex (Targets – Geomorphological Features)

RHS site Geomorphological Features (targets): Numbers of Bars Numbers of Pools and Riffles Type of Bank vegetations Numbers of woody debris Bankfull width CONCEPTUALIZATION

RHS site Natural variables (Causal Factors ) Slope Flow Regime Geology CONCEPTUALIZATION

RHS site CONCEPTUALIZATION Percentage of Land Use in the sub-catchment (Causal Factor ): Vegetated Urban Improved Grass Land Arable

RHS site CONCEPTUALIZATION Percentage of area in the sub-catchment obstructed by dams or artificial reservoirs (Causal Factor )

d1 d2 d3 d4 RHS site CONCEPTUALIZATION RHS sites Level of modification in the sites and upstream (Causal Factors) Hard Modification :  Resectioning  Bank and channels reinforcements  Embankments Soft Modification:  Weirs  Bridges  ford.. Culverts

d1 d2 d3 d4 RHS site i CONCEPTUALIZATION x i (t+1)= f( u RHS,i (t),u cat,i (t), Nat(t) ) x i = f( u RHS,i,u cat,i,Nat) STEADY STATE

Clustering Step

Natural Variables (VERTICAL path) Vs Anthropogenic Variables (HORIZONTAL path)

Clustering Step C1 C3 C2 Riffles and Pools BarsBank vegetation Mean C Mean C

Model capability ? ? C1 C3 Arable Urban Land Vegetat ed Grass land Mod. Up stream Mod. in the site C1 mean C1 std C2

SCENARIOS rate (% in Class C1) Scenario zero (untouched)100 Reduced Hard Interventions in the site (80%)85 Reduced Hard Interventions in the site and up-stream (80%)66 Land Use changes (-50% Arable - 20% Urban ->Vegetated)87 All together24 ? ? C1 C3 C2 Model capability

Scenarios rate (% in Class C1) P(x/ C1) P(x/ C2) P(x/ C3) Scenario zero (untouched) Reduced Hard Interventions in the site and up- stream (80%) ? ? C1 C3 C2 Model capability

The weakness of a site specific approach Flexible Geomorphological tool at national level RHS limits Conclusions

Future Directions Assessing the feasibility to add biology Developing a “site specific” case study to overcome some limitations intrinsic in the national level Analysing the level of “integrability” between these two different approach

Thank you for your attention!