Gluing penetrators with (data) fibers and copper (power) cables at Nikhef. Version: 22052013_V2 Date: June 19 2013 A.Korporaal – Nikhef Amsterdam.

Slides:



Advertisements
Similar presentations
Electro-Chemicals Products For Semiconductor Assembly Industry P4018-ST Molten solder purified-able chemical powder compound (AOP – 22S, a short name of.
Advertisements

Mixtures and Solutions
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Chapter 5 Developing a Negative. Step 1 Remove the film from your camera Remove the film from your camera Look for a button on the bottom of your camera.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions Edvotek Set Up 12 groups.
HVAC523 Soldering.
Flasking ,Wax elimination Packing and Processing
Basic Refrigeration Cycle
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Click on this image to open the full PDF document.
Raytech telecommunication - Copper products Raytech telecommunication TRAINING PROGRAMME XAGA.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions VWR Set Up 12 groups Mira Costa kit.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Conduction, Convection, & Radiation
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Hard Floor Care VCT floor deep scrub This presentation is available for review at:
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
Measurement.
Experimental Procedure Lab 402. Overview Three different experiments are complete in a calorimeter. Each experiment requires careful mass, volume, and.
Wiring MVRT 2010 – 2011 Season. Table of Contents Wire stripping Crimping Soldering.
Concrete Construction
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Kinetic Energy and Heat Transfer
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Sketchup Tutorial Designing for Construction. The Parts of a Wall.
Stycast Insertion Part 3 and preliminary glue picture on samples
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
Basic Bowl Turning. 1. Draw circle on top of board. 2. Cut to size on band saw. 3. Sand one surface of the bowl and the top o the waste block that is.
Introduction to Soldering
Dayview™ LCD Film – Installation Procedures. Equipment Required : Latex gloves and face mask Glue cleaner (alcohol) & glass cleaner Special glue, spray.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
TRENTON Casing Filler Presentation
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Computer Hardware Technology
W. Ebenstein Duke University Encapsulated Wirejoints Motivation: To use existing “proven” glass joints but protect them from chemical attack Design: start.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Motorcycle gas tank rust removal & sealing Notes: 1.These are suggested instructions 2.Only applicable to steel gas tanks 3.Sealer won’t work on plastic.
1 Getting a Sample to Test your Board!. 2 Step 1: Opening the detector housing Open the detector housing and remove the lid.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Rubber Cleaning Sheet Worldwide distributor: CIRCLELINK ENTERPRISE PTE LTD 28 Sin Ming Lane, #07-146, Midview City Singapore Phone : (65)
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
Epoxy Infusion System – Hardener SIN B17 Polynt’s SIN B17 is the world’s first Epoxy resin hardener based on anhydride chemistrythat has been specially.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
VIEW SERIES with Sliding Door
Planning for Proto-DUNE PD Installation and Cabling at CERN
Sapphire Fused Silica and EP30-2
BORDER SEAL After finish the festooning of all polished surfaces and carving of the cast in the post dam area. Now the next step is to do border seal.
ROX sensor packaging and mounting scheme for use on dilution STM sample plates Ben MacLeod Jan
Tracker Outer Barrel COOLING Antti Onnela, CERN.
PPM-DOM. SPM DOM LCM SS-part ILxx
WLS FIBER-SCINTILLATOR GLUING UPDATE
2.2 Gallon TourTank Installation
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Home Use Fingerstick Technique Training
TRENTON Casing Filler Presentation
Presentation transcript:

Gluing penetrators with (data) fibers and copper (power) cables at Nikhef. Version: _V2 Date: June A.Korporaal – Nikhef Amsterdam

Mounting penetrator B02 (AA5080) in HERA-pressure vessel.

Penetrator B02 (X2) (AA5080) failed at approx. 50 bar ! Identical were applied in Motril-tests. Hole filled with oil caused by leakage along fibers and one copper feed trough.

