Managing Utilities The Katy Freeway Reconstruction Program

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Constructability Review
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Great Western Corridor Feasibility Study
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Melissa Owen Texas Department of Transportation Right of Way Division May 17, 2005 KATY FREEWAY PROJECT.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Oklahoma Department of Transportation Susan McClune Regulatory Services.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Central Texas Turnpike Project. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike Project.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Environmental Assessment Public Meeting
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Overview of the Federal Aid Process for Transportation Projects.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
AMENDED LAWS FOR UTILITY COORDINATION 2009 AASHTO R/W & Utilities Subcommittee Conference April 22 nd.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Old Policy – which no one ever seem to have heard of.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement.
Partners in Progress Forming Bonds with GECs to Build Roads.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
PROJ. 566(17) LOR PID MAJOR WIDENING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

Managing Utilities The Katy Freeway Reconstruction Program Ken Stayer PBQ&D AASHTO/FHWA 2005 Right of Way and Utilities Subcommittee Conference May 18, 2005

Project Limits Overview

KATY FREEWAY RECONSTRUCTION PROGRAM Construction Cost Estimate CLAY RD. HEMPSTEAD ADDICKS RESERVOIR BLALOCK 290 FRY RD. MASON BARKER CYPRESS S H 6 ELDRIDGE FRANZ FRANZ WILCREST BELTWAY 8 GESSNER BINGLE WIRT KIRKWOOD ANTOINE COLONIAL PKWY DAIRY ASHFORD WESTVIEW POST OAK ECHO VOSS PARKWAY GRAND ROSENER BARKER CLODINE MEMORIAL CHIMNEY ROCK HIGHLAND KNOLL BRIAR FOREST SAN FELIPE Preliminary Subject to Change BARKER RESERVOIR WESTHEIMER RICHMOND WEST PARK Construction Package Contract A B C1 C2 D E1 E2 F G Utility Cost Estimate $3 Million $41 Million $18 Million $25 Million $71 Million $56 Million $42 Million $62 Million TBD Proposed Letting Date 7/2003 5/2003 3/2005 12/2004 7/2004 1/2005 2/2005 1/2007 End of Construction 7/2006 6/2006 8/2008 12/2008 11/2008 12/2007 3/2009 Construction Cost Estimate $83 Million* $208 Million* $153 Million* $84 Million* $250 Million* $204 Million* $158 Million* $263 Million* $38 Million The seven proposed construction contracts were jointly designed by ten engineering design companies, all working to develop the final plans. Break points between projects were selected to optimize constructability of any transitions that might be needed. *Actual Low Bid Amount Texas Department of Transportation Vegetative Landscaping, Aesthetic Walls and Final Signing/Striping will be awarded as separate contracts.

Looking East at Kirkwood Typical Freeway Condition Looking East at Kirkwood

The Reconstruction Program Reconstruction of 25 miles of Interstate Freeway under traffic; including 2 miles on I-610 2 Freeway-Freeway Interchanges 27 Grade Separated Intersections One of the Largest Highway Construction Projects in the State’s History First Project in the Nation to Construct Toll Lanes on an Existing Interstate Highway Nine Major Construction Contracts $318.4 Million of Utility Adjustment Cost

Program “Firsts” Largest TxDOT Project Use of Major Investment Study (MIS) Process Corridor-Wide Program (Not Individual Projects) Use of General Engineering Consultant (GEC) for Design and Construction Inspection Fast Track Implementation of Program Addition of Toll Road in Median of Interstate Twice the Normal Lettings Schedule Outsourcing ROW Acquisition Activities on Corridor Basis

Role of the GEC for Utilities Phase I - Design Be a Surrogate for TxDOT Establish Project-wide Standards & Criteria Coordinate Utility Designs with 10 Roadway Section Design Consultants (SDC) and 32 Utility Companies Distribute Design Plans and Host 30%, 60%, 70%, 90% and 100% Utility Design Coordination Meetings Provide Utility Agreement Review as Requested by TxDOT Develop and Coordinate ROWD Approval of Utility Exceptions to Policy Develop and Maintain a ROW and Utility Adjustment Status Tracking Documents Develop and Maintain the Utility and ROW Sections of a Project Website

