2D vs. 3D Grade Control Systems

Slides:



Advertisements
Similar presentations
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Advertisements

Construction Technology
Grading Features V11.2 AccuGrade and GCS900
New Features Trimble GCS & Cat AccuGrade
Spectra Precision Laser Entry Level Machine Control
Trimble® GradeMax™ What is grade max. Trimble® GradeMax™ What is grade max.
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
Road Institute Overview. Volvo Construction Equipment Road Institute Road Institute Overview 2 History  Blaw-Knox established the Road Institute in 1965.
EXCAVATORS HYPACK 2013.
3D Machine Control Systems
Compacting and Finishing Part 2
County Road Administration Board Presenters: Mike Hasslbauer Technology Solutions Manager Western States Equipment Company
Trimble 2D & 3D Grade Control Systems for Dozers & Graders
CCS900 for Asphalt Compactors
17 AND 18 AUGUST, 2010 EUGENE, OREGON RON SINGH CHIEF OF SURVEYS /GEOMETRONICS MANAGER OREGON DEPARTMENT OF TRANSPORTATION Design to Dozer.
Trimble 2D & 3D Grade Control Systems for Excavators
Trimble GCSFlex for Excavators
Chapter 11 Finishing Equipment
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Trimble ® LOADRITE ® X2350 Payload System for Excavators.
AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt
Principles of Paving rev Principles of Paving.
Trimble 2D & 3D Paving Control System for Pavers
Trimble Compaction Control Systems for Soil Compactors
Introduction to Trimble GCS900 / Cat AccuGrade Version 12.2
1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB.
Paver System Five Control Box Overview Aug 2009 Control Box Overview Paver System Five.
Lecture 6 Loading and Hauling
Grade Control Systems and Applications. Topics  Benefits of using Grade Control technology for earthmoving projects  Grade Control Systems and applications.
MAKING PROGRESS POSSIBLE 11/20/09 Technology in the Dirt GIS Day – McAllen, TX.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
Spectra Precision Laser DDS300 Depth Display System for Excavators
1 Laser Drilling of Cylindrical and Shaped Holes NCMS/CTMA Symposium: Track 1b Terry L. VanderWert PRIMA North America, Inc.
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
Fuel Control GateControl CarWash Control. CardMaster is the industry low cost fleet fueling controller for trucking, public works, & farm fleets. CardMaster’s.
Trimble CCS900 Compaction Control System Overview
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Trimble CCSFlex for Compactors. Topics  Introduction  Product Positioning  CCSFlex and The New Flex Family  System Overview  Summary.
December 2002 Endos DC has been designed from scratch. Every component of the system is completely new: –new generator –new tubehead –new arm –new timer.
GCS 300 System Operation Application – Level 1.
Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009 AFB80 Session 404 January 12, 2009 Contractor Best Practices Transportation Research Board.
Equipment Setup GCS300 – GCS900 Components Presented By:
Trimble Grade Control Systems for Milling Machines and Cold Planers Presenters name.
2D Machine Control Systems
Presentation - Date (change on Slide Master) Paver System Five Slope Sensor Theory of Operation.
Basic knowledge Asphalt paving
2010 GPS Presentation - Kevin Dahler. 3D Grade Control (GPS)
Elevator Contractor Bobby Albright Period 5
GCS400 Lift & Tilt Dozer Control System
2D Guidance for Excavators on the 3D Display. Configuring a 2D Hex Machine If this was a 2D only display you would only see “Depth and Slope”
Trimble Grade Control Systems
PCS400 Software Phil Jackson Training Manager January 2009.
Trimble GCS900 Grade Control System. Definition: Construction The act or result of – Conceptualizing (we need a airstrip) – Interpreting and planning.
PCS400 Quiz Phil Jackson Training Manager May 2009.
PCS900 v1.0 3D Asphalt Paving Sales Presentation.
PCS400 Software\ v1.1 Phil Jackson Training Manager May 2009.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
Trimble Component Sheets 2015
CONSTRUCTION AND MINING EQUIPMENT SUBMITTED BY : SHASHI RANJAN.
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
3D Paving Training AutoAdjust
Manufacturers, Suppliers & Exporters of
Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session,
THE SOLUTION TO REVOLUTIONISE YOUR VEHICLES
“A Revolution in Rotary Equipment”
ActivRAC® 16P Mobilized Storage System
Surveying Equipment.
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Presentation transcript:

2D vs. 3D Grade Control Systems Presenters Name

2D vs. 3D Grade Control Systems 2D (Conventional) Laser / sonic / sensor guidance Program elevation/cross-slope from cab Manually adjust design elevation increments Simple designs 3D GPS or UTS guidance Design loaded into cab from site design Automatically adjusts to position of machine on site Capable of complex designs

Trimble GCS900 2D Contractors and owner operators with basic grade control needs Provides flexibility to grow Invest today in GCS900 2D Upgrade later to GCS900 3D

GCS900 2D - Applications A wide range of applications Small to large pads Small to large commercial building sites Sports fields & tennis courts General site elevation control Rough grading to finish grading Road construction & maintenance Rail installation & maintenance

GCS900 3D - Applications A wide range of applications, including: Road & highway building Large commercial Residential development Complex grading designs Land reclamation Landfill installation Rail installation & maintenance Airport construction

PCS - Applications A wide range of applications, including: Projects with stringent compaction requirements Road & highway building Large Commercial & residential development Complex paving designs Landfill installation Rail installation & maintenance Airport construction

Trimble GCS Family Benefits Get the job done right the first time Faster completion Less re-work Less staking Less checking Lower costs Improved material yields Faster job cycles and lower operating costs Improving productivity… adding up to a stronger bottom line for your company

GCS900 2D Dozer Components LB400 (3) LR410 1 or 2 AS400 VM4XX CB450 PM400

GCS900 3D Dozer Components MS992 1 or 2 MS992 SR300 LB400 x3 CB450 MT900 AS400 VM4xx SNRx10 - or - SNM930 - and / or- SNM940 PM400

GCS900 2D Grader Components RS400 AS400 x2 LB400 x3 - or - - or - CB450 -or- CB460 LR410 1 or 2 SR300 1 or 2 ST400 1 or 2 PM400 VM4xx

GCS900 3D Grader Components LB400 x3 AS400 x2 - or - - or - CB450 -or- CB460 - or - MT900 MS992 1 or 2 MS992 SR300 SNM930 - and / or- PM400 SNM940 ST400 Optional VM4xx

CCS900 Compactor Components CB450 -or- MS992 1 on cab - or - 1 or 2 on drum - or - - or - - or - AS400 MT900 CM310 CB460 LB400 SNM930 - and / or- SNM940 Printer

Trimble 3D GCS900 Excavator MS992 1 or 2 AS460 AS450 Tilt bucket (optional) CB450 CB460 LB400 x3 AS455 Roto-Tilt - or - SNRx10 SNM940 MT900 -or-

PCS400 Paver Components CS200 ST200 AS200 ST200 CS200 *Sonic Averaging - or - - or - AS200 ST200 CS200 *Sonic Averaging Beam CB440 Single - or - Dual * Depicted is the European sonic averaging beam, the North American version has a different design

PCS900 Paver Components *AS200 and SNR2410 AS450 MT900 *ST200 CB460 **Sonic Averaging Beam *CB440 Single - or - Dual * The 2D Components (CB440, AS200 and ST200) can be replaced by a MOBA-Matic or Cat branded 2D system ** Depicted is the European sonic averaging beam, the North American version has a different design

GCS900 Milling Components AS400 MT900 VM420 PM400 (optional) SNRx10 SNM940 - and / or- CB460 CB450 -or- Interface Box

Thank you