Analyzing failed penetrator B02 (X2) (AA5080) (Applied in Motril tests- April 2013) Epoxy observed along copper cable along 25mm between shrink sleeve and cable (capillary effect) 12mm Epoxy observed here

Failure of B02-penetrator (AA5080) = (X2) at approx. 50 bar ! Post Mortem analysis: 1.Fibers not broken (laser beam (1310nm) checked) 2.Leakage along fiber feed trough (Ø0,7) (no displacement of 2 fibers observed.) 3.Leakage along 1 (Cu-) power- feed through (Ø1,3) observed Possible causes: a.Vertical gluing applied. ( viscosity and gravity helps epoxy flow along a larger distance. ) b.Epoxy between isolation and shrink-sleeves was observed (Capillary effect !?) c.Glue (EPOTEK 353ND) cured for 120 min. at 80°C => O.K ! After curing (12 hrs.) => ? d.Underwater test with air along the shrinkage around the wire isolation shows air bubbles on opposite site. e.Before analyzing we pulled out the cables. The EPOTEK glue was brown colored (full cured) inside the feed-through, but also a poor filling ! Till 25 mm below we observed bad cured epoxy (yellow colored) between wire isolation ! => Need attention ! => Isolation of wires FREE space (min. 2mm) to epoxy ?! f.Shrinkage was applied BEFORE epoxy curing ! => Capillary effect, no epoxy observasion possible.

DOM Penetrator gluing procedure. Applicable for PPM-DU and forthcoming (Pressure tested at 600 bar (60MPa) ) Use horizontal gluing only !! (used for MPMT-DOM ( 31 x 3” pmt’s) in Antares, succesful tested at 400 bar. Prevent capillary effects by means of isolation offset (min. 2mm !!) Apply all shrink sleeves AFTER epoxy curing ! Use ethanol for degreasing/cleaning each wire and fiber with wipes. 2 fibers (B.B.-XS) and both copper AW 6712 and AW 6715 were applied in PPM-DU DOM. Hardened EPOTEK 353ND Before curing: Transparent/yellow After curing: Amber/Brown Isolation offset w.r.t. G10-stud min. 2mm for all wires ! Fill all holes careful with EPOTEK 353ND (use cocktail picker) until a filleted shape is visible outside the G10-stud both BEOC- and DOM-side ! Note: Apply epoxy from this side only ! Curing time: min. at 80°C + 12 hrs. at 80°C DOM side BEOC side Picture 01

Horizontal gluing (two wires / 2 fiber(s) ) Note: Technical drawings are leading => consult them ! HORIZONTAL Gluing procedure (ambient temp.: >20°C !) Material needed: Epotek 353ND – 4 gram packs. Disposable round aluminum mixing tray. Wooden cocktail pickers. 1. Prepare necessary copper wires Alpha Wires 6715 L= 600mm: * Strip insulation over 100mm (both cables) 2. Clean all stripped copper- and feed through (par ex.: STUD 3A- AA6247) using wipe tissues with ethanol during 60 sec. 3. Pull the copper wires trough the G10-stud and mount this on the aluminum heater. Switch on the heater. 5. Thoroughly mix the Epotek 353ND pack and put the glue in a disposable round aluminum mixing tray. Take note of the time ! The potlife is max. 4 hours. Don’t use it after 4 hours !! 4. Put on stripped part of each copper wire EPOTEK 353ND separately with a cocktail picker Only at the BEOC side and watch for the glue to appear on the other side, this might take some time (1- 2min). On average 3-4 drops of glue are needed. Cure at 80°C during 1 hrs. Be careful not to spill glue on anything else than on the surface of the G10 stud and be careful not to put glue in the hole for the fiber. Put some thermal isolation on the heater and copper wires. To make sure the wire does not cool down the glued area too much. Below 60°C the glue does not cure properly ! See NEXT page…….. Observe if epoxy EPOTEK 353ND until a filleted shape is visible outside the G10-stud. Picture 02 DOM sideBEOC side