Existing Utilities @ Beltway 8 From Level B SUE

Early Conceptual Section

Proposed Utilities @ Beltway 8

Proposed Section West of Beltway 8

Proposed Section @ SBC Manhole West of Beltway 8

Role of GEC for Utilities Phase II – Construction Be a Surrogate for TxDOT Utility Inspection Services Submit Weekly Inspector Diaries, SW3P Reports, Construction Progress Reports, Survey Information Photographs and Maintain Redline Plan Sets. Establish Project-wide Standards & Criteria Coordinate Utility Field Change Reviews with SDC’s and Potentially Affected Utilities Host and Attend various Utility Construction Coordination Meetings Distribute Weekly Utility Conflict List and Schedules for Partnering Meetings

Role of GEC for Utilities Schedule Utility Attendance at Weekly Partnering Meetings as Required to Update Schedules Develop and Coordinate Solutions for Utility Conflicts Identified During Construction Develop and Maintain ROW Status Tracking for Vacate Dates, Utility Disconnects/Reconnects, ACM Testing and Contractor Removals Maintain the Utility and ROW Sections of Project Website for Roadway Change Order Transmittals Maintain Utility and ROW Composite Mapping Provide Inspection of 48 to 52 Utility Contractors Working on the Corridor Weekly

Challenge & Issues TxDOT Use of GEC for Utility Inspection Temporary Utility Adjustments Potential Impacts of Construction Delays Maintenance of Milestone Schedules Consistency Across Projects ROW Acquisition, Testing, Disconnects and Clearing Impact to Adjacent Properties Permanent Utility Relocations Construction Sequence Traffic Maintenance

CenterPoint Transmission Temporary Adjustment

CenterPoint Transmission Permanent Adjustment

Composite Cut Sheet 67

Composite Cut Sheet 74

Roadway Contract Schedule Schedule of ROW Entry / Utility Relocation Parcel No. Prep ROW Util Relo Rdwy Const 60 2/14/05 3/14/05 6/1/05 61 2/28/05 3/28/05 6/1/05 62 2/14/05 3/14/05 3/14/05 63 2/14/05 3/14/05 6/1/05 100 2/14/05 3/14/05 6/14/07 101 5/15/05 6/15/05 6/4/07 103 3/1/05 4/1/05 6/1/07 677 8/1/05 9/1/05 6/4/07

Construction Cost “Drivers” Time Constrained Schedule ROW Acquisition Tight Border Width for Utilities Limited Work Forces Magnitude of Traffic Handling Material Shortages Scope Changes Labor Rate Increases

GEC Tools Bi-Weekly Status Meeting with District Senior Staff Weekly Roadway Contract Partnering Meetings Bi-Weekly Utility Coordinator and Inspector Meeting Bi-Weekly ROW Team Meeting Project Solve Web Site Extensive Project Contacts Database Excellent Working Relationships Dedicated Inspection Staff 30 Minute Rule

SBC Katy Freeway Construction Facts Copper Sheath Feet 938,641 (178 miles) Million Conductor Feet (MCF) 2,342.167 Fiber Sheath Feet 510,291 (97 miles) Derived RT Pairs 97,028 Copper Pairs Terminated CO. 109,700 Fiber Strands Terminated at CO. 6,168 Conduit Trench Feet 232,797 (44 miles) Proposed New Manholes 383

Major Investment Study Project Development Process 1995 1997 1999 2001 2003 2005 2007 2009 Public Participation & Outreach Public Participation & Outreach Advanced Planning Advanced Planning ROD Preliminary Design Preliminary Design Reevaluation 1995-1997 Major Investment Study Environmental Studies Environmental Studies We Are Here Detailed Design Detailed Design ROW & Utilities Roadway Construction

Program Contact Information Visit Our Website: www.katyfreeway.org Call or Visit: Katy Public Information Office 11757 Katy Freeway, Suite 1100 Houston, TX 77079 281-589-5924 The Public Information Website (www.katyfreeway.org) is accessible to interested viewers world-wide. It will play a major role keeping the public informed as the Program goes forward.

Thank You! Questions?