IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
Planned place to install
Planned method of installation 4 holes in angle bars 4 drilled blocks box on 4 scrubs
Electrical schematics prepared
Cable schedule updated PT709, PT712 Vacuum pressures UX15 level 6 FCTIR X3.1 NG connect USA15 level 6 FCTIR Vacuum AUSA15 Level 6 2X X X3.4 4 PT809, PT812 Vacuum pressures UX15 level 6 FCTIR X3.5 NG connect USA15 level 6 FCTIR Vacuum BUSA15 Level 6 2X X X3.8 4 TS71x vacuum feedbacks plus spares UX15 level 6 FCTIR X3.9 NG connect USA15 level 6 FCTIR Vacuum AUSA15 Level 6 2X X X X X X X TS81x vacuum feedbacks plus spares UX15 level 6 FCTIR X3.17 NG connect USA15 level 6 FCTIR Vacuum BUSA15 Level 6 2X X X X X X X3.24 8
Box manufacturing in progress
Component installation progress
What is already done: Box installation location selected and agreed with CRYO Preliminary support design - done Electrical schematics for cable patching - completed IBL general cable schedule updated Box internal design completed What still needs to be done: Install all components inside the box – now (George) Add interconnection box 3D model in Smart Team (Tomek B.) Install box in the cavern (George) Update electrical schematics for the Vacuum system Summary
Thank you for your attention