Note: Technical drawings are leading => consult them ! HORIZONTAL Gluing procedure (ambient temp.: >20°C !) 5. Prepare (1-12) B.B.-XS Fiber(s) L= 1000mm: Place fiber on flat table desk and strip insulation along approx mm at 500mm from edge very careful by chemical stripping. Use paint stripper (Alabastine Super Afbijt) or special coating stripper. Soak the fiber for 2 minutes in the coating stripper. Gently clean the fiber using a wipe tissue with ethanol. Do this by wiping one time (max. 2 times) over the fiber. Repeat this a second time with a new wipe tissue with ethanol. It prevents that any residue is left on the fiber. 6. After a amber/brown discoloration is observed at the glued area of the G10-stud, the fiber can be feed trough the G10-stud. Make sure the stripped part of the fiber is in the G10-stud. 7. Same gluing procedure as the copper wires. If a stripped fiber area is outside the stud very gently put some glue on to the bare fiber. This protects the fiber. 8. After 1 hour and if the glue is discolored the stud with the wires and fiber is ready for the next step. 9. Put heat shrink sleeves on the copper and fibers. (Low temperature heat shrink sleeve) Use a temperature hot air heater set to 130°C to shrink the sleeves. See NEXT page…….. Horizontal gluing (two wires/1-12 fiber(s) ) CONTINUED Observe if epoxy EPOTEK 353ND until a filleted shape is visible outside the G10-stud. Picture 02 DOM sideBEOC side

Note: Technical drawings are leading => consult them ! HORIZONTAL Gluing procedure (ambient temp.: >20°C !) 10. Clean the titanium part with a tissue with ethanol. Insert the G10-stud with the wires and fibers into the titanium feed-trough. Mount this onto the heater. Switch the heater on. (80°C) Pull the stud via a copper wire completely to the bottom of the titanium feed-trough. Make sure it stays there ! Add about 3 drops of Epotek glue in the hole from the BEOC side. Watch what happens when the glue is applied. There is enough glue if there is a small fillet visible at the edge between the G10- stud and the titanium wall. 11. Thermally isolate the heater with the feed trough. 12. After at least 12 hours of curing at 80°C the feed-trough should be ready for the silicone rubber compound. 13. Mix the silicone rubber compound (Polyservice PS 8530 A/B) in 1:1 ration in a disposable round aluminum mixing tray. 14. Use a syringe with a dull needle to apply the glue. If the feed through is still warm the silicone will harden within minutes. This enables to fill the holes with silicone compound with a single batch of silicone. Fill the holes both on BEOC and VEOC side as well till penetrator edges. This have to be done in vertical penetrator orientation ! The penetrator is ready! See NEXT page…….. Horizontal gluing (two wires/1-12 fiber(s) ) CONTINUED Observe if epoxy EPOTEK 353ND until a filleted shape is visible outside the G10-stud. Picture 02 DOM sideBEOC side

Penetrator PPM-DU (Antares) gluing assembly. Penetrator assembly without electrical/optical feed-though. View from DOM to PS 8530-silicone compound cured compound (dark green colored) hardness 30 shore A

Recommendations: 1.Apply horizontal gluing. 2.Clearance (minimal 2 mm) between isolation/ shrink-sleeves to prevent capillary effects. 3.Follow applying and curing instructions of epoxy (EPOTEK 353ND) very carefully ! 4.Apply heat shielding around gluing tool is to secure ambient temperature around product better during epoxy curing. 5.Apply all shrink-sleeves AFTER epoxy curing to prevent possible capillary effects !!

(Preliminary) Laser test on (serial) fibers (May ) at 1 bar (dBm) at 600 bar (dBm) 1310 nm-6,92-7, nm-6,78-7,10 DOM-penetrator 2x copper (AW6715)+ 2 B.B-XS fibres (AA6299) = (X3) at 600 bar ! (Pressure load: 100 bar/6,5 minutes) May Nikhef- H147b

DOM-Penetrator (AA6299) PPM-DU-Capa Passero. 2x Power (AW6715) + 2x BendBright-XS Fibre Interface Pressure vessel /Penetrator

Mirror Tissue (Oil) Leakage observation tools.

Poly-Service bv Amsterdam H.J.E. Wenckebachweg 49a 1096 AK Amsterdam (bedrijventerrein Amstel Businesspark-Oost) Telefoon: Fax: Hardheid Shore A 30. Packaging 2 kg (1 kg A + 1 kg B component). Mix ratio (mass) : 1:1 “Open time” Apply in: max. 15 min. Hardened after approx. 1 hr. Hardened after 24 hr.. Ambient temperature: min. 15°C. Artikelnr Prijs:€ 72